Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on April 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flood Frequency Analysis (FFA) Manual for Hydrotechnical Practitioners in Canada

Closed
5000075974International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Environment and Climate Change Canada is seeking a contractor to develop a comprehensive reference manual for hydrotechnical practitioners in Canada as part of the Flood Hazard Identification and Mapping Program. The primary objective is to provide professional guidance on various Flood Frequency Analysis methods to improve flood planning and preparation across the country. The manual must detail the application, strengths, and limitations of different methods, provide worked examples using real data, list available software tools, and include a decision tree to help practitioners select the most appropriate analysis method for specific project locations. The contract is scheduled for an initial duration of six months, with a possible six-month extension. Selection will be based on the highest rated proposal within the established budget. There are no security requirements for this solicitation, and the government encourages bids from businesses owned or led by under-represented groups to support social and economic objectives.

General Info

Contractor to develop a hydrotechnical reference manual for Canadian flood frequency analysis methods.

Documents

2

5000075974--amendment-002---rfp_e.pdf

PDF

5000075974---request-for-proposal_en_fdocx.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Environment and Climate Change Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Maureen MateushPoint of Contact

Full Description

Show more
Flood Frequency Analysis (FFA) Manual for Hydrotechnical Practitioners in Canada Solicitation Number: 5000075974 The Flood Hazard Identification and Mapping Program (FHIMP) is an initiative of the Government of Canada with the goal of helping Canadians better plan and prepare for future floods. As a contributor to the FHIMP, Environment and Climate Change Canada (ECCC) provides guidance and best practices for hydrology, hydraulics, climate change impacts, and uncertainty. Under this mandate, ECCC is working to deliver an instructive manual for engineering and hydrology practitioners outlining methods to calculate a Flood Frequency Analysis (FFA). FFA provides information about the magnitude and frequency of flood discharges based on recorded data. The most common method for flood frequency analysis is to fit an extreme value distribution to an annual maximum series of peak flow data. This is appropriate in many cases; however, there are several under-utilized FFA methods that may be more appropriate in specific situations in Canada. The objective of the Work is to create and develop a reference manual for hydrotechnical practitioners in Canada to assist with preparing for future floods in Canada. The manual will describe various flood frequency analysis methods, their application (including worked examples for each method), limitations, input variables to the method and how to obtain the variables, and the tools currently available to complete the analysis. The Contractor must draft a reference manual for the intended audience of hydrotechnical practitioners in Canada. The Contractor will explore various methods to complete a FFA as outlined in Tasks 1 and 2. Each method must be described in its own section of the manual and must include, but not be limited to, the following: a. Description of the method including cases in which the method should be applied, and strengths and weaknesses of each method. b. A worked example on real gauged data (or appropriate real data for the methods that do not use gauged data). The selected example data should highlight the intricacies of that method. c. Lists of computer code and/or software options available to carry out the FFA for each method, and assessment of these options. d. A decision tree or flowchart indicating which method should be followed for FFA for any given project location or hydrologic inputs. Practitioners will utilize this resource to determine the method they should follow for any given project. The contract is for a period of approximately six (6) months with the possibility of an additional six (6) months. Evaluation and Selection Methodology - Highest Rated within Budget There are no security requirements associated with this solicitation. Environment and Climate Change Canada supports the Government of Canada’s social and economic objectives, including increasing the participation of businesses from under-represented groups in government procurement opportunities. As such, bidders owned or led by Canadians from under-represented groups, such as women, LGBTQ2+ persons, persons with disabilities and persons from visible minorities are encouraged to submit a bid to this opportunity. For additional information, interested suppliers must contact the Contracting Officer named in this Notice. GSIN: E103

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS