Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Floyd Little Athletic Center Flooring

Closed
2026-ITB-369State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
2027-016 Gym Floors Sand & ReSeal
Solicitation # 2027-016
Solicitation 2027-016 is a request for sealed bids from the Salamanca City Central School District for the sanding and resealing of two gym floors located at 50 Iroquois Drive in Salamanca, New York. The scope of work includes the complete preparation of the High School Gym (75 by 95 feet) and the Auxiliary Gym and hallway (48 by 79 feet and 8 by 40 feet). Contractors must use 3M SPP pads at a rate of 250 square feet per side of pad, perform vacuuming and tacking, and apply one coat of Hillyard Trophy H2O water-based finish. A one-year warranty is required upon completion. All necessary products, equipment, and labor must be provided by the contractor, and prevailing wage rates from the NYS Bureau of Public Works Labor Department may apply. Bids must be submitted by 1:00 PM on November 13, 2026, either via the Beacon Bid portal or in a sealed envelope delivered to the district business office. Required submission documents include a bid form, vendor identification form, non-collusive bidding certification, indemnification agreement, Iran Divestments Act certificate, and proof of liability and worker's compensation insurance. The district will evaluate bidders based on their ability to perform the work, requiring those without current equipment or personnel to provide a detailed acquisition plan. Invoicing must be completed within 35 days of the purchase order date.
Salamanca City Central School District

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 238330
New
SLED
Transit Maintenance Facility Maintenance Floor Recoating
Solicitation # TRT-26-27-TMF42026
The City of Santa Clarita is soliciting bids for the Transit Maintenance Facility Maintenance Floor Recoating project (Bid #TRT-26-27-TMF42026) located at 28250 Constellation Road, Santa Clarita, California. The project involves the complete removal of approximately 12,000 square feet of existing floor coating down to the subsurface concrete, the application of a built-in moisture control system, and the installation of a new high-strength, high-traffic epoxy coating with non-slip grit. The new flooring must be impact-resistant and resistant to common automotive chemicals, including engine oil, diesel fuel, and gasoline. The engineer's estimate for this project is $237,171, and the contract will be awarded to the lowest responsible and responsive bidder based on the base bid. Bids are due by November 20, 2026, and must be submitted electronically via BidNet, with the exception of the original notarized Proposal Guarantee Bid Bond, which must be delivered as a hard copy to City Hall. Qualified bidders must hold C-15 and/or C-61/D-12 licenses and be registered to perform public work under Labor Code Section 1725.5. The project is subject to California Labor Code prevailing wage requirements and requires several certifications, including Buy America and Non-Collusion affidavits. Awardees must provide a Faithful Performance Bond and a Labor and Material Bond for 100 percent of the contract price, and the work is guaranteed against defective materials and workmanship for one year following written acceptance.
City of Santa Clarita

POSTED

about 13 hours ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
Ashe Nursery Floor Repair/Replacement
Solicitation # 12445127B0004
Solicitation 12445127B0004 is an Invitation For Bid issued by the Department of Agriculture for the repair and replacement of the floor framing system at the Ashe Nursery/Extractor office located in the DeSoto National Forest in Brooklyn, Mississippi. The project is necessitated by severe wood rot and microbial growth, with the current floor system identified as a safety hazard. The scope of work includes replacing 756 square feet of subfloor and 594 linear feet of floor joists using high traffic commercial tongue and groove planking, installing a crawlspace encapsulation system with a heavy duty vapor barrier and dehumidifier to maintain humidity below 60 percent, and performing a final deep clean of the office. This acquisition is a Total Small Business Set-Aside under NAICS code 238330, with an estimated value between 45,000 and 46,500 dollars. Award will be granted to the lowest responsive and responsible bidder who provides pricing for all required items. The contractor must begin work within 10 calendar days of the notice to proceed and complete all deliverables within 150 calendar days. The contract adheres to FAR Part 12 for commercial items and includes specific requirements for construction wage rates under the Davis-Bacon Act, as well as standard clauses for insurance, bonding, and the Buy American Act. Offers must be submitted via email to Cynthia Granderson, and prices must remain firm for 90 calendar days from the receipt date.
National Forests In Mississippi

POSTED

about 15 hours ago

DEADLINE

in 26 days
NAICS: 238330
New
Federal
Flooring Replacement Services CTXVA
Solicitation # 36C25727Q0066
Solicitation 36C25727Q0066 is a Firm-Fixed-Price contract issued by the Department of Veterans Affairs, Network Contracting Office 17, for flooring replacement services at the Central Texas Veterans Health Care System in Temple, Texas. The project requires a contractor to remove existing carpet, padding, and adhesives from selected rooms in Building 147 and install Government-approved Luxury Vinyl Tile (LVT), cove base, and transition strips. The scope includes all labor, materials, and equipment, as well as subfloor preparation and the removal of all debris. The work must be completed within 75 days after the award, with a focus on minimizing disruptions to patient care and chapel use. This opportunity is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Proposals are due by November 25, 2026, and will be evaluated based on technical approach, price, and past performance. Applicants must submit two separate PDF volumes, including a redacted technical version, to the designated email contact. The contractor is required to maintain specific insurance minimums, including 500,000 dollars per occurrence for general liability and 100,000 dollars for employer's liability. Final payment is triggered upon completion inspection and acceptance, with all invoicing processed electronically through the Tungsten Network.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 15 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The contract entails a comprehensive flooring replacement project at the Floyd Little Athletic Center, focusing on a large hallway, atrium/lobby, two vestibules, and four two-story stairways. The scope of work includes the removal of existing resilient flooring, repairs to the aluminum curtain wall sill plates in the vestibules, moisture mitigation for the slab-on-grade, and the installation of different flooring types: walk-off mats in vestibules, rubber flooring on the stairs, and patterned, multi-colored rubber flooring in the hallway and atrium/lobby areas. Issued by the Connecticut Engineering agency under solicitation number 2026-ITB-369, the project was posted on May 28, 2026, with a response deadline of June 24, 2026. The place of performance is within Connecticut, with the project managed by Melissa Kops, the Project Manager and Architect, and supported by Prajna Mishra, the Procurement Specialist. Interested parties can contact these individuals for further details or access the project via the provided procurement portal link.

General Info

Flooring replacement at Floyd Little Center: remove, repair, moisture mitigation, install rubber and mats.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

13

ARPA Contractor Agreement Template (City of New Haven)

PDF, High priority: read this first34 pages · contract-document
High

ARPA Contractor Agreement Template More Than $100,000 MPB 11-26-24 Update

PDF, High priority: read this first35 pages · contract-document
High

ARPA Subrecipient Subaward Agreement Template 11-26-24

PDF, High priority: read this first36 pages · contract-document
High

ARPA Subrecipient Subaward Agreement Template (City of New Haven)

PDF, High priority: read this first34 pages · contract-document
High

City of New Haven MBE Utilization Documentation - Sub-Contractor Listing

DOCX, High priority: read this first1 page · mbe-utilization-form
High

City of New Haven Notice of Intent to Award and Agreement

PDF, High priority: read this first10 pages · contract-document
High

FLACFloor Project Manual 260527

PDF, High priority: read this firstproject-manual
High

Floyd Little Athletic Center Flooring ITB 2026-369

PDF, High priority: read this firstitb
High

Floyd Little Athletic Center Flooring Replacement Wage Determination May 8, 2026

PDF, High priority: read this firstwage-determination
High

BOA Approved Budget Fines and Penalties Chart FY 2024-25

PDF, Low priority1 page · budget-fines-penalties-chart
Low

City of New Haven EEOC Fees Notification July 2024

PDF, Low priority2 pages · special-notice
Low

Floyd Athletic Center Moisture Probing Report S-1000

PDF, Low priorityreport
Low

FLACFloor_A1.1_260527.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Engineering
Contacts2 people available
OfficeNew Haven, CT, 06510, USA
Organization / AgencyConnecticut → Engineering
Office AddressNew Haven, CT, 06510, USA
Contacts
Melissa KopsProject Manager, Architect
Prajna MishraProcurement Specialist

Interested Companies (9)

AquafinElkton, MD
Continental FlooringScottsdale, AZ
Source ManagementHerndon, WA

See All 9 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project involves the flooring replacement for a large hallway and atrium/ lobby, two vestibules, and four two-story stairways. Remove existing resilient flooring. Repair aluminum curtain wall sill plate in vestibules. Perform moisture mitigation on slab-on-grade. Install walk off mat in vestibules, rubber flooring in stairs and rubber flooring with a pattern in multiple colors in the hallway and atrium/ lobby.

More opportunities from Connecticut → Engineering

Same awarding agency

NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals for on-call structural engineering services to support the review, analysis, inspection, and design of municipal infrastructure on an as-needed basis. The scope of work includes preparing structural calculations for traffic control signals and light-pole loading, designing foundations and retaining walls, and performing inspections of mast arms and span poles. All work must be supervised by a Professional Engineer licensed in the State of Connecticut. The contract is expected to begin in November 2026 and run through December 31, 2027, with options for three additional one-year extensions. Annual price adjustments will be based on the U.S. Bureau of Labor Statistics Consumer Price Index. Proposals are due by November 5, 2026, and will be evaluated using a points-based system focusing on demonstrated experience (30%), hourly pricing (30%), the quality and thoroughness of the proposal (20%), and the qualifications of key personnel (20%). The Town reserves the right to shortlist firms for interviews and negotiate final terms. Required submission documents include a current IRS Form W-9, FEIN/EIN, SAM number, and a Living Wage Certification. Under the Manchester Living Wage Ordinance, covered employers with contracts valued at $25,000 or more per fiscal year must pay eligible employees either $18.25 per hour with health benefits or $26.70 per hour without. Additionally, contractors must maintain insurance from an A.M. Best rated A-/VIII company, naming the Town as an additional insured.
Engineering Services

POSTED

about 10 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238210
SLED
TRAFFIC SIGNAL MAINTENANCE
Solicitation # 26/27-13
The Town of Manchester, Connecticut, is seeking an on-call contractor for a two-year agreement, anticipated to begin December 1, 2026, to install, repair, maintain, and troubleshoot traffic control signals and related infrastructure. The scope of work includes the maintenance of rectangular rapid flashing beacons, intersection control beacons, emergency vehicle pre-emption equipment, battery backup systems, and V2X connected infrastructure. Services are divided into emergency requests, requiring 24/7 availability to address immediate safety issues and weather damage, and non-emergency requests for preventative maintenance and equipment upgrades performed during business hours. The contract may be extended for up to three additional one-year periods by mutual consent. Contractors must adhere to strict regulatory and labor standards, including Connecticut State and federal prevailing wage laws, the Manchester Living Wage Ordinance, and DBE participation requirements for federally funded projects. Bidders are evaluated on their financial responsibility, past performance on municipal projects, and possession of necessary equipment and facilities. The agreement requires a 5% bid bond and 100% performance and payment bonds. Payment is issued within 30 working days of an approved application, subject to a 5% retainage held for one year following completion. All work must comply with ITE and IMSA standards, and replacement components, such as push buttons, must be ADA compatible.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

13 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS