Flume Replacement Pipeline; D-2400
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Vista Irrigation District
NAICS
N/A
Place of Performance
Projcet Spans from City of Escondido to City of Vista., CASet-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Vista Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Vista Irrigation District
Office AddressN/A
Contacts
Full Description
Show more
The Flume has exceeded its usable service life and serves as the Vista Irrigation Districts only means of receiving local and imported water treated at the EVWTP. It also serves as the primary water supply for the District during planned 10-day shutdowns along the San Diego County Water Authoritys second aqueduct. To ensure system reliability and maintain existing service levels, the project proposes to replace the aging Flume structure with an approximately 12-mile long, 36-inch diameter pipeline. The immediate phase of work is limited to information collection and preliminary design activities necessary to inform the pipeline's exact alignment and engineering parameters within or adjacent to the existing facility right-of-way. These activities include environmental resource mapping, utility potholing, topographic surveys, and geotechnical borings and assessments. All data collection efforts are strictly for information-gathering, modeling, and design purposes that are intended to inform further agency decision-making and will not result in a serious or major disturbance to any environmental resources.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS