This Solicitation opportunity from Texas was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FM 1626 Transmission Main Pipeline REBID

Closed
RFP-2026-063REBIDState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Hickory Street 24-Inch Water Transmission Main Replacement ProjectThe East Larimer County Water District is seeking qualified contractors to rehabilitate or replace approximately 2,500 linear feet of a 24-inch ductile iron water transmission main located west of College Avenue along Hickory Street in Fort Collins, Colorado. Constructed in 1978, the pipeline has suffered multiple breaks over the past five years due to external corrosion, prompting the need for a durable solution that meets current American Water Works Association standards and ensures reliable service for the district’s 25,000 customers. The project requires the complete removal and replacement or rehabilitation of the pipeline segment, including installation of a new blowoff valve and air release valve, hydrostatic testing, disinfection, tie-ins, traffic management, and full surface restoration in compliance with ELCO and AWWA specifications. Contractors must propose solutions capable of providing at least an additional century of service life using materials and technologies that satisfy the RFP’s minimum requirements. The solicitation, titled Hickory Street 24-Inch Water Transmission Main Replacement Project and numbered 2026-1A, was posted on June 26, 2026, with proposals due by August 7, 2026. ELCO, established in 1962 to serve rural areas north and east of Fort Collins, operates over 275 miles of water infrastructure and is now focused on upgrading aging components to maintain system integrity. The selected contractor will be responsible for both design support and full construction execution, with all work to be performed at the specified location in Colorado. Interested parties must submit proposals through the official portal and direct inquiries to Dave K. Myer, the designated point of contact, via email or phone. The district is seeking technically sound, cost-effective, and long-term solutions to prevent future failures and ensure uninterrupted water delivery to its service area.
East Larimer County Water District

POSTED

2 days ago

DEADLINE

in about 1 month
NAICS: 237110
New
SLED
Chapel Road Water Main ReplacementThe Chapel Road Water Main Replacement project involves the installation of new ductile iron water mains to replace outdated cast iron infrastructure, spanning from the intersection of Chapel Road and SR 125 to approximately 1,475 feet northeast of Amelia Park Drive. The scope includes approximately 59 linear feet of 6-inch diameter pipe, 128 linear feet of 8-inch diameter pipe, and 4,917 linear feet of 12-inch diameter water main, along with associated services and connections to ensure full water distribution coverage. Nine new fire hydrants will be installed along the alignment to enhance public safety and fire protection capabilities within the area. The work necessitates careful coordination with existing utilities and infrastructure, with all materials and installation methods complying with current engineering standards for durability and operational reliability. The project is solicited under RFB-6401-60234-0-2026/MS by the Clermont County Board of Commissioners in Ohio, with bids due by August 6, 2026. The solicitation is open to eligible contractors under a state and local government procurement process, though no specific set-aside provisions are indicated. Performance is expected to occur entirely within Clermont County, Ohio, and no point of contact information is provided in the solicitation details. Interested parties must review the full solicitation on the DemandStar portal to understand all technical specifications, compliance requirements, and submission guidelines before the deadline.
Clermont County - Board of Commissioners

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the installation of approximately 1.2 miles of PVC piping, consisting of 30-inch and 24-inch diameters, running from the FM1626 Pump Station to the Well 4 Site within the City’s right-of-way along TXDOT and City property. Additionally, the scope includes installing 16-inch and 12-inch PVC pipes across Benner Road to link the Well 4 Site to the City’s existing water distribution system. The work also requires the integration of all necessary valves along the transmission line as well as executing several trenchless crossings to navigate under roadways, minimizing surface disruption. This solicitation, labeled FM 1626 Transmission Main Pipeline REBID, was posted by the Texas Water Utilities agency with a response deadline set for mid-May 2026. The project will be performed within the state of Texas, with the primary contact being a Senior Budget Analyst based in Kyle, Texas. The contract does not specify any set-asides or NAICS codes and is intended for state, local, and education (SLED) organizations. Key project management, communication, and procurement details are accessible through the City of Kyle’s open government procurement portal.

General Info

Install 1.2 miles of PVC piping, valves, and trenchless crossings in Kyle, Texas by May 2026.

Agency

Texas → Water UtilitiesView Agency

NAICS

237110 - Water and Sewer Line and Related Structures Construction View NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(12)

TxDot_permit_1_temp_const_entrance.pdf

PDF

AD-02_Drawings_.pdf

PDF

TxDot_Permit_5_utility_installation.pdf

PDF

AD-02_Specifications.pdf

PDF

FM_1626_Transmission_Main_Pipeline_Project_Manual-IFB-01302026.pdf

PDF

FM1626_Transmission_Line_Bid_Form_.xlsx

XLSX

Drawings.pdf

PDF

Project_Manual.pdf

PDF

TxDot_permit_3_temp_const_entrance.pdf

PDF

TxDot_permit_2_temp_const_entrance.pdf

PDF

TxDot_permit_4_temp_const_entrance.pdf

PDF

2026-01-30_-_FM_1626_Transmission_Line_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Water Utilities
Contacts1 person available
OfficeKyle, TX, 78640, US
Organization / Agency
Texas → Water Utilities
View Agency Profile
Office AddressKyle, TX, 78640, US
Contacts
Kelsey SteeleSenior Budget Analyst

Interested Companies (36)

Show more
BlackRock Construction
Westmont, Illinois
Garney Companies
Alpharetta, Georgia

See All 36 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Work consists of the installation of approximately 1.2 miles (6,300 LF) of 30-inch and 24-inch PVC pipe extending between the City's FM1626 Pump Station site to the Well 4 Site along TXDOT and City right-of-way. Additionally, the Work includes a 16-inch and 12-inch PVC pipe across Benner Rd. to connect the Well 4 Site to the City's water distribution system. Work will also include the installation of all necessary valving along the transmission line and several trenchless crossings under roadways.