Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fogging Misting Fans

Closed
FA930225Q0069Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
BLOWER UNIT, AIR FILTER
Solicitation # SPE8E5-27-Q-0031
Solicitation SPE8E5-27-Q-0031 is a firm fixed price contract issued by the DLA Troop Support Construction and Equipment office for the procurement of 53,000 blower units for air filtering respirators, identified by NSN 4240-01-655-6330. The award will be based on the best value offer determined by the total award price, including both production and First Article Test (FAT) costs. Delivery is scheduled for 240 days after award for the primary units, with a separate 100-day delivery window for specific line items. Inspection and acceptance are conducted at the origin, with the final delivery destination being the DLA Distribution facility in New Cumberland, Pennsylvania. This procurement is designated as Chemical Biological Defense Equipment and carries stringent quality and security requirements. Contractors must adhere to CMMC Level 2 certification and safeguard covered defense information. Technical compliance is governed by specific reference drawings and Quality Assurance Provisions, with a strict prohibition on the use of class I ozone depleting chemicals. The contract requires rigorous testing, including First Article Testing and Production Lot Testing, and mandates military packaging and marking in accordance with MIL-STD-2073-1 and MIL-STD-129. Additionally, the contract incorporates Buy American and Balance of Payments Program regulations and requires the use of the Wide Area WorkFlow system for all electronic invoicing and payment requests.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 19 hours ago

DEADLINE

in 6 days
NAICS: 333413
New
DIBBS
FAN, TUBEAXIAL
Solicitation # SPE8E7-27-T-0122
Solicitation SPE8E7-27-T-0122 is a fixed-price contract issued by DLA Troop Support, Construction and Equipment for the procurement of seven tubeaxial fans, NSN 4140-00-289-8826. These critical application items must operate at 115 volts AC, 60 Hz, single phase, and comply with MIL-PRF-18953. A Qualified Products List applies, requiring the manufacturer to be QPL approved at the time of contract award. Technical requirements are further governed by TDP Rev A Gen 1 and reference drawing 75477 FF16085 Revision E. The contract specifies a delivery timeframe of 195 days, with a need ship date of May 3, 2027, and a required delivery date of August 27, 2027. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, DLA Distribution San Joaquin in Tracy, California. Packaging must adhere to MIL-F-18953 and MIL-STD-2073-1E, with marking per MIL-STD-129 and palletization per RP001, while avoiding plastics for wrapping or cushioning where possible. Administrative requirements include the use of Wide Area WorkFlow for invoicing and receiving reports. Offerors must be registered in the System for Award Management and comply with NAICS code 333413. The contract incorporates several federal regulations, including FAR 52.246-1 for destination inspection, DFARS 252.204-7012 for safeguarding covered defense information, and various domestic material restrictions such as the Buy American Act and the Berry Amendment. Additionally, the use of additive manufacturing for these parts is prohibited unless specifically authorized.
DLA DIST SAN JOAQUIN

POSTED

about 19 hours ago

DEADLINE

in 2 days
NAICS: 333413
New
International
GE BOOTH WATER RESOURCE RECOVERY FACILITY (WRRF) THERMAL OXIDIZATION UNIT 2 (TOX2) AIR POLLUTION CONTROL DEVICE (APCD) PREPURCHASE, PROJECT 42-0613
Solicitation # 2026-468P
The Region of Peel is seeking a qualified vendor for the prepurchase of Air Pollution Control Device (APCD) equipment for the GE Booth Water Resource Recovery Facility Thermal Oxidization Unit 2, identified as Project 42-0613. This procurement, solicitation number 2026-468P, is conducted in accordance with CETA, CFTA, and other applicable trade agreements. The scope of work encompasses the supply, delivery, and commissioning of the equipment, including performance testing and the provision of comprehensive operations and maintenance data. Equipment must be ready for delivery by Q4 2027 on an FOB Destination basis to either the facility or a designated warehouse in the Greater Toronto Area. The selection process follows a staged evaluation totaling 100 points, consisting of a pass/fail compliance review, a technical proposal weighted at 70 points with a minimum threshold of 42, a financial proposal at 20 points, and a Domestic Supply Chain Plan at 10 points. Bidders must submit electronic proposals in PDF format by November 11, 2026, including mandatory uploads such as technical attributes, installation lists, resumes for project managers and technicians, and a detailed work plan. Acceptance of the equipment is contingent upon successful delivery, installation, and the completion of a 14-day continuous operating period. Vendors are also required to adhere to strict packaging and marking standards and comply with Ontario and Canadian privacy legislation.
Region of Peel

POSTED

4 days ago

DEADLINE

in 22 days

General Info

NAICS

333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing

Place of Performance

Edwards, CA, 93524, USA

Set-Aside

SBA

Documents

3

Solicitation FA930225Q0069 - Fogging Misting Fan

PDF, High priority: read this firstrfq
High

Statement of Requirements - Fogging/Misting Fan

PDF, High priority: read this firstsow
High

QA_Fogging+Misting+Fans.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9302 Aftc Pzz
Contacts2 people available
OfficeEDWARDS AFB, CA, 93524-1185, USA
Office AddressEDWARDS AFB, CA, 93524-1185, USA

Full Description

Show more
Amendment 1: The purpose of this amendement is to add a Q&A section as an attachment. This is a Combined Synopsis/Solicitation for the acquisition of Fogging Misting Fans. Please see attached Statement of Requirements for further details. (i) This is a combined synopsis/solicitation for commercial products prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. Simplified Acquisition Procedures (FAR Part 13) will be used for requirement. (ii) Solicitation Number: FA9302-25-Q-0069 **Please provide the full solicitation number on all packages** Interested parties who believe they can meet all the requirements for the products described in this combined synopsis/solicitation are invited to submit, in writing, a complete quote. Offerors are required to submit with their quote enough information for the Government to evaluate the requirements detailed in this combined synopsis/solicitation. Offerors shall submit quotes via email, please note the maximum file size is 10MB. Emails over this file size will not be received. Submit only written offers; oral offers will not be accepted. This solicitation is issued as a Request for Quote (RFQ). (iii) The solicitation document attached and incorporated provisions and clauses are in effect through Federal Acquisition Circular 2025-04, DFARS Change 01/17/2025 and DAFFARS Change 10/16/2024. (iv) THIS REQUIREMENT WILL BE FOR: QTY 8 each, Fogging Misting Fans. The North American Industry Classification System (NAICS) number for this acquisition is 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing6 with a size standard of 500 employees. (v) Delivery: Period of Performance will be 120 Days ARO or as soon as possible. (vi) The provision at FAR 52.212-1, Instructions to Offerors'Commercial Products and Commercial Services (Sep 2023), applies to this acquisition. Provisions and clauses can be viewed via internet at Acquisition.gov, https://www.acquisition.gov/. Offerors shall prepare their quotations in accordance with FAR 52.212-1. In addition, the following information shall be included: PROVIDE THE FOLLOWING CONTRACTOR INFORMATION WITHIN YOUR QUOTE: 1. SAM UEI: 2. TIN Number: 3. CAGE Code: 4. Contractor Name: 5. Payment Terms (NET 30) or Discount: 6. Point of Contact Name and Phone Number: 7. Email address: 8. Warranty: 9. Date Offer Expires: 10. FOB Destination: 11. Estimated Delivery Lead Time: 12. Completed copy of FAR 52.212-3, Alt I, Offeror Representations and Certifications'Commercial Products and Commercial Services (Feb 2024) - or - notification that FAR 52.212-3 representations and certifications are available on SAM.gov (vii) The provision at FAR 52.212-2, Evaluation'Commercial Products and Commercial Services (Nov 2021) applies to this acquisition. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: ***Please read the evaluation criteria closely. If vendor does not provide a full response, it will be found unresponsive*** The solicitation provides that quotations will be evaluated using Lowest Price Technically Acceptable (LTPA). The award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The technical acceptability factor contains one non-cost subfactor: (1) Ability to provide QTY 8 each, Fogging Misting Fans as stated on the Statement of Requirements. The agency will first rank quotations according to price, from lowest to highest, and will evaluate the lowest-priced quotation as either technically acceptable or unacceptable, reserving the right to evaluate additional quotations for technical acceptability if deemed to be in the best interest of the government. Evaluation Factors: 1. Price 2. Technically Acceptability Technically Acceptable Subfactors: 1. Ability to provide the Fogging Misting Fans. The ability to provide the Fogging Misting Fans as stated on the Statement of Requirements will be assigned ratings of satisfactory or unsatisfactory. The Government will award a purchase order resulting from the RFQ to the responsible offeror whose quote is responsive to the RFQ and considered to be the Best Value based on LTPA. (viii) Offerors must have completed copies of applicable provisions in sam.gov. Offers will be considered incomplete if not completed. (iv) The clause at FAR 52.212-4, Contract Terms and Conditions'Commercial Products and Commercial Services (Nov 2023), applies to this acquisition. (x) The clause at FAR 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders'Commercial Products and Commercial Services (May 2024), applies to this acquisition. (xi) Defense Priorities and Allocation System (DPAS): N/A (xii) Quote Submission Information: It is the government's intent to award without discussions. Therefore, each initial quote should contain the offeror's best terms from a price and technical standpoint. However, the government reserves the right to conduct discussions if the Contracting Officer (CO) determines that discussions are necessary. Offers are due by 1 August 2025 at 12:00 PM, Pacific Standard Time (PST). Offers must be sent via email to both Jenna Jacobson (jenna.jacobson@us.af.mil) AND Denina Hudson (denina.hudson@us.af.mil). No late submissions will be accepted. (xiv) For additional information regarding this solicitation contact: Primary Point of Contact: Denina Hudson 661-277-9659 Contract Specialist Secondary Point of Contact: Jenna Jacobson Jenna.jacobson@us.af.mil Contracting Officer QUESTION PERIOD: The period for questions regarding this RFQ will end at 12:00 PM PDT on 29 July 2025. Please send all questions to the CO via email at jenna.jacobson@us.af.mil. Phone inquiries are not available currently. All questions and answers will be posted to this RFQ. Attachments: Solicitation FA9302-25-Q-0069 Statement of Requirements

More opportunities from Department Of Defense → FA9302 Aftc Pzz

Same awarding agency

NAICS: 334220
Federal
URC-300 VHF/UHF Transceiver Assembly and Remote Control Unit (RCU)
Solicitation # ACQ-26-H096
The Department of the Air Force, through the Air Force Test Center (AFTC/PZZF) at Edwards AFB, intends to award a sole-source, Firm-Fixed-Price purchase order to ACG Systems, Inc. under solicitation ACQ-26-H096. This procurement is for one URC-300 VHF/UHF Transceiver Assembly and ten associated auxiliary components, including a Remote Control Unit (RCU), mounting brackets, antennas, and cabling. The equipment is required to expand the capabilities of the Mobile Telemetry Van supporting the B-52 Commercial Engine Replacement Program (CERP) and must integrate with the proprietary CM-350 V2 control protocols. The government has determined that ACG Systems, Inc. is the only responsible source capable of satisfying the requirement because they are the original equipment manufacturer and the hardware must meet mandatory military TEMPEST and EMI shielding standards for classified and unclassified operations. Utilizing non-ACG hardware would result in significant duplication of costs and cause a critical six-to-nine-month delay due to mandatory recertification, which would threaten B-52 engine replacement timelines and operational readiness targets. The award is based on the vendor's unique technical compatibility and the determination that the pricing is fair and reasonable based on historical data from previous contract FA9302-22-F-G596.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in almost 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS