Description Title of the assignment Capacity Development Programme for KCC and KWASA Officials on Urban Sanitation Regulation, Fecal Sludge Management, Wastewater Treatment, and Decentralized Wastewater Treatment (DWT) Technologies Purpose To strengthen the institutional, technical, regulatory and operational capacities of KCC and KWASA officials to plan, regulate, implement, operate and monitor fecal sludge and wastewater management systems, including decentralized wastewater treatment technologies. Location Khulna, Bangladesh, with selected online sessions and technical exposure visits subject to availability. Estimated Duration Six months, January 2027 to June 2027. Reporting to Technical Supervisor of this assignment WASH Specialist, UNICEF Bangladesh, with KCC and KWASA designated counterparts. 1.Background Khulna is transitioning toward an integrated urban sanitation service model that combines sewerage infrastructure, fecal sludge management services and decentralized wastewater treatment solutions. Responsibilities are shared principally between Khulna City Corporation (KCC) and Khulna Water Supply and Sewerage Authority (KWASA), with important regulatory and technical interfaces involving the Local Government Division, Department of Public Health Engineering (DPHE), Department of Environment (DoE) and other stakeholders of sectors. Effective regulation, operation and sustainability of these systems require strengthened technical, operational, regulatory, financial and institutional capacities. Attention is needed for an uptake in desludging demand and effective operations of the existing fecal sludge treatment plant currently operated by KCC as well as support KWASA in taking on the challenge of sewerage operations for the first time. The ADB-funded Khulna Sewerage System Development Project aims to establish a sustainable and inclusive sewerage system in Khulna through the development of new sewer networks, sewage and fecal sludge treatment facilities, property-level sewer connections, capacity development for KWASA, and sanitation and hygiene awareness-raising. The proposed programme will provide structured learning, practical exercises, peer exchange and action planning to strengthen KCC and KWASA capacities for safe and inclusive sanitation management in Khulna. 2.Objectives, Purpose and Expected Results Purpose To strengthen the technical, regulatory, managerial and operational capacities of KCC and KWASA officials for planning, regulating, implementing, operating and monitoring fecal sludge and wastewater management systems, including decentralized wastewater treatment technologies. Specific Objectives Enhance understanding of national and relevant international sanitation regulatory frameworks and environmental compliance requirements. Strengthen knowledge of Citywide Inclusive Sanitation (CWIS) and integrated planning for sewered and non-sewered sanitation. Develop practical knowledge for operation, maintenance, occupational safety, process control and performance monitoring of treatment facilities. Strengthen coordination among KCC, KWASA, DPHE, DoE, LGD and other relevant stakeholders. Support preparation of a joint institutional action plan and capacity development roadmap for sustainable sanitation management in Khulna. Expected Results KCC and KWASA officials demonstrate improved knowledge of sanitation regulation, FSM and wastewater treatment systems. Participants are better equipped to regulate, monitor and oversee centralized and decentralized sanitation services and facilities. Institutional readiness is improved for operation and management of sewerage, fecal sludge and other treatment infrastructure. A joint KCC-KWASA institutional action plan and capacity development roadmap is prepared. Coordination among key sanitation sector institutions is strengthened. 3.Target Participants: Institution Indicative participants Indicative role in programme KCC Engineers, conservancy officers, urban planners, environmental officers and FSM personnel Urban sanitation regulation, FSM service oversight, environmental health and city planning Institution Indicative participants Indicative role in programme KWASA Sewerage engineers, O&M staff, planning and technical officers Sewerage and wastewater infrastructure planning, operation and performance management Selected stakeholders Representatives of DPHE, DoE and LGD, where relevant Technical, regulatory and institutional coordination The programme is expected to engage approximately 25-30 officials. The final participant list and institutional representation will be agreed during inception and the training needs assessment. 4.Major Activities and Programme Modules Module Core content 1. Urban sanitation governance and regulation National sanitation policies and regulations; institutional mandates; CWIS; environmental compliance and permitting; public health considerations. 2. Fecal sludge management Sanitation service chain; scheduled desludging; septic tank standards; collection, transport, treatment and safe disposal; enforcement mechanisms. 3. Scheduled desludging Introduction to scheduled desludging; development of survey form to understand compliance of septic tanks to existing regulations and feasibility of scheduled desludging; conduct of survey in a pilot area 4. Treatment facilities FSTPs, co-treatment and STPs; treatment process selection; sludge management; resource recovery; effluent quality monitoring. Note: A review of current practices of KCC in the operations of its FSTP will be made during one of the face-to-face training sessions. A training module of FSTP operations will be made onsite. 5. Monitoring, compliance and performance Key performance indicators; environmental monitoring; occupational health and safety standards and protocols; data systems and regulatory reporting. 6. Institutional action planning Institutional gap assessment; KCC-KWASA action plans; pilot opportunities; investment and capacity strengthening roadmap. Note: For KWASA, support will include a review of its current organizational structure and provide recommendations on a basic staff complement needed to take on sewerage operations. Training Modality Two online learning sessions and webinars. One face-to-face workshops and technical training (UNICEF will pay/arrange with Govt.). One exposure visits (in country) to operational sanitation and wastewater facilities including face-to-face workshops, subject to availability and approval. Peer-to-peer learning and experience-sharing sessions. Case study reviews, group exercises and practical assignments. Pre- and post-training assessments and participant feedback. 5.Description of Assignment Task Scope Deliverable Timing Inception and training needs assessment Review available programme documents; consult UNICEF, KCC, KWASA and relevant institutions; assess capacity gaps; propose participant profile, methodology, workplan and quality assurance approach. Inception report and approved detailed workplan; training needs assessment report. January 2027 Curriculum and material development Develop a structured curriculum covering the six modules; prepare facilitator guides, presentations, case studies, exercises, assessment tools and participant materials; adapt content to the Bangladesh and Khulna context. Final curriculum and complete training package; online learning resources. January-February 2027 Delivery of learning programme Deliver at least two online learning sessions, one face-to-face technical workshops and action-planning workshop using participatory adult-learning methods. Note: The action-planning workshop will be conducted dur Session records, attendance, materials, assessment results and workshop documentation. February-June 2027 Technical exposure and peer learning Plan and facilitate appropriate technical or exposure visits, subject to availability, approvals and logistics; document key learning and implications for Khulna. The visit will include a training workshops. Note: If the exposure visit is not approved, a face-to-face action planning workshop will be conducted in its stead. Exposure/peer-learning brief with lessons and follow-up actions. April-May 2027 Revised FSTP standard operating procedures (SOP) Review current operational practices in the FSTP and prepare a practical SOP for the operations of the KCC FSTP. Training of KCC personnel on proper operations of the FSTP Revised SOP and manual that will easily be understood by operators of the FSTP. April-May 2027 Institutional action planning Facilitate institutional gap assessment and joint action planning with KCC and KWASA; identify priority actions, responsibilities, indicative timelines and capacity support needs. Note: We need to take into consideration the activites under the ADB project as this includes institutional strengthening. Joint KCC-KWASA institutional action plan and capacity development roadmap. June 2027 Completion and knowledge products Compile results, participant feedback, learning assessment, recommendations and all final materials in editable and PDF formats. Capacity development completion report and consolidated knowledge package. June 2027 Reporting Requirements The contracted institution will report to the WASH Specialist, UNICEF Bangladesh. Designated KCC and KWASA counterparts will provide technical coordination, facilitate participation and review outputs as appropriate. All deliverables will be submitted electronically in English, in editable source format and PDF. Training materials should be designed for practical reuse by KCC and KWASA. UNICEF may request reasonable revisions to ensure technical quality, contextual relevance and compliance with the agreed ToR. Major Reports and Deliverables No. Deliverable Indicative submission 1 Inception report and detailed workplan, including methodology, consultation plan, delivery schedule and quality assurance approach. Within 15 calendar days of contract commencement 2 Training needs assessment report and final participant/capacity profile. By end of January 2027 3 Final curriculum, learning materials, presentations, exercises and assessment tools. Before commencement of the corresponding modules 4 Documentation of at least two online sessions, two face-to-face workshops and action-planning workshop. Progressively, February-June 2027 5 Revised SOP on FSTP operations for KCC and report on septic tank pilot survey. By end of May 2027 6 Joint KCC-KWASA institutional action plan and capacity development roadmap. By end of June 2027 7 Final completion report, including assessment results, participant feedback, lessons, recommendations and complete knowledge package. By end of June 2027 7.Payment Schedule Payments will be linked to UNICEF acceptance of deliverables. The bidder may propose refinements to the sequencing, while maintaining the deliverable-based approach and the total contract value. Payment Milestone Share 1 Approved inception report, detailed workplan and training needs assessment report 20% 2 UNICEF-approved curriculum and complete training/learning package 20% 3 Completion and documentation of online sessions and face-to-face technical workshops 30% 4 Approved revised SOP for FSTP operations and joint institutional action plan 15% 5 Approved final completion report and consolidated final knowledge package 15% 8.Qualification Requirements of the Company/Institution/Organization Institutional Qualifications Legally registered institution, consulting firm, academic institution or specialist organization eligible to contract and operate in Bangladesh. Minimum 5 years of demonstrated experience in urban sanitation, fecal sludge management, wastewater management or closely related fields. Demonstrated experience in institutional capacity development for utilities, local governments or public-sector agencies. Proven technical expertise in FSM, wastewater treatment, decentralized treatment technologies and environmental compliance. Demonstrated experience with Johkasou, DEWATS or equivalent decentralized systems. Relevant experience in South Asia and ASEAN; experience in Bangladesh is strongly preferred. Ability to mobilize a multidisciplinary National and International team covering engineering, regulation, O&M, institutional development, finance, environmental management and adult learning. Demonstrated systems for quality assurance, safeguarding, occupational safety and timely delivery of high-quality knowledge products. Team Composition (Indicative) Position Minimum indicative profile Team Leader / Urban Sanitation Specialist Postgraduate degree in law, civil, environmental or sanitary engineering, urban sanitation or related field; at least 12 years of relevant experience; demonstrated team leadership and capacity development experience. Wastewater and FSM Technical Specialists Postgraduate degree in relevant engineering or environmental field; at least 10 years of experience in wastewater/FSM treatment, process selection, O&M and performance monitoring. Sanitation Governance and Regulatory Specialist Advanced degree in public policy, environmental management, law, governance or related field; at least 8 years of relevant policy, regulatory or institutional experience. Training and Knowledge Management Specialist Advanced degree in education, organizational development, communications or related field; at least 7 years of experience designing and facilitating adult-learning and capacity development programmes. 9.Evaluation Process and Method Proposals will be evaluated using a quality-and-cost-based approach. The Technical Proposal carries 70 points, and the Financial Proposal carries 30 points. Bidders must obtain at least 49 out of 70 technical points to be considered technically compliant and to proceed with financial evaluation. Evaluation Criteria for Technical Proposal Criterion Assessment basis Points 1. Overall response and understanding of the ToR Understanding of the assignment, context, objectives, risks and expected results. 10 2. Institutional experience and past performance (International and National) Relevant experience in sanitation, wastewater/FSM, capacity development, local government or utility support, including comparable assignments. 15 3. Technical approach and methodology Soundness, feasibility and contextual relevance of methodology, learning approach, sequencing, stakeholder engagement and quality assurance. 20 4. Workplan and deliverable management Realistic schedule, allocation of effort, risk management and arrangements for timely production and review of deliverables. 10 5. Proposed team composition and qualifications Relevance and adequacy of proposed experts, qualifications, experience, roles and availability. 15 Total Technical Score 70 The Financial Proposal will be scored out of 30 points in accordance with the RFP. The final selection will be based on the combined technical and financial score, subject to UNICEF procurement rules and the requirements stated in the solicitation documents. 10.Management, Coordination and Quality Assurance The contracted institution will nominate a Team Leader as the primary focal point for contract management and technical coordination. An inception meeting will confirm the workplan, participant profile, review process, communication protocol and detailed schedule. KCC and KWASA will nominate focal persons to support participant coordination, access to relevant information and institutional review. All learning products will undergo internal technical and editorial quality assurance before submission to UNICEF. Activities involving field or facility visits will be subject to prior approval, availability, safety requirements and coordination with the facility owner/operator. The contracted institution will maintain attendance, assessment, feedback and activity records and submit them with relevant deliverables.