Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Forestry and Parks - Request for Quotes - Rocky Mountain House District (RMHD) - Beaver Pond Leveler Installation

Active
AB-2026-05488International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract issued by Forestry and Parks under solicitation number AB-2026-05488 seeks to address rising flood damage on walking trails in the Rocky Mountain House District caused by beaver damming activities. The solution involves installing Flexible Beaver Pond Levelers to regulate water levels and prevent overland flooding, thereby preserving public access to trails within park boundaries. The contractor is responsible for all aspects of the project including mobilization and demobilization of equipment, supplying and hauling materials to the site, erecting public construction signage, and strictly following the installation methods outlined in designated video resources from the Miistakis Institute. All work must be executed in compliance with the specified technical guidelines to ensure effectiveness and environmental responsibility. The contractor must also perform a thorough cleanup of each worksite, removing all debris and disposing of it offsite, explicitly prohibited from using Parks refuse containers. The project falls under the agency’s broader effort to balance wildlife conservation with public safety and recreational use, and all activities are to be coordinated within the legal and operational parameters of Alberta’s public lands. Proposals are due by August 26, 2026, with Kevin Wenzel listed as the Project Manager for inquiries and coordination. The scope emphasizes precision, environmental stewardship, and adherence to documented best practices for non-lethal beaver management.

General Info

Install flexible beaver pond levelers to control flooding, preserve trails, and ensure environmental compliance in Rocky Mountain House District.

Agency

Forestry and ParksView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A
Organization / Agency
Forestry and Parks
View Agency Profile
Office AddressN/A
Contacts
Kevin WenzelProject Manager

Full Description

Show more
The beaver population in Public Recreational Areas has become established and the damming of waterbodies has presented a problem with overland flooding on established walking trails. The intent is to mitigate this problem by installing Flexible Beaver Pond Levelers to mitigate the flood damage to trails and allow visitor usage of trails within the park boundaries. SCOPE OF WORK: • Mobilization and Demobilization of all equipment. • Supply all materials, haul onto site to create pond levelers. • Erect construction signage for notification to the public of work in progress. • Follow the list of materials and the method for installation for pond levelers that are within the following video links created by the Miistakis Institute: https://www.workingwithbeavers.ca/resources_videos.php • Clean up of the sites and remove all debris created during the project. Clean up of work site is required and debris is to be disposed of offsite, and not in Parks refuse containers. Refer to the RFQ document for additional information.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is soliciting bids for the replacement of a culvert along 45th Avenue SW and associated habitat restoration work in King County, Washington. The project, identified by bid/contract number 2025-017, involves the removal and installation of a new culvert structure to improve drainage and infrastructure resilience, coupled with ecological restoration efforts to enhance native habitat conditions in the surrounding area. Work is expected to align with environmental standards and community priorities for sustainable urban development. The solicitation emphasizes participation from minority-owned and women-owned businesses, with set-asides requiring certification through NMSDC and WBENC respectively, to promote equitable contracting opportunities. The deadline for proposals is August 12, 2026, and all submissions must comply with the specified requirements outlined in the solicitation. Shimmick Construction Company, Inc. is listed as the contracting organization and point of contact for the project, with Jamie Miranda serving as the primary liaison for inquiries. The project falls under NAICS code 237990, categorizing it as other heavy and civil engineering construction. Performance of the work will occur in Seattle, Washington, and interested parties are directed to the provided online portal for additional information and to access solicitation documents. Proposals must be submitted prior to the stated deadline, and all bidders are expected to demonstrate experience in civil infrastructure and environmental restoration projects, with particular attention to local regulatory compliance and community impact mitigation.
Shimmick Construction Company, Inc

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Forestry and Parks

Same awarding agency

NAICS: 541620
New
International
Forestry and Parks - Request for Proposal - Water & Wastewater Systems Professional Consulting Services - Provincial Water and Wastewater Regulatory Requirements Throughout the Province
Solicitation # AB-2026-05394
Alberta Parks is seeking qualified consultants to conduct a comprehensive province-wide assessment of its potable water and wastewater systems to ensure full compliance with provincial regulatory requirements under the Environmental Protection and Enhancement Act, the Water Act, Public Health Act drinking-water standards, and other directives from Alberta Environment and Protected Areas. These systems, used across seasonal and year-round recreational facilities, vary widely in size, configuration, and operational cycles, leading to inconsistent monitoring, reporting, and compliance tracking due to differing regional practices and high seasonal staff turnover. The absence of standardized processes has hindered Alberta Parks’ ability to reliably verify compliance, detect gaps, and implement consistent improvements across regions. To resolve this, the project will identify all regulatory obligations for each facility, evaluate current adherence, and provide actionable recommendations to close compliance gaps. The outcome will include a standardized Regulatory Compliance Key Performance Indicator Matrix and a centralized annual dashboard to visually display regional performance, enabling assured, annual confirmation that all water and wastewater compliance obligations are consistently met across the province. The solicitation, AB-2026-05394, is open for proposals until August 31, 2026, with Shaun Polley, Project Manager, serving as the primary point of contact.
Environmental Consulting Services

POSTED

6 days ago

DEADLINE

in 27 days
View Details