Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on June 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Former Fulton Mall Site Environmental Restoration Project

Closed
2123258State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, as well as the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with a specific requirement to achieve interior humidity levels of 50 percent or less. Key deliverables include the provision of a Certified Industrial Hygienist for verification and daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract will be awarded based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at a site visit on October 27, 2026, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must provide specific automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work is expected to commence within 14 days of the Notice to Proceed, with payment issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the environmental restoration of the Former Fulton Mall Site located at 308 Harrison Street, with a completion deadline of 90 days from award. The primary scope includes installing a minimum of one foot of soil cover over the designated site area, ensuring the material meets the standards for commercial use as specified in 6 NYCRR Part 375-6.7(d). The soil will be placed over a demarcation layer, with the top four to six inches of quality soil capable of supporting vegetation. To ensure proper integration with existing grades and surfaces, the contractor must scrape and blend soil along the site boundaries and around concrete slabs, creating a seamless transition to adjacent roadways, private properties, and structures. Key activities include tree and stump removal, groundwater well decommissioning, erosion control, grading adjustments, and precise surveying to document final elevations. The project emphasizes MWBE participation goals of 30%, with bids due by July 25, 2025, and public opening scheduled shortly thereafter. The contract is open to all New York State counties and is managed by the City of Fulton, with a project budget estimated between $500,000 and $1.5 million.

General Info

Agency

New York → City of Fulton

Place of Performance

NY, USA

Set-Aside

NONE

Documents

1

Former Fulton Mall Site Environmental Restoration Project Bid Package

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → City of Fulton
Contacts1 person available
OfficeN/A
Organization / Agency
New York → City of Fulton
Office AddressN/A
Contacts
Charles SmithCommissioner of Public Works

Full Description

Show more
The Record of Decision (ROD) for the Site requires the installation of a one-foot soil cover across the entire portion of the Site located on the south side of Harrison Street. The soil cover is required to be a minimum of one foot of soil (except as noted below), meeting the SCOs for cover material as set forth in 6 NYCRR Part 3756.7(d) for commercial use. The soil cover will be placed over a demarcation layer, with the upper four to six inches of the soil of sufficient quality to maintain a vegetation layer. Any fill material brought to the site will meet the requirements for the identified site use as set forth in 6 NYCRR Part 375-6.7(d) To accommodate existing / adjoining grades and surfaces, note the following: • The Site is adjoined on two sides by roadways and two sides by private property. In addition, a building is present on the northern Site interior. The soil cover system must tie into these existing surfaces / grades. The proposed grading to promote positive drainage and shed stormwater away from these important features is shown on Figure 4. • Along the boundaries, the CONTRACTOR shall scrape a minimum of six-inches of the surface soil and blend it into the interior of the Site surface prior to placing the demarcation fabric and cover soil. It is expected that a 10-foot to 15-foot swath along the Site perimeter be scraped back to the interior of the Site. Refer to Figure 3. • Along the concrete slab, the CONTRACTOR shall scrape a minimum of six-inches of the surface soil and blend it into the interior of the Site surface prior to placing the demarcation fabric and cover soil. It is expected that an approximate 5-foot to 10-foot swath around the slab will be scraped back to the interior of the Site. Refer to Figure 3. Completion of the remedy will generally require: • Removal and proper management of trees and stumps. • Decommissioning of groundwater monitoring wells. • Erosion and sediment control. • Grading modifications. • Placement of the soil cover. • Surveying of the Site to document the elevations of the modified subgrade and the depth of the final cover system. A current ALTA Survey is attached. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 30% Due date:07/25/2025 3:00 PM Bids due by 3pm on July 25,2025 and will be publicly opened at 3:15pm the same day Contract term: 90 days County(ies): All NYS counties Location: 308 Harrison Street (Site # E738039) Business entities awarded an identical or substantially similar procurement contract within the past five years: None

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS