Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fourth Gen Rocket Motor Semitrailer (RMS4)

Closed
FA8214RMS4Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
DIBBS
TRACK, LARGE
Solicitation # SPE4A7-27-T-1529
Solicitation SPE4A7-27-T-1529 is a fixed-price procurement issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the acquisition of four units of Large Track, identified by NSN 1450-00-089-4364. The items are to be delivered to the DLA Distribution DDSP New Cumberland facility in Pennsylvania, with a required delivery date of April 23, 2027. All quotes must be submitted through the DLA Internet Bid Board System (DIBBS). To be eligible for award, offerors must possess an approved US/Canada Joint Certification Program (JCP) certification and DLA controlling authority approval to access export-controlled technical data. The manufacturer's inspection system must comply with ISO 9001:2015 or an equivalent standard, and items produced via additive manufacturing are ineligible for award. Evaluation includes a price preference for certified HUBZone Small Business Concerns. The contract mandates strict adherence to MIL-STD-129 for packaging and RP001 for palletization. Inspection and acceptance will occur at the origin, utilizing zero-based sampling plans such as MIL-STD-1916 or ASQ H1331. Payment and invoicing must be processed electronically via the Wide Area WorkFlow (WAWF) system. Additionally, the procurement is subject to the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 regarding the safeguarding of covered defense information.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

2 days ago

DEADLINE

in 6 days

General Info

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

Place of Performance

NIBLEY, UT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

8 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Sep 1, 2025 to Oct 15, 2025.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Oct 15, 2025 to Dec 10, 2025. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Dec 10, 2025 to Jan 31, 2025. The notice description changed.

Notice updated

Response deadline changed from Jan 31, 2025 to Mar 24, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8214 Afnwc Pzbb
Contacts2 people available
OfficeHILL AFB, UT, 84056-5837, USA
Office AddressHILL AFB, UT, 84056-5837, USA
Contacts

Full Description

Show more

-------- ATTENTION // OPENING UP FOR ROUND #3 OF RFI in BOLD below // RESPONSE REQUESTED. ---------  3/9/2026



AGENCY/ORGANIZATION:


Department of the Air Force, Air Force Materiel Command, AFNWC/NIMT


WEAPON SYSTEM:


Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM)


IPT:


Ground Mechanical 



RFI PURPOSE:


This RFI provides notice that the RMS4 program team is currently evaluating the availability and manufacturability of a form, fit, and function replacement.  The form, fit, function RMS4 replacement must meet the requirements in Attachment 1. General Requirements RMS4. 



NOTICE:


This notification is for market research purposes only to identify potential contractors who have the skills, experience, and knowledge required to successfully complete this effort for the RMS4 effort and is not to be construed as a solicitation.  The issuance of this RFI and responses thereto do not imply a commitment to release a solicitation.  A determination by the Government not to compete any or all portions of the work discussed in this RFI rests solely within the discretion of the Government.  The Government will not pay for time, effort, materials, or any other costs that arise as a consequence of responding or providing information related to this RFI.



The purpose of this Sources Sought Synopsis is to conduct market research to determine if responsible sources exist and if this effort can be competitive and/or a total Small Business Set-Aside.  The proposed North American Industry Classification Systems (NAICS) Code is intended to be 336212 or 336999 which have a corresponding size standard of 1,000 or fewer employees.  The Government will use this information to determine the best acquisition strategy for this procurement.  The Government is interested in all small business, to include 8(a), Service-Disabled Veteran-Owned, historically underutilized business zone (Hubzone), and Women-Owned small business concerns.



BACKGROUND:


The Air Force’s (AF) fleet of RMS must support the MMIII LGM-30G ICBM until the end of its operational life.  However, the existing challenge of parts obsolescence poses a significant obstacle to providing seamless support.  Additionally, a scarcity of spare parts, some entirely unobtainable, coupled with substantial engineering updates required by the Technical Data Package (TDP), further complicates the situation.  Given these considerations, the AF aims to develop a new design, create a new TDP, and ultimately increase the RMS fleet.  Procurement of 16 RMS4, including one to two RMS4 during the Engineering, Manufacturing, and Development (EMD) phase, will be required.  During Production, the AF expects to procure the remaining 14 or 15 RMS4 for a total of 16.



RMS DESCRIPTION:


The RMS provides transportation of MMIII Stage 1, Stage 2, and Stage 3 solid boosters or select combinations of individual stages, herein referred to as the Boosters, loaded into the Stage 1, Stage 2, and Stage 3 Operational Rocket Motor Carriages.  The RMS provides a transportation platform that limits excessive shock and vibration to the Boosters.  It also provides a temperature-controlled environment designed to keep the Boosters within their required temperature range during transportation.  The Environmental Control Unit provides the required temperature control by use of an on-board diesel fueled generator and a closed loop Heating Ventilation and Air Conditioning unit. 



/////////////////////////// RFI # 3 BELOW ////////////////////



INFORMATION SOUGHT:


  1. Provide a detailed overview of your company's sub-contractor management plan. This plan should address, at a minimum, your procedures for:
    1. Requirement Compliance: How do you ensure sub-contractors adhere to all contractual and project-specific requirements?
    2. Performance Management: What metrics and processes do you use to monitor and evaluate sub-contractor performance in meeting cost, schedule, and technical requirements?
    3. Specialized Processes: How do you oversee and ensure the quality of specialized work, such as welding, performed by sub-contractors?
    4. Integration: How do you plan to ensure comprehension of technical requirements and configuration management is performed uniformly across sub-contractors. 
  2. If planning to sub-contract more than 20% of the work, please describe your company's position on including a clause in the Statement of Work (SOW) that provides the government with full rights to communicate with sub-contractors, audit sub-contractor records, visit sub-contractor facilities, and ultimately serve as oversight and approval of all sub-contractor events (e.g., Preliminary Design Review). 


RESPONSES:
Responsible and capable sources may identify their interest by providing a white-paper capability statement (limited to 2 pages) with sufficient information to substantiate that respondents can successfully perform all requirements.  Interested parties should make an earnest effort to thoroughly answer the Government’s questions.  Please see the RFI question set.  Government will consider responses to one or all purposes depending on company’s capability.




ELIGIBILITY REQUIREMENT:


Distribution of the RMS4’s Statement of Work and SRD are limited to contractors with a DD 2345 certified by the Defense Logistics Information Service, Joint Certification Program (1-877-352-2255) who have a legitimate business purpose.  As such, these Attachments cannot be provided to a contractor without a certification.  Contractors who would like to become certified can find the form and instructions at:


https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx.


Interested parties are advised that certification of a DD Form 2345 may take time, so completion and submission of that form as soon as possible is highly recommended.


This RFI is issued solely for informational and planning purposes.  No funds are available to fund the information requested.  The information in this notice is current as of the publication date but is subject to change and is not binding to the Government.  Oral submissions of information are not acceptable. For access to the attachments, your responses, and all questions related to the above please email to the following addresses: kyle.andersen@us.af.mil and torrey.boggs.2@us.af.mil



Submit the following information:


  • Company Name and Address
  • Cage Code
  • Unique Identifier
  • Company business size by North American Industry Classification (NAIC) code
  • Small Business Type (s), if applicable
  • Provide a response, including any recommendations and/or comments
  • Point of Contact for questions and/or clarification
  • Telephone Number and email address
  • Web Page URL
  • Teaming Partners (if applicable)
  • Determination of Adequacy of your accounting system by DCMA and/or DCAA for Cost Type Contracts.


edit: limit adjusted to 10 pages



ATTACHMENTS / LINKS:


  • Attachment 1. General Requirements RMS4
  • RMS4 Response Template
  • RMS4 Statement of Work

More opportunities from Department Of Defense → FA8214 Afnwc Pzbb

Same awarding agency

NAICS: 336419
Federal
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Solicitation # FA821426RB004
The Department of the Air Force, Air Force Nuclear Weapons Center, is soliciting the production and delivery of 25 flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program. These kits, which consist of a Flight Destruct System and an Integrated Instrumentation System, directly support the Air Force Global Strike Command Minuteman III Intercontinental Ballistic Missile Force Development Evaluation Operational Test Launch Program. The government intends to award a Firm-Fixed-Price contract to The Boeing Company as a sole source, citing their unique technical data and infrastructure. The total estimated program value is approximately 955 million dollars, with a period of performance spanning from October 2027 through September 2035. The contractor is responsible for the assembly, testing, and just-in-time delivery of the kits to Vandenberg Space Force Base, California, precisely 120 days prior to scheduled launches, with the first delivery expected in January 2032. All hardware must comply with strict Range Commanders Council commonality standards and military packaging and marking specifications. The contract mandates rigorous quality control, including the submission of a Quality Assurance Program Plan and Acceptance Test Reports. Additionally, the contractor must adhere to stringent operations security, cybersecurity, and data rights requirements to protect critical information and ensure government access to necessary technical data.
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS