This Solicitation opportunity from California was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first78 pages · specifications
HighAI Summary for 22-090 CIM Replace Roofs Phase 1 Final Drawings: This document is the final construction drawings for the California Institution for Men (CIM) Roof Replacement Phase 1 project, CDCR Project No: 22-090. It includes 78 sheets covering architectural, structural, mechanical, plumbing, and electrical plans for roof demolition and new work across multiple units (Cypress, Palm, Sycamore, Madrone, Birch, etc.). The drawings are dated 3/26/2025 and are marked as 100% construction documents, preliminary and not for construction. The scope involves removing existing roof systems and installing a Class 'A' fully adhered PVC roof membrane with insulation and modifications to roof drainage and parapets. Applicable codes and standards include the 2022 California Building Code, Electrical, Mechanical, Plumbing, Energy, Fire, and Green Building Standards, as well as referenced NFPA standards. The document serves as critical technical specifications and construction plans for the roofing project.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for 22-090 Roof Replacement Phase 1 Project Record Documents Specs: This document, identified as JCCA No. 23530 for Roof Replacement Phase 1 under CDCR No. 22-090, details the Project Record Documents specifications. It includes administrative and procedural requirements for record drawings, specifications, product data, and miscellaneous record submittals. The document outlines submission requirements for record drawings in both paper and digital formats (Revit), annotated specifications, and product data. It emphasizes accurate marking of record prints, including concealed elements and changes, and specifies formats and procedures for record digital data files and specifications. The document is essential for ensuring proper documentation and closeout submittals for the roofing project.
PDF
PDF, High priority: read this first50 pages · specifications
HighAI Summary for 22-090 Roof Replacement Phase 1 - Roof and Deck Insulation and PVC Roofing Specifications: This document is part of the JCCA No. 23530 Roof Replacement, Phase 1 project (CDCR No. 22-090). It includes detailed specifications for roof and deck insulation (Section 07 22 00) and polyvinyl-chloride (PVC) roofing (Section 07 54 19). The insulation section covers materials, system description, submittals, qualifications, regulatory requirements, mock-up, delivery, storage, handling, and installation instructions. It specifies insulation types, thermal resistance, thickness, manufacturers, and installation conditions. The PVC roofing section outlines roofing membrane components, related sections, references to standards, and installation requirements. The document is technical and intended for use in construction and installation of roofing systems, ensuring compliance with relevant standards and manufacturer instructions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 08 - Question 1 Image 1-4: This document is an addendum (Addendum 08) providing visual clarifications or responses to a specific inquiry (Question 1) via a series of images. As an amendment to a solicitation, it contains critical clarifying information for bidders.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Addendum 08 RFI 010 Unit 2 Dupont Tapered Cricket System: This document is Addendum 08 related to RFI 010 for Unit 2 Dupont Tapered Cricket System. It appears to be an amendment or addendum to a solicitation or contract, likely providing clarifications or additional information. The document is dated and versioned as Addendum 08, indicating it is a formal update. The content is largely unreadable or corrupted, but the filename and context suggest it is a procurement amendment related to a construction or building materials system.
PDF
PDF, High priority: read this first48 pages · sow
HighAI Summary for FPCM-CIM-1-001123-M01-SW Scope of Work and Attachments: This document from the California Department of Corrections and Rehabilitation, identified as FPCM-CIM-1-001123-M01-SW, contains the Scope of Work and multiple attachments relevant to a procurement. Key contents include the Scope of Work, Plans and Specification Sections, Bidder Declaration, Payee Data Record, Bidder Instructions, General Provisions for Non-IT Goods, and various certifications and checklists. The document serves as a comprehensive guide for bidders outlining requirements, instructions, and certifications necessary for the solicitation process.
PDF
PDF, High priority: read this first48 pages · sow
HighAI Summary for FPCM-CIM-1-001123-M01-SW Scope of Work and Attachments: This document from the California Department of Corrections and Rehabilitation, identified as FPCM-CIM-1-001123-M01-SW, contains the Scope of Work and multiple attachments related to a procurement. Attachments include plans and specifications, bidder declaration, payee data record, bidder instructions, general provisions for non-IT goods, contracting forms, certifications, and a roof system review checklist. The document serves as a comprehensive statement of work and supporting materials for the solicitation.
PDF
PDF, High priority: read this first48 pages · sow
HighAI Summary for FPCM-CIM-I-001123-M01-SW Scope of Work and Attachments: This document is a Scope of Work (SOW) for the California Department of Corrections and Rehabilitation under the identifier FPCM-CIM-1-001123-M01-SW. It includes a list of attachments such as plans and specification sections, bidder declaration, payee data record, bidder instructions, general provisions for non-IT goods, contracting forms, certifications, and a roof system review checklist. The document outlines the scope and related contractual attachments for facility planning, construction, and management.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for IFB FPCM-CIM-I-001123-M-001-SW_02 California Institution for Men: This document is an Invitation for Bid (IFB) issued by the California Department of Corrections and Rehabilitation for product purchase delivery to the California Institution for Men. The solicitation number is FPCM-CIM-I-001123-M-001-SW with revision 02 dated 7/31/2025. It includes bid submission instructions, contact information, and a mandatory walk-thru scheduled for August 20, 2025. The bid due date has been extended to September 24, 2025. The IFB specifies compliance requirements, preference claims for small businesses and disabled veteran business enterprises, and delivery terms FOB destination.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for IFB FPCM-CIM-I-001123-M001-SW Addendum 03: This document is Addendum #03 to the Invitation for Bid (IFB) FPCM-CIM-I-001123-M001-SW for roof assembly work at California Institution for Men. Dated 9/18/2025 with a bid due date of 9/24/2025, it provides answers to vendor questions and includes copies of RFIs. Key clarifications include roof deck conditions, missing plan details, warranty confirmation, sheet metal product requirements, expansion joint specifications, and fire rating requirements. Vendors must submit this addendum with their bid or face rejection.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for IFB FPCM-CIM-I-001123-M001-SW Addendum 05: This document is Addendum #05 to the Invitation for Bid (IFB) FPCM-CIM-I-001123-M001-SW issued by the California Department of Corrections and Rehabilitation. It extends the bid opening date to October 28, 2025, pending follow-up vendor questions. The IFB is for a product purchase to be delivered to the California Institution for Men. The addendum references mandatory walk-thru details and compliance requirements for bidders. The revision date is October 17, 2025, with the original IFB dated April 25, 2024.
PDF
PDF, High priority: read this first45 pages · ifb
HighAI Summary for IFB FPCM-CIM-I-001123-M001-SW Addendum 06 Roof Assembly: This document is an Invitation for Bid (IFB) FPCM-CIM-I-001123-M001-SW Addendum 06 issued by the California Department of Corrections and Rehabilitation dated 10/28/2025. It covers a product-only purchase for roofing assembly at the California Institution for Men, Facility B - Unit 2. The addendum includes a mandatory re-walk scheduled for November 5, 2025, and adds a line item for a site visit. Bidders must have attended the original mandatory walk on August 20, 2025, to participate. The IFB specifies detailed materials lists, warranty requirements, and submittals, including a 10-year full system warranty and FM Global listing. The bid due date is December 3, 2025, with questions due by November 12, 2025. The document includes instructions for bid submission, preference claims, and compliance declarations under penalty of perjury.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for IFB FPCM-CIM-I-001123-M001-SW Addendum 07: This document is Addendum 07 to the Invitation for Bid (IFB) FPCM-CIM-I-001123-M001-SW issued by the California Department of Corrections and Rehabilitation. Dated December 3, 2025, it extends the bid opening deadline to December 30, 2025, to allow time for the forthcoming Construction Bulletin and publishing of Q&A from the mandatory re-walk conducted on November 5, 2025. The IFB is for a product-only purchase for delivery to the California Institution for Men, with all other terms and conditions remaining unchanged.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for IFB FPCM-CIM-I001123 M001-SW Addendum 08: This document is Addendum 08 to the Invitation for Bid (IFB) FPCM-CIM-I001123 M001-SW issued by the California Department of Corrections and Rehabilitation. Dated 12/22/2025 with a bid due date of 12/30/2025, it provides updates following a mandatory re-walk on 11/05/2025. Key content includes additional pictures from the roof walk, responses to RFI 010 regarding the taper system, and instructions for vendors to bid fire-rated expansion joints over occupied roof sections. The addendum clarifies technical details and maintains all other terms and conditions of the original IFB.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for IFB FPCM-CIM-I-001123-M001-SW Addendum 4 for California Institution for Men Roof Assembly: This document is Addendum #04 to the Invitation for Bid (IFB) FPCM-CIM-I-001123-M001-SW issued by the California Department of Corrections and Rehabilitation for a roof assembly project at the California Institution for Men. Dated 10/03/2025 with a due date of 10/20/2025, it provides responses to follow-up questions from bidders and includes photos from the site walk conducted on August 20, 2025. The addendum clarifies architectural drawing availability, meeting requests with state designers, and details on tapered insulation slopes. It instructs bidders to submit this addendum with their bids or risk rejection. The document references prior RFIs and a forthcoming Construction Bulletin for further clarifications.
PDF
PDF, Low priority27 pages · rfi
LowAI Summary for Combined RFIs Document: This document appears to be a compilation of Requests for Information (RFIs) related to a procurement process. The content is largely unreadable or corrupted, but the filename and scattered text suggest it contains multiple RFIs. The document does not present clear solicitation details, technical specifications, or evaluation criteria, indicating it is not a primary solicitation or amendment. The purpose is likely to gather information from potential contractors or suppliers to inform future procurement decisions.
PDF
PDF, Low priority48 pages · other
LowAI Summary for FPCM-CIM-I-001123-M-01-SW 01 dated 7/31/2025: Document titled FPCM-CIM-I-001123-M-01-SW 01 dated 7/31/2025. The content is empty or unreadable, containing only a date with no additional information.
PDF
PDF, Low priorityother
LowAI Summary for Photos from Site Walk: The document contains no readable text content and appears to consist of images from a site walk.
PDF
PDF, Low priority1361 pages · other
LowAI Summary for Roof Replacement Phases 1-4 Project Manual CDCR No. 22-090: This document is the Project Manual for the Roof Replacement Phases 1-4 at the California Institution for Men in Chino, California, prepared for the California Department of Corrections and Rehabilitation. It includes a project manual title page, table of contents, project phase descriptions for four phases covering multiple buildings, phasing site plans, building data, applicable codes, and specifications divisions 00 through 33. The manual is dated 26 March 2025 with a 100% resubmittal status and includes detailed information on applicable building and fire codes, project scope, and site plans.