This Solicitation opportunity from California was posted on July 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 21-039_LAC Replace Roofs Project Manual Volume 2 Specifications: This document is the Volume 2 Specifications for the California Department of Corrections and Rehabilitation's Replace Roofs Project at California State Prison, Los Angeles County (LAC). Dated February 14, 2023, it covers Divisions 07 through 26 and includes detailed technical specifications for roofing and deck insulation (Section 07 22 00) and polyvinyl-chloride (PVC) roofing (Section 07 54 19). The specifications outline materials, installation procedures, regulatory requirements, submittals, qualifications, and related sections. It provides standards for insulation materials, roofing membranes, fasteners, adhesives, and mock-up requirements, ensuring compliance with applicable codes and manufacturer instructions.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Building 334 Roof Plan: Final drawings dated August 31, 2023, for the roof plan remodel of Facility A 270 Housing Unit Building 334 at the California State Prison, Los Angeles County. The document includes detailed roof plans, general construction notes, an equipment legend, and remodel keynotes specifying the installation of an 80 mil PVC roofing system, parapet extensions, and various flashing and drainage details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - EC201 Electrical Demolition: Electrical demolition roof plan (Sheet EC201) for the California Department of Corrections and Rehabilitation project at California State Prison, Los Angeles County. Dated August 31, 2023, the document provides technical drawings and general notes for the disconnection and replacement of electrical conduits, HVAC disconnects, and GFCI receptacles during Phase 1 of the roof replacement for Housing Unit Buildings 346-347.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Electrical Demolition Drawings: Electrical demolition roof plans and technical notes for Phase 1 of the roof replacement project at California State Prison, Los Angeles County (LAC). Dated August 2023, the document includes specific instructions for safe-offing circuits, conduit replacement, and coordination with mechanical units for the Department of Corrections and Rehabilitation.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Electrical Drawings: Electrical working drawings and general notes for the Phase 1 roof replacement project at California State Prison, Los Angeles County (LAC). The document includes typical 270 housing unit roof plan remodels, electrical conduit requirements, and instructions for reconnecting mechanical and electrical equipment. Dated August 31, 2023, with State Fire Marshal approval dated November 20, 2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Electrical Roof Plan Demolition: Electrical demolition drawings and technical notes for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County (LAC). The document includes specific instructions for the safe-off of electrical circuits, removal and replacement of conduits, and maintenance of fire alarm devices during roof construction. Dated August 31, 2023, with subsequent approvals through November 20, 2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Final construction drawings for the Replace Roofs Phase 1 project, featuring approval stamps from the Office of the State Fire Marshal dated 10/10/23 and 11/20/2023, including fire and panic approval and CASp certification.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Technical construction drawings and specifications for the 'Replace Roofs Phase 1' project. The document contains detailed requirements for roof curb adaptors, pipe support schedules (steel, copper, and cast iron), flashing, insulation, and installation details for HVAC units and vent pipes, including specific material gauges (14GA) and manufacturer standards (Thybar, Micrometal, B-Line).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Technical drawings and specifications for the 'Replace Roofs Phase 1' project (21-040-LAC), including details for AC unit platforms and ductwork on low roofs, with approval sections for the Office of the State Fire Marshal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Technical drawings and specifications for project 21-040-LAC Replace Roofs Phase 1, specifically detailing conduit fastening and support requirements on the roof, including distance requirements for outlet boxes and support intervals.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Final drawings for the Replace Roofs Phase 1 project, including approval from the Office of the State Fire Marshal dated 10/10/23 and CASp certification dated 11/20/2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Mechanical and plumbing drawings and specifications for the Replace Roofs Phase 1 project (21-040-LAC). The document includes a comprehensive symbol legend, applicable California building and fire codes, a sheet index for demolition and remodel plans across multiple facility buildings, and general mechanical/plumbing notes regarding duct sealing, flex connectors, and pressure testing.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Final project drawings for the Replace Roofs Phase 1 project (21-040-LAC), including approval from the Office of the State Fire Marshal dated 10/10/23 and CASp certification dated 11/20/2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Final project drawings for the Replace Roofs Phase 1 project (21-040-LAC), including approval from the Office of the State Fire Marshal dated 10/10/23 and CASp-491 certification dated 11/20/2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Final architectural drawings and building sections dated August 31, 2023, for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County. The document includes housing unit building sections, keynotes for roofing systems (80 mil PVC), and approvals from the Office of the State Fire Marshal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 Final Drawings: Final drawings and approval documents for the California Department of Corrections and Rehabilitation regarding the Replace Roofs Phase 1 project (21-040-LAC).
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040 LAC Replace Roofs Phase 1 - Final Drawings: Final structural and roof framing drawings for the California Department of Corrections and Rehabilitation (CDCR) project 'Replace Roofs - Phase 1' at Los Angeles County State Prison. The document includes roof framing plans for Buildings 346 and 347, wind pressure plans, stair cage partial roof plans, and detailed construction sequences for roofing removal and substrate repair. Dated August 31, 2023, with approvals from the State Fire Marshal and CASp.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040 LAC Replace Roofs Phase 1 - Final Drawings: Final structural drawings and specifications for Project No. 5843.10, 'Replace Roof Phase 1' at California State Prison, Los Angeles County (CDCR). The document includes detailed structural sections (S301), material specifications for HSS tubes and grating, and instructions for the removal and reinstallation of stair cages to provide access for roofing work. Dated August 31, 2023, with subsequent approvals from the State Fire Marshal and CASp.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Final structural and roof framing drawings for the California Department of Corrections and Rehabilitation (CDCR) project 21-040 at Los Angeles County (LAC) for Replace Roofs Phase 1. Dated August 31, 2023, the document includes roof framing plans for the 270 Housing Unit, wind pressure plans (SA 201), stair cage partial roof plans, and detailed construction sequences for roofing removal and substrate inspection.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Final demolition drawings and general notes for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County. The document includes a typical 270 housing unit roof plan demolition, equipment and demolition legends, and general construction notes dated August 31, 2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Technical working drawings and plumbing specifications for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County. The document includes rainwater calculations, roof area measurements (Areas A1-A15), and specific requirements for roof drains and scupper openings per 2022 CPC standards. Dated August 31, 2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Electrical working drawings and general notes for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County (Project #5843.10). The document includes roof plan remodels for Facility A Housing Unit Building 334, detailing the replacement and reconnection of electrical conduits, wiring, and GFCI receptacles following roofing replacement. Dated August 31, 2023, with subsequent approvals through November 2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Technical working drawings dated August 31, 2023, for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County. The document contains detailed mechanical and plumbing specifications (MP501, MP502), including curb extensions, insulation, and flashing details, prepared by Turley Mechanical Engineering & Associates Group and Hibser Yamauchi Architects.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Technical construction drawings and detail specifications for the 'Replace Roofs Phase 1' project for the State of California Department of Corrections and Rehabilitation. The document includes detailed sections for roof hatch curbs, penetration flashing, metal coping at parapet extensions, overflow scuppers, and ladder extensions, specifying materials such as PVC roofing assemblies, 22 GA galvanized steel, and Hilti anchors.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings: Final architectural drawings and building sections dated August 31, 2023, for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County. The document includes building sections for Housing Unit Building 334, detailed keynotes for roofing materials (80 mil PVC system), and approvals from the Office of the State Fire Marshal.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Final Drawings (Electrical): Electrical drawings and specifications for the Replace Roofs Phase 1 project (21-040-LAC). The document includes an electrical sheet index, symbol lists, abbreviations, branch circuit voltage drop tables, and general notes regarding demolition and installation of electrical components for housing unit roof plans.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040 LAC Replace Roofs Phase 1 - Typical Details (S501): Final structural drawings and typical details (Sheet S501) for the California Department of Corrections and Rehabilitation (CDCR) project 'Replace Roof Phase 1' at California State Prison, Los Angeles County (Job 21-040). The document contains technical specifications for concrete deterioration repair, sawcut openings, steel grating, and pipe post installations, including specific material requirements such as Hilti anchors and hot-dip galvanized steel. Dated August 31, 2023, with subsequent approvals through November 2023.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 21-040-LAC Replace Roofs Phase 1 - Working Drawings: Working drawings and rainwater calculations for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County (LAC). The document includes plumbing roof plans for Buildings 346 and 347, detailing roof drain sizes, overflow requirements, and rainwater calculations per 2022 CPC standards. Dated August 31, 2023, and prepared by Hibser Yamauchi Architects and Turley Mechanical Engineering Group.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 23-0002 Replace Roofs Phase 1 - Final Drawings: Approved fire and panic plans for the Replace Roofs Phase 1 project (23-0002), dated November 20, 2023, issued by the Office of the State Fire Marshal.
PDF
PDF, High priority: read this first53 pages · ifb
HighAI Summary for California State Prison Roofing Materials IFB: The California Department of Corrections and Rehabilitation has issued an Invitation for Bid (IFB) for the supply and installation of roofing materials at the California State Prison, LAC. The bid, identified as Solicitation No. FPCM-LAC-I001104-M035-RS, requires delivery of specific roofing materials and systems, including thermoplastic roofing membrane, sheet metal products, adhesives, and sealants. A mandatory walkthrough is scheduled for August 21, 2025, and bids are due by September 16, 2025, at 2:00 pm. Bidders must comply with California small business and disabled veteran business enterprise preferences. The project includes detailed requirements for materials, technical assistance, and warranty provisions. Bidders must submit a completed CDCR Roof System Review Checklist and meet all specified requirements to be considered for the contract award.
PDF
PDF, High priority: read this first1 page · contract-document
HighAI Summary for California State Prison Roof Replacement Phase 1: This document pertains to the roof replacement project at the California State Prison in Los Angeles County, managed by the California Department of Corrections and Rehabilitation. The project is in the working drawings phase, with approval from the Office of the State Fire Marshal. The document includes contact information for Turley Mechanical Engineering & Associates Group, Inc., the project engineer, and Hibser Yamauchi Architects, Inc., the architectural firm involved. The project is identified by job number JT 22107-PH1 and is scheduled for a plot date of August 25, 2023. The final approval of the plan is contingent upon field inspection, and the approved plans must be available on-site at all times. The document emphasizes compliance with applicable regulations and Title 24 reports.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CDCR 21-039 Replace Roofs Project Manual Volume 1: This document is the Project Manual Volume 1 for the California Department of Corrections and Rehabilitation (CDCR) project #21-039, titled 'Replace Roofs' at California State Prison, Los Angeles County (LAC). Dated February 14, 2023, it includes Divisions 00 through 06 and contains technical specifications, certifications, regulatory reviews, and project phase descriptions for roof replacement phases 1 through 3 covering multiple buildings. The manual is prepared by licensed architects and engineers and approved by the State Fire Marshal, providing detailed compliance requirements and project scope for the roofing replacement work.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for CDCR 21-040 Replace Roofs Phase 1 - Final Drawings: Final structural and roof framing drawings for the California Department of Corrections and Rehabilitation (CDCR) project 21-040, Phase 1, specifically for Building 334 ADSEG 270 Housing Unit at Los Angeles County Prison. The document includes roof framing plans, wind pressure values, construction sequences for roofing removal and installation, and structural repair criteria for concrete and metal decking. Dated August 31, 2023, with approvals from the State Fire Marshal.
PDF
PDF, High priority: read this first1 page · contract-document
HighAI Summary for General Notes for Construction Project: This document outlines the general notes and specifications for a construction project, detailing the interpretation of drawings and specifications, shop drawing requirements, safety protocols, and masonry standards. It emphasizes the contractor's responsibility to adhere to applicable codes, regulations, and safety orders, and to resolve any discrepancies with the architect and structural engineer. The document also specifies the submission process for shop drawings, the handling of errors, and the conditions under which substitutions may be reviewed. Additionally, it includes guidelines for construction within existing buildings and the allocation of allowances for structural materials. The masonry section mandates compliance with TMS and ASTM standards, addressing material quality and environmental conditions during construction.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - AC201 Roof Plan Demolition: Final drawings dated August 31, 2023, for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County. This specific document (Sheet AC201) provides the Roof Plan Demolition for Housing Unit Bldgs 346-347, including general notes, equipment legends, and detailed demolition keynotes for roofing systems, mechanical units, and electrical conduits.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Building 334 Roof Plan Demolition: Final drawings dated August 31, 2023, for the California State Prison, Los Angeles County (LAC) project 'Replace Roofs Phase 1'. The document specifically provides the Roof Plan Demolition for Facility A 270 Housing Unit Building 334, including demolition keynotes, general construction notes, and equipment/demolition legends.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Building 346/347 Working Drawings: Working drawings and mechanical/plumbing demolition plans for the California State Prison, Los Angeles County (LAC) Roofs Phase 1 project, dated August 31, 2023. The document includes detailed demolition notes for HVAC units, exhaust fans, and piping, an existing equipment schedule for buildings 346 and 347, and technical specifications for the removal and protection of equipment during re-roofing.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings dated August 31, 2023, for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County. The document contains detailed technical specifications for PVC roofing assemblies, guardrails, roof hatches, plumbing access doors, and catwalks, including specific material requirements and installation details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings and specifications dated August 31, 2023, for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County (LAC). The document includes a typical 270 housing unit roof plan remodel, general construction notes, equipment legends, and a remodel legend specifying a 80 mil PVC roofing system. It contains critical technical details regarding flashing, parapet extensions, and mechanical equipment re-installation.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings dated August 31, 2023, for the Phase 1 roof replacement project at the California State Prison, Los Angeles County. The document provides detailed technical specifications for PVC roofing assemblies, including parapet/curb extensions, cricket assemblies, scupper isometrics, walkpad installation, and conduit/pipe supports.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings dated August 31, 2023, for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County. The document includes detailed plans and sections for bird deterrent systems, fixed metal ladders, and stair cage extensions, including specific material requirements for PVC roofing assemblies and galvanized steel components.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings dated August 31, 2023, for the California State Prison, Los Angeles County (LAC) project 'Replace Roofs Phase 1'. The document includes detailed architectural plans, sections, and elevations for stair cages, mechanical bird deterrent cages, gun posts, and termination strips, featuring PVC roofing assembly specifications and structural details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings dated August 31, 2023, for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County. The document contains detailed technical specifications for PVC roofing assemblies, overflow drains, scuppers, pitch pockets, and termination strips, including material requirements and installation details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Final Drawings: Final construction drawings dated August 31, 2023, for the Replace Roofs Phase 1 project at the California State Prison, Los Angeles County. The document includes technical architectural details for PVC roofing assemblies, parapets, water heater mounting, and metal coping, and contains approvals from the State Fire Marshal.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Mechanical/Plumbing Photos (MP801): Technical drawing/photo sheet (MP801) for the California State Prison, Los Angeles County (LAC) 'Replace Roofs Phase 1' project. Dated August 31, 2023, and approved by the State Fire Marshal on November 20, 2023. The document identifies existing (E) mechanical and plumbing components, including scuppers, pipes, gas regulators, and ductwork, prepared by Turley Mechanical Engineering & Associates Group, Inc.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Mechanical/Plumbing Roof Plan Remodel: Working drawings and mechanical/plumbing roof plan remodel for the California State Prison, Los Angeles County (LAC), dated August 31, 2023. The document includes detailed remodel notes for the re-installation of existing equipment (AHUs, AC units, exhaust fans, and water heaters) on new raised curbs, piping reconnection requirements, and an existing equipment schedule. It specifies field verification of unit information and curb heights.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Mechanical/Plumbing Typical Roof Plan: Working drawings and technical specifications for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County, dated August 31, 2023. The document includes mechanical and plumbing typical roof plan remodel notes, equipment schedules for AHUs, AC units, and exhaust fans, and detailed instructions for re-installing equipment on new raised curbs and flashing penetrations.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Roof Plan Demolition: Working drawings and demolition plans for Phase 1 of the roof replacement project at the California State Prison, Los Angeles County (LAC). Dated August 31, 2023, the document includes mechanical/plumbing facility demolition notes, an existing equipment schedule for AHUs, AC units, and exhaust fans, and specific instructions for the removal and protection of equipment during reroofing.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Working Drawings: Mechanical and plumbing working drawings and equipment schedules for the 'Replace Roofs Phase 1' project at the California State Prison, Los Angeles County. Dated August 31, 2023, the document includes detailed instructions for re-installing AC units, AHUs, exhaust fans, and water heaters on new raised curbs, as well as piping and ductwork reconnection requirements.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for LAC Replace Roofs Phase 1 - Working Drawings (MPB302): Technical working drawings and rain water calculations for the 'Replace Roofs Phase 1' project at California State Prison, Los Angeles County (LAC). The document includes plumbing facility plans for buildings 334-335, roof area calculations (EQA), and drainage specifications per 2022 CPC, dated August 31, 2023.