Franklin Reservoir Emergency Spillway Maintenance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Franklin Reservoir Emergency Spillway Maintenance project, managed by the Los Angeles Department of Water and Power, involves the removal of approximately 100 to 150 cubic yards of accumulated sediment from a 0.03-acre section of the spillway channel bottom. The work will be performed at the LADWP Franklin Reservoir located at 1300 N Beverly Dr, Los Angeles, California. To execute the project, a temporary single entry and exit point will be established from the western bank near the downstream end of the spillway. Equipment utilized for the removal process will include a mini-excavator and a skid steer loader. All construction equipment staging and storage must be conducted in previously disturbed or developed areas outside of jurisdictional waters. The project is supervised by the Department of Water Resources Division of Dam Safety and has been granted an exemption under the California Environmental Quality Act CEQA Guidelines Article 19, Section 15301(m), as it constitutes maintenance of an existing facility without expansion of use. Administrative oversight is provided by Environmental Specialist David Norris, and the project was formally authorized by the Manager of Environmental Planning and Assessment on November 12, 2025.

General Info

LADWP will remove sediment from Franklin Reservoir spillway using mini-excavators and skid steers.

Agency

California Los Angeles Department of Water and Power

Place of Performance

N Beverly Dr at Lake Dr, Los Angeles, CA, 90210

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
David NorrisEnvironmental Specialist

Full Description

Show more
The Project involves removal of sediment from the Franklin Reservoir Emergency Spillway lined channel bottom. A temporary single entry/exit point will be established to access the spillway from the western bank near the downstream end of the spillway. Equipment such as a mini-excavator and a skid steer loader will be used to remove approximately 100 to 150 cubic yards of accumulated sediment from a 0.03-acre section of the spillway channel. All staging and storage of construction equipment will occur in previously disturbed/ developed areas outside of jurisdictional waters.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is seeking design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project aims to facilitate the regular inspection of approximately 27,000 feet of perforated corrugated metal seepage collector pipe, with manhole depths estimated between 10 and 25 feet. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, post-completion video inspections of collector lines, and final as-built drawings. This is a two-phase selection process under solicitation W912DQ26RA065. Phase 1 focuses on qualifications and technical approach, with no pricing submitted at this stage; the government intends to select up to three qualified offerors for Phase 2. Evaluation factors include Performance Confidence, Technical Approach and Qualifications, Design Concepts, and Small Business Participation, with non-price factors being significantly more important than price. The project is categorized under NAICS code 237990 with a small business size standard of 45 million dollars. While the estimated price range is between 1 million and 5 million dollars, the total contract award amount shall not exceed 3.4 million dollars as a firm-fixed-price contract. All work must comply with USACE Engineering Regulations, including ER 1110-1-1807 and EM 1110-2-2902, and adhere to Davis-Bacon Act wage determinations.
W071 Endist Kansas City

POSTED

about 17 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
Federal
FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA
Solicitation # W912EP26BA015
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for a firm fixed price contract for maintenance dredging of Fort Pierce Harbor in St. Lucie County, Florida. The project involves excavating material and placing it onto Fort Pierce Beach, with a specific prohibition on offshore pipeline access due to hardbottom areas; consequently, fill must be offloaded inside the South Jetty of Fort Pierce Inlet. The scope of work is divided into a base requirement and two options, encompassing dredging operations, environmental and water quality monitoring, sea turtle trawl sweeping, beach tilling, and vibration control. The target price range for the project is between $5,000,000 and $10,000,000, with a small business size standard of $37 million under NAICS code 237990. Bids are due by October 16, 2026, and must be submitted electronically via the Procurement Integrated Enterprise Environment portal. The contractor must commence work within 60 calendar days of receiving the Notice to Proceed, with a final completion deadline of June 30, 2027. Performance is subject to strict seasonal restrictions for sea turtle nesting, specifically from November 1 through May 15 for Area B and through May 30 for Area A. Key requirements include the submission of a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less, and the provision of performance and payment bonds equal to 100 percent of the contract price. Additionally, the project mandates compliance with the Davis-Bacon Act, the Buy American Requirement, and the implementation of a comprehensive Quality Control system managed by an on-site QC Manager.
W074 Endist Jacksnvlle

POSTED

about 17 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS