Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 20, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Frenchman Lake OHV Expansion and Paving, Installation of Vault Toilet, and Construction of Paved Accessible Trail

Awarded
AG-9A63-S-10-0062Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Solicitation AG-9A63-S-10-0062, issued by the Department of Agriculture's Tahoe National Forest, outlines a project for recreation improvements at Frenchman Lake within the Plumas National Forest in California. The scope of work includes the expansion and paving of the OHV parking area, the installation of a vault toilet, and the construction of a paved accessible trail. The project involves detailed engineering requirements for road resurfacing, concrete paving, and adherence to National Forest System Road specifications, including strict quality control for materials, asphalt, and concrete. This contract is designated as a set-aside for Service Disabled Veteran Owned Small Businesses, with a government cost estimate ranging between 500,000 and 1,000,000 dollars. Technical requirements include the submission of a Reclamation Plan for the plastics and clay source pit. While the initial response deadline was set for August 18, 2010, Amendment 1 extended the proposal submission date to August 24, 2010, and provided clarifications on aggregate grading and design specifications.

General Info

Contract Value

$840,749

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Frenchman Lake Dam, Chicoot, CA, USA

Set-Aside

NONE

Award Issued Date

Documents

7
DOC, High priority: read this firstamendment
High
DOCX, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
DOC, High priority: read this firstifb
High
PDF, Low priorityother
Low
OCTET-STREAM

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 10:00 PM UTC to 7:00 PM UTC on Aug 17, 2010. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Tahoe National Forest
Contacts2 people available
OfficeNEVADA CITY, CA, 95959, USA
Office AddressNEVADA CITY, CA, 95959, USA
Contacts
Matthew GagnonContracting Officer
Diane J. JonesProcurement Technician

Full Description

Show more
This project consists of expanding two parking areas at the Frenchman Lake Dam, paving the parking areas, installing a vault toilet, and constructing a paved accessible trail from the kiosk parking area down to the lake. The material produced at the parking areas will be crushed into a surface gradation aggregate and hauled to the aggregate surfaced portion of the lake periferal road and fishing accesses. The total mileage to be resurfaced is aproximately 8 miles. The project is located at Frenchman Lake near Chilcoot, CA. The project can be reached by taking CA State Route 70 to Chilcoot, then turning north onto State Route 284. Take State Route 284 approximately 6.5 miles to Frenchman Lake Dam. The estimated start work date is November 15, 2010 with a completion date of October 15, 2011. Estimated solicitation issue date is July 19, 2010. NOTE: There will be a prebid meeting on August 12, 2010, at 11:00 am at the site.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS