Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Mississippi was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fry Building Abatement and Demolition

Closed
74166312State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 14 hours ago

DEADLINE

in 15 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 15 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The City of Natchez is soliciting sealed bids for a project involving asbestos abatement, demolition, limited soil removal, and site restoration at the Fry Building site located at 116 North Pearl Street. The solicitation includes a Base Bid and two Alternates. The Base Bid requires asbestos abatement compliant with all relevant federal, state, and local regulations. Alternate No. 1 covers the demolition of the Fry Building post-abatement, including the removal of slabs and foundations, as well as disposal of all demolition debris. Alternate No. 2 involves demolition of adjacent parking lots, limited removal of non-hazardous contaminated soils from specified sections according to EPA-approved plans, and site restoration, which includes the installation of an interim gravel parking lot over the former building and parking areas. Bids must be submitted to the Office of the City Clerk by 10:00 A.M. CST on July 8, 2026, when they will be publicly opened and reviewed. A mandatory Pre-Bid Conference for all interested bidders will be held on June 17, 2026, at 10:00 A.M. CST at the project site, with a relocation option to Natchez City Hall in case of bad weather. Soil sampling, testing, and regulatory decisions related to soil contamination will be managed by entities other than the contractor, following the EPA-approved Cleanup Quality Assurance Project Plan. This contract is managed by the City of Natchez, Mississippi, with James Johnston serving as the primary point of contact for inquiries.

General Info

Asbestos abatement, demolition, soil removal, site restoration at Fry Building, bids due July 8, 2026.

Agency

Mississippi → City of Natchez

Place of Performance

124 South Pearl Street, Natchez, MS, 39120, USA

Set-Aside

NONE

Documents

16

01 Quality Assurance Project Plan.pdf

HTML

02-Corrective Action Plan Fry Building July 9 2025.pdf

HTML

03-Asbestos-Containing Materials Survey Report March 8 2022.pdf

HTML

04-Memorandum titled Exterior Asbestos Sampling May 28 2026.pdf

HTML

05-Phase II ESA Report Fry Building March 28 2022.pdf

HTML

06-EPA Brownfield Cleanup Grant Terms & Conditions.pdf

HTML

07-MDEQ Brownfield Cleanup RLF Terms and Conditions.pdf

HTML

08-Build America Buy America Provisions.pdf

HTML

09-American Iron and Steel Provisions.pdf

HTML

10-Davis Bacon Wage Determination.pdf

HTML

11-Section 106 Compliance MOA February 3 2026.pdf

HTML

12-Addendum No 01 May 28, 2026.pdf

HTML

2026-05-28_Plans and Specs - Fry Building-compressed.pdf

HTML

2026-05-28_Plans and Specs - Fry Building-Final.pdf

HTML

Appendices.pdf

HTML

Legal Notice - Fry Bldg.pdf

HTML

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMississippi → City of Natchez
Contacts1 person available
OfficeNatchez, MS, 39120, USA
Organization / Agency
Mississippi → City of Natchez
Office AddressNatchez, MS, 39120, USA
Contacts

Full Description

Show more
The City of Natchez will receive sealed bids for asbestos abatement, demolition, limited soil removal, and site restoration activities at the Fry Building Site, located at 116 North Pearl Street in Natchez, Mississippi. The project includes a Base Bid and two Alternates, as further described below. Bids will be received in the Office of the City Clerk, 124 South Pearl Street, Natchez, Mississippi 39120, until 10:00 A.M. CST on Wednesday, July 8, 2026, at which time bids will be publicly opened, read aloud, and thereafter taken under advisement until the next meeting of the Natchez Mayor and Board of Aldermen. A Pre-Bid Conference will be held on Wednesday, June 17, 2026, at 10:00 A.M. CST, at the project site. In the event of inclement weather, the pre-bidders meeting will take place in the upstairs conference room of Natchez City Hall. The Base Bid consists of asbestos abatement of the Fry Building in accordance with applicable federal, state, and local regulations. Alternate No. 1 consists of demolition of the Fry Building following asbestos abatement, including removal of slabs and foundations within the building footprint and disposal of demolition debris. Alternate No. 2 consists of demolition of existing adjoining parking lots; limited removal and disposal of non-hazardous contaminated surficial soils from up to four (4) Engineer-identified excavation sections, each assumed to measure approximately ten (10) feet by ten (10) feet by two (2) feet deep, if apparent contamination is observed in accordance with the EPA-approved Cleanup Quality Assurance Project Plan (QAPP); and site restoration, including installation of an interim gravel parking lot over the former parking lot areas and the former Fry Building footprint. Limited soil removal under Alternate No. 2 will be conducted in coordination with the EPA-approved Cleanup QAPP. All soil sampling, analytical testing, confirmation sampling, and regulatory decision-making will be performed by others.
NOTE: Documents are provided both individually and as one "compressed" file as titled "2026-05-28_Plans and Specifications-Fry Building-Compressed.PDF" see below.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS