Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 31, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FTQW 19-0504, CHPP Electrical Panels Phase B

Awarded
FA5004-18-R-D005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 354th Contracting Squadron is seeking a highly qualified Architect-Engineering firm for a 100 percent small business set-aside contract to provide professional engineering services at Eielson Air Force Base, Alaska. This project represents Phase B of a three-phase effort to replace aging low voltage electrical panels, lighting, and wiring at the Central Heat and Power Plant, specifically focusing on all floors above the first floor of the main plant, as well as the ash silo building and cooling pond pump house. The scope of work includes site investigations, development of design concepts, production of final design documents, and the planning of hazardous materials abatement for asbestos, lead-based paint, and PCBs. The government intends to award a single Firm Fixed-Price contract based on a competitive selection process governed by FAR Part 36.6. Ideal candidates must demonstrate specialized experience in designing industrial control systems within hazardous environments, specifically Class II, Div 1 and 2, Group F. Required qualifications include Alaska-registered Electrical Engineers and expertise in cost estimating, project management, and hazardous materials surveying. Offerors are required to submit Standard Form 330 and past performance questionnaires to be evaluated on their professional qualifications, capacity, and experience with sub-arctic industrial facilities.

General Info

Contract Value

$143,899

NAICS

541330 - Engineering Services

Place of Performance

Eielson AFB, AK, EIELSON AFB, AK, 99702, USA

Set-Aside

NONE

Award Issued Date

Documents

6

CHPP Elect Panels Ph B (B6203) - Instructions to Offerors

PDF, High priority: read this firstrfp
High

Evaluation Factors - Repair CH&P Electric Panels/Circuits Phase B

PDF, High priority: read this firstevaluation-factors
High

FTQW 19-0504 Repair CH&PP Electrical Panels/Circuits Phase B SOW

PDF, High priority: read this firstsow
High

SF330 Architect-Engineer Qualifications

PDF, High priority: read this firstpast-performance
High

AMRDEC SAFE Getting Started Guide (Project FTQW19-0504)

PDF, Low prioritysupporting-document
Low

Attachment 5 - Past/Present Performance Questionnaire (CHPP Elect Panels Ph B)

PDF, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 4:59 AM UTC to 12:00 AM UTC on Feb 6, 2018. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5004 354 Cons Pk
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-2200, USA
Office AddressEIELSON AFB, AK, 99702-2200, USA
Contacts
Sonia O RiveraContracting Specialist
Tanya L. GutkaContracting Officer

Full Description

Show more
ARCHITECT-ENGINEERING (A-E) SERVICES AT EIELSON AFB, AK. "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs." The 354th Contracting Squadron is seeking qualification packages and past performance information from vendors interested in providing professional engineering services at Eielson AFB, AK to replace the low voltage electrical panels, lighting and wiring throughout the Central Heat & Power Plant (CH&PP). BACKGROUND: A. The Central Heat and Power Plant (CH&PP) is a coal-fired cogeneration power plant providing steam for district heat and electricity for the facilities on Eielson AFB. The plant was originally built in 1952 and has six floors (including the basement). B. The majority of the low voltage (480V and lower voltage) electrical panels, lighting throughout the power plant and the interconnecting wiring are old and in poor condition. In addition, lighting levels in many parts of the plant are inadequate. C. In 2012 and 2013, a design was produced for replacement of all of the lighting and lighting panels in the plant as well as in the cooling pond pump house and the ash silo building. At the end of the design, it was determined that the project was too costly and should be broken into three phases, however, funding was not available at the time to modify the existing design contract. The design consultant, however, did provide a rough phasing plan. D. Since completion of the 2013 design, Boilers 5 and 6 at the plant have been replaced. As part of the boiler replacements, the lighting around those boilers has also been replaced, and other electrical changes have been made. E. In 2017, a contract was awarded for design of the first phase of the lighting project. Phase A includes replacement of all lighting in the basement and on the first floor of the main plant. In addition, Phase A includes replacement of an automatic transfer switch, installation of a new battery back-up for the lighting, installation of lighting distribution panelboards, and installation of a 480V/277V transformer. F. Almost all areas inside the plant are dusty. Many areas are classified as Class II, Div 1 or 2, Group F. In addition, many of the metal surfaces inside may be coated with lead-based paint and there may be asbestos containing materials in the project area. PROJECT GOALS: 1. This will be the second phase of a three phase project to replace the existing lowvoltage electrical panels, lighting and wiring in the CH&PP, ash silo building andcooling pond pump house. Primarily, the work of Phase B includes replacement ofthe lighting on all floors above the first floor of the main power plant building. 2. Hazardous materials abatement as necessary to complete the other work of theproject. This is a competitive selection process in which competing offeror's qualifications will be evaluated in accordance with (IAW) FAR Part 36.6 to determine the most highly qualified firms. The Government intends to award one Firm Fixed-Price contract. IAW FAR 36.603(b): To be considered for architect-engineer contracts, a firm must file with the appropriate office or board the Standard Form 330, "Architect-Engineer Qualifications," Part II and when applicable, SF 330, Part I. Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this posting; all costs associated with responding will be solely at the interested parties' expense. Failure to respond to this post does not preclude participation in the subsequent technical evaluation so long as a firm's SF 330 is currently on file with the 354th Contracting Squadron. It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement. This acquisition will be a 100% Small Business set-aside. The NAICS 541330 (Engineering Services) applies to this acquisition, with a small business size standard of $15M. A. Tasks will include, but not be limited to: 1. Site investigation, investigation of options, development of design concepts, andproduction of an investigation report, including a discussion of options withrecommendations and cost estimates. 2. Development of the design documents for the selected option - including designanalysis, specifications, drawings and cost estimates. 3. Attendance at the various project related meetings and review conferences. 4. Responding to review comments and making revisions to the design as agreed uponduring the reviews. 5. Producing and submitting the final project design documents. A-E EXPERIENCE REQUIREMENTS: A-E's experience shall include that which is commensurate with the requirements specific to the scope of design. A. The ideal firm should have experience designing industrial control systems and upgrades to such systems, especially in operating industrial plants and in hot, dirty and hazardous environments, specifically Class II, Div1 and 2, Group F; experience in surveying existing facilities for hazardous materials, and design including remediation of such hazards as necessary to complete the other work of the project. B. The A-E shall demonstrate that they have experienced personnel with Alaska Registrations, and adequate capacity and depth in the following disciplines: 1. Electrical Engineering C. The A-E shall demonstrate that they have experienced personnel with certification, and adequate capacity and depth in the following areas: 1. Hazardous materials surveying, and preparing abatement and worker protection specifications. 2. Cost Estimating 3. Project Management The Air Force requires complete and functional designs that are appropriate for the sub-arctic environment for interior Alaska and that meet all applicable Federal, State, Local, Industry, U.S. Air Force and Eielson AFB requirements. The A-E shall be responsible for all travel and lodging arrangements and expenses involved in the performance of work under this contract. The A-E shall furnish the Air Force with complete and usable products to include: planning documents, investigative reports, study reports, design analyses, project drawings, technical provisions (specifications), equipment layouts, cost estimates, submittal registers, quality assurance plans, constructability review reports, construction bidding amendments, construction contract modifications, and other documents. QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than 17 January 2018. Primary POC email: sonia.rivera@us.af.mil Alternate POC email: tanya.gutka @us.af.mil. The following documents are considered Attachments to this Synopsis/Solicitation: Attachment 1 - Instructions to Offerors Attachment 2 - Evaluation Criteria Attachment 3 - Statement of Work Attachment 4 - SF 330 Attachment 5 - Past Performance Questionnaire Attachment 6 - AMRDEC Guide

More opportunities from Department Of Defense → FA5004 354 Cons Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS