Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FTQW 20 0504 2 CHPP Electrical Upgrades

Closed
FTQW2005042Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices to improve safety during collection, and performing detailed oil testing and analysis. Additionally, the selected contractor must provide on-site training for up to 20 agency staff members and develop comprehensive standard operating procedures. All work must adhere to NETA MTS standards, IEEE guidelines, NFPA 70E safety protocols, and ASTM D923 and D924 sampling requirements, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable offeror based on their project experience with utilities or industrial facilities, proposed staffing and methodology, personnel availability, and cost-effectiveness. Proposals must be submitted electronically via PlanetBids by December 23, 2026, at 3:00 pm. Required documentation includes a detailed project approach, a company profile, three references from the last five years, and various certifications including a Non-Collusion Statement and Workers Compensation Certificate. The contract will utilize fixed pricing with a not-to-exceed total value and requires the contractor to be registered with the Department of Industrial Relations as a public works contractor. Payment will be processed electronically via ACH within 30 days of invoice approval.
Inland Empire Utilities Agency

POSTED

about 5 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project scope requires a qualified electrical contractor to inspect, test, repair, and certify all emergency lighting systems, which includes inventorying fixtures, simulating utility outages for functional testing, and replacing ten failing or outdated ballasts with LED-compatible versions. Key deliverables include the application of durable, uniquely numbered labels to all fixtures and the integration of a recurring 30-day functional testing schedule into the facility's Computerized Maintenance Management System. All work must adhere to NFPA 101 (2024 Edition), NFPA 70, and OSHA safety regulations. The estimated contract value ranges between $25,000 and $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a detailed cost breakout on company letterhead, and a bid bond guarantee of 20% for bids exceeding $25,000. Awarded contractors must provide performance and payment bonds and comply with the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and various FAR clauses regarding small business utilization and security. This opportunity is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract solicitation, designated FTQW2005042 and issued by the Department of the Air Force at Eielson Air Force Base (AFB), Alaska, focuses on the comprehensive upgrade and modification of the low voltage electrical and lighting systems within the Central Heat Power Plant (CHPP) facility. The scope entails removal and replacement of existing electrical panels, associated transformers, and outdated lighting fixtures to meet current voltage standards. The project duration spans from January 28, 2026, to July 27, 2027, with a firm fixed-price arrangement and a mandated completion timeline of 545 calendar days from the notice to proceed. This effort is classified as a Total Small Business Set-Aside under NAICS code 238210, with a business size standard of $19 million and an estimated contract magnitude ranging between $1 million and $5 million. Payment and performance bonds, each valued at 100% of the contract price, are required in compliance with FAR 28.102. A mandatory site visit is scheduled for December 16, 2025, at the CHPP facility, with prior participant registration due December 15, and a question submission deadline set for December 19, all coordinated via designated Air Force contacts. The contract incorporates detailed sequencing and operational requirements to ensure minimal disruption to power services during panel replacements, including government-provided temporary power arrangements and a strict cutover order outlined in electrical drawings and sequencing plans. Compliance with numerous applicable federal and state laws is mandated, including prevailing wage requirements, labor law certifications, and worker protection statutes. Insurance and indemnification clauses require comprehensive coverage for workers’ compensation, public liability, and property damage. Submittals must be electronic only, adhering to FAR 14.202-8 directives, with bids due by January 20, 2026. The solicitation references standard contract provisions including performance inspection, acceptance criteria, and bond requirements, although formal FAR clause numbers are not enumerated within the documents. Additionally, the package includes numerous technical and administrative attachments such as prevailing wage schedules, reciprocal limitations and certification forms, plus extensive technical drawings and technical specifications. The contract administration details designate invoicing and contracting officer points of contact and stipulate adherence to all applicable standards and reporting obligations throughout project execution.

General Info

Upgrade low voltage electrical systems at Eielson AFB CHPP, small business set-aside, Jan 2026–Jul 2027.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Eielson AFB, AK, 99702, USA

Set-Aside

SBA

Documents

22

Amendment 0001 to Solicitation FA500426B0001

PDF, High priority: read this first3 pages · amendment
High

Amendment 0003 to Solicitation FA500426B0001

PDF, High priority: read this firstamendment
High

Amendment FA500426B00010002 to Solicitation

PDF, High priority: read this first3 pages · amendment
High

Eielson AFB Repair CH&PP Phase C Drawing Schedule

PDF, High priority: read this first1 page · schedule-of-drawings
High

Hazardous Materials Report Appendix A - Laboratory Sample Results 2023-09-19

PDF, High priority: read this firsthazardous-materials-report
High

Project FTQW 20-0504 Repair CH&PP Electrical Panels Drawing Set

PDF, High priority: read this firstdrawings
High

Sequencing Plan for Electrical Panels

PDF, High priority: read this first5 pages · sequencing-plan
High

Solicitation Amendment FA500426B00010001 - CHPP Electrical Panel Update

PDF, High priority: read this first41 pages · amendment
High

Solicitation Amendment FA500426B00010002 - CHPP Electrical Panel Update

PDF, High priority: read this first41 pages · amendment
High

Solicitation FA500425B0001 Q&A for CHPP Electric Panels Repair

PDF, High priority: read this first3 pages · q-and-a
High

Solicitation FA500426B0001 Electrical Panel Update

PDF, High priority: read this first40 pages · ifb
High

Solicitation FA500426B0001 Q&A for CHPP Electric Panels Repair

PDF, High priority: read this firstq-and-a
High

Solicitation FA500426B0001 Q&A for Repair CHPP Electric Panels & Circuits

PDF, High priority: read this first8 pages · q-and-a
High

Specifications - Summary of Work and Project Requirements

PDF, High priority: read this firstspecifications
High

Statement of Work FTQW 200504 Repair CHPP Electric Panels & Circuits Phase C

PDF, High priority: read this firstsow
High

Statement of Work FTQW 200504 Repair CHPP Electric Panels & Circuits, Ph C

PDF, High priority: read this first7 pages · sow
High

Submittal Register for Repair CHPP Phase C

PDF, High priority: read this firstsubmittal-register
High

Wage Determination AK2025000112 for Alaska Building and Heavy Construction 2025

PDF, High priority: read this first19 pages · wage-determination
High

Appendix Hazardous Materials Report

PDF, Low priority1 page · other
Low

FA5004-26-B0001 Financial Institution Reference Sheet

PDF, Low priority1 page · financial-responsibility-form
Low

Financial Institution Reference Sheet

PDF, Low priority1 page · financial-reference-sheet
Low

Solicitation+Amendment+-+FA500426B00010003.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jan 20, 2026 to Feb 19, 2026. The notice description changed.

Deadline changed

Response deadline changed from Feb 19, 2026 to Feb 18, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Feb 18, 2026 to Feb 19, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5004 354 Cons Pk
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-2200, USA
Office AddressEIELSON AFB, AK, 99702-2200, USA
Contacts

Full Description

Show more

The purpose of this project is to upgrade and modify the low voltage electrical and lighting systems at Eielson's Central Heat Power Plant (CHPP) to include removal, and replacement of the existing electrical panels, associated transformers, and the remainder of existing outdated lighting fixtures within CHPP facility at Eielson AFB.


*** IAW FAR 14.402-3(a)(2) Postponement of openings.  The bid opening and due date have be moved to 19 FEB 2026 at 1300hrs due to weather related issues in the area.  


Teams bid opening information:


Join the meeting now


Meeting ID: 993 815 441 298


Passcode: Tg99Ro3G


Dial in by phone


+1 410-874-6750,,329967485# United States, Odenton


Find a local number


Phone conference ID: 329 967 485#


An additional site visit has been scheduled on 29 January 2026, 12:30 PM AKDT
Please submit the names of the individuals that will be in attendance to SrA Christopher Blackburn and Mr. Ryan Smith at 354CONS.PKA.MonitorConstruction@us.af.mil by 02:00 PM AKDT on 17 February 2026.


Participants will meet at-
Eielson CHPP B6203, 2676 Industrial Dr, Eielson AFB, Alaska


A site visit will be conducted on 16 December 2025, 10:00 AM AKDT


Participants will meet at-
Eielson CHPP B6203, 2676 Industrial Dr, Eielson AFB, Alaska


Each prime contractor is allowed to bring two personnel.
Please submit the names of the individuals that will be in attendance to SrA Christopher Blackburn and Mr. Ryan Smith at 354CONS.PKA.MonitorConstruction@us.af.mil by 02:00 PM AKDT on 15 December 2025.


Questions are due no later than 03 February 2026 at 02:00PM AKDT.


All questions will be answered in the form of an amendment to the solicitation and posted to SAM.gov website.


IAW with FAR 14.202-8 Electronic bids, ONLY ELECTRONIC submissions will be accepted. Bids must be submitted via email to BOTH of the following individuals on or before 19 February 2026 at 01:00PM AKDT:


Contract Specialist: SrA Cristopher Blackburn
Contracting Officer: Mr. Ryan Smith 
Email: 354CONS.PKA.MonitorConstruction@us.af.mil 


A. The NAICS code is 238210 with a Small Business Size Standard of $19M. 
B. The magnitude for this requirement IAW FAR 36.204(f) is between $1M and $5M. 
C. See Section J for the List Attachments. 
D. Payment and Performance bonds shall be obtained IAW FAR 28.102. 
E. Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an effort for any costs.

More opportunities from Department Of Defense → FA5004 354 Cons Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS