Fuel Farm Expansion - Standby Generator
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → March Inland Port Airport Authority
NAICS
N/A
Place of Performance
Heacock Street and San Michele Road, Moreno Valley, CA, 92551Set-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
1 update
Organization & Contact Information
Show more
AgencyCalifornia → March Inland Port Airport Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → March Inland Port Airport Authority
Office AddressN/A
Contacts
Full Description
Show more
On December 17, 2025, the March Joint Powers Commission approved a scope of work by March Inland Port Airport Authority (MIPA) Engineer, C&S Companies, to design construction plans for the approved fuel farm improvements at the March Inland Port Airport, however it did not include the design of a standby power system.
In September of 2005, the Commission approved Plot Plan 04-09 and Final EIR (SCH# 200501110) for a permanent central aircraft fuel receiving, storage and distribution facility project (“fuel farm”) at the March Inland Port Airport. The approved project entitled six 105,000-gallon fuel tanks yielding 630,000 gallons of fuel. Since the approval of the project, MIPAA has installed two of the six tanks. Financial constraints restricted MIPAA’s ability to complete the project. On October 20, 2010, the Commission approved a lease with Freeman Holdings, LLC for the management of the airport fuel farm. Freeman Holdings’ lease allowed them to support MIPAA in fuel facility management, fuel sales, aircraft fueling, aircraft cleaning services, cargo services and general aviation aircraft handling. On June 11, 2025, the Commission approved a Memorandum of Understanding that allowed Freeman Holdings to proceed with installing remaining fuel farm improvements as approved. The proposed scope of work is to deliver construction plans for the remaining four 109,000-gallon API 650 field-erected aboveground storage tanks (ASTs) for the approved fuel farm.
C&S has prepared a Scope of Work to provide professional engineering services for the design of a standby power system serving the existing 600-amp, 480V/277Y electrical service at 17301 Heacock Street (SCE Meter No. 259000-015278).
The proposed standby power system will enhance the resiliency of the fuel farm during utility power outages, allowing fixed-base operator (FBO) personnel to maintain fueling operations for both military and commercial aircraft.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
