Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FUEL PUMP & METERIN

Closed
N0038324QS433Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336310
New
DIBBS
COLLAR ASSEMBLY, VALVE
Solicitation # SPE7M2-27-T-0447
Solicitation SPE7M2-27-T-0447 is a request for quotations issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of eight valve collar assemblies, identified by NSN 4820013625883. This critical application item, specifically Curtiss-Wright Electro-Mechanical part number 12575F18, is subject to a delivery window of 167 days, with a need ship date of April 26, 2027, and an original required delivery date of March 7, 2028. The contract is established as FOB Origin, with both inspection and acceptance occurring at the destination, specifically the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The procurement includes strict technical and quality requirements, prohibiting the intentional addition of mercury or mercury-containing compounds and banning the use of additive manufacturing unless specifically authorized. Packaging and marking must adhere to MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements (RP001). Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and payment. This is not a small business set-aside, and offerors must comply with the Buy American Act, the Berry Amendment, and DFARS cybersecurity reporting standards. All quotes must be submitted via the DLA Internet Bid Board System (DIBBS) by November 9, 2026.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 22 hours ago

DEADLINE

in 11 days

General Info

NAICS

336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

1

N0038324QS433.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N763.07|s4A|2156973606|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|SOURCE/SOURCE|TBD|N00383|TBD|TBD|SEE SCJEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|12|336310| ||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: #55 days after receipt of asset Attachment As and 55 days for standalones. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##000 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130, revision level "L" or latest revison, and IAW the drawing requirements. 1.2 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.2.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: FUEL PUMP & METERIN ;2910-01-605-5769; NSN , ;23089028; Part Number, Shall be performed IAW: FUEL PUMP & METERIN ;Service Publication Per the OEM and NAVAIR.; Publication (s). 1.2.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;P/N 23089028; drawing number ( ;63005; ) ;Rolls Royce; , Revision ;Latest; and all details and specifications referenced therein. 1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS REPAIR REQUIREMENTS The contractor shall repair/overhaul the FUEL PUMP & METERIN UTS to the production specifications. Rolls-Royce drawings and specifications shall be used for inspection, repair/overhaul and acceptance tested to restore the article to a Ready For Issue condition at the latest approved configuration. Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment. The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work. Acceptance testing shall be conducted under the surveillance of the DCMA(QAR).These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material. The DCMA shall retain the authority to conduct or re-conduct any tests deemed necessary to ensure compliance with the requirements of thiscontract. Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements. The contractor must perform all repairs/overhaul operations at their facility. Changes to manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval inaccordance with the Configuration Management provisions of this Statement of Work or contract. Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer. In addition, requests for approval changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manual, drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. A copy of the DD Form 250 shall be packed with each unit processed under this contract. One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer. BEYOND ECONOMICAL REPAIR (BER) An item is BER if the cost of the repair exceeds 80% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumables parts are not MOI items. Items received by the contractor missing consumables parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairing a Weapons Replaceable Assembly (WRA). A. When the contractor believes one or more SRA(s) within a WRA are either: Beyond Economical Repair (BER) or Beyond Repair (BR) i.e. the unit is not capable of being repaired because of the extent of physical damage, or Missing on Induction (MOI), the contractor shall obtain written verification from the DCMA and advice from the Inventory Manager whether a SRA may be replaced by DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: 1. Ship in place from an existing spares or repair contract, if any. 2. MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor. The detailed procedures for option 1 and 2 are set forth in section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. B. When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. OVER AND ABOVE REPAIR (OAR) An item sent to the contractor shall be considered over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. There for, repair of OAR items may be subject to equitable adjustment. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. PARTS AND MATERIAL GENERAL The contractor is responsible for supplying all parts and material necessary to perform required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any changes to such parts/material drawings or specifications requires Government approval in accordance with the configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA)(i.e. the entity responsible for maintaining the latest configuration data) for the contract item. If the contractor is the DCA, the contractor may approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specification or manufacturing source or facility are done to such drawings, specification or manufacturing source or facility are done at the contractor's own risk. If the government disapproves the requested change, the contractor shall replace any delivered item repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. PURCHASED MATERIAL CONTROL AND PARTS CONTROL The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and material purchased are in compliance with the requirements of this contract. RECEIVING INSPECTION OF PURCHASED PARTS AND MATERIAL Purchased parts and material shall (1) be inspected by the contractor upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2) the contractor shall provide, prior to the contract award, evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections shall be maintained by the contractor or subcontractor for Government review. The inspection report, shall at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such as certifications, and actual dimensional readings. 4. QUALITY ASSURANCE MANDATORY INSPECTION REQUIREMENTS: 100% Mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production or repair, mandatory inspection is required to be accomplished by the contractor as follows: 100% inspection and testing of all units shall apply. Units shall be repaired in accordance with government approved Rolls-Royce Repair manual and tested in accordance with the government approved Rolls-Royce Acceptance Test Procedure (ATP). (63005) 23084148 PMA SUGB & Rotor Module. The contractor is authorized to re-work units to correct an out of limit condition with subsequent re-test to bring the unit that fails back inside ATP limits. QUALITY ASSURANCE/QUALITY CONTROL The contractor shall maintain a quality system that addresses the elements of ISO 9001:2000 or NSI/ASQC Q9001:2000, Quality System Model for Quality Assurance in Design/Development, Production, Installation and Servicing. The contractor shall maintain a Calibration System in accordance with ANSI/NCSL Z540.1-1994 (R202). If the contractor has its own calibration system it must be submitted to the procuring activity for review. Any changes to the Calibration system will also be submitted to the procuring agency for review. The Government reserves the right to assess the contractor's compliance to its documented quality system. The quality system procedures, planning, and all other documentation, media, and data which comprise the quality system shall be made available to the government for their review and use. The acceptance be made available to the government for their review and use. The acceptance of non-conforming supplies is a prerogative of and shall be as prescribed by the government. The government reserves the right to disapprove the quality system or portions thereof when it fails to meet its intended objectives. PRODUCTION CONFIGURATION INSPECTION (PCI): The contractor shall support a PCI conducted by NAVSUP, NAVAIR. This inspection will review the product build records and build data as required. The government representatives (not to exceed 12 persons) will witness the performance of the Acceptance Test Procedures (ATP) and resulting data used to assess the product as acceptable for shipment or rejection. Witness of the ATP may be waived by the government dependent on production timing with the desired date of the PCI, but the ATP data will still be reviewed. The government shall provide a notice of at least 30 days to the contractor for the first article inspection. It is desired to have the inspection on a production unit to be delivered under this contract. The government may also accept an article for use for the PCI from another contract so long as the part number is the same, and the government approves the use of said article. This PCI shall not exceed 1 business day in the use of said article. This PCI shall not exceed 1 business day induration. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation NO0383-26-Q-AA77, issued by NAVSUP Weapon Systems Support, seeks a contractor to provide repair, overhaul, and modification services for electrical control panels (NSN 6110-01-433-5020). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return units to a Ready For Issue condition. Key technical requirements include adherence to MIL-STD-130 for markings, the prohibited use of MIL-W-81381 wire in favor of SAE-AS22759, and compliance with ISO 9001/SAE AS9100 quality standards. The scope includes strict protocols for handling items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and the Procuring Contracting Officer. The government intends to make a single award based on a trade-off between price and past performance, with past performance weighted as the more important factor. Deliveries are expected within 90 days, with Repair Turnaround Time measured from asset return to acceptance at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific requirements for electrostatic protection and Depot Level Repairable labeling. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. The resulting contract will be a DO rated order certified for national defense.
Motor and Generator Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
CABLE ASSEMBLY,ROTA
Solicitation # N0038327QAA18
This fixed-price solicitation, issued by Navsup Weapon Systems Support Philadelphia, is for the overhaul, upgrade, repair, testing, and inspection of the Cable Assembly, ROTA (NSN 1680-01-661-7957, Part Number 5217008-110). The primary objective is to return these assets to a Ready For Issue (RFI) condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, with a specific prohibition against using MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. The contract includes a one-year induction period from the date of award, after which any assets received require bilateral agreement for repair. Performance is governed by strict quality and timing requirements, including a defined Repair Turnaround Time (RTAT) and throughput constraints. The contractor must maintain a quality system conforming to ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and the adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. Award evaluation will prioritize past performance as the primary factor, followed by price as the secondary factor, with the government utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336412
New
Federal
GUARD,GASOLINE ENGI
Solicitation # N0038327QTA11
Solicitation N0038327QTA11, issued on October 8, 2026, by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of a Gasoline Engine Guard, identified by NSN 2810-01-737-5535. The government intends to make a single award to a responsible offeror based on a best-value determination where past performance is considered more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System to assign color ratings, while price serves as a secondary factor. Quotations are due by November 9, 2026, and the required delivery period is 90 days FOB Destination to the DLA Distribution New Cumberland facility in Pennsylvania. The contract mandates strict adherence to military standards for packaging and marking, specifically MIL-STD-2073-1 and MIL-STD-129, with specific requirements for domestic and overseas shipments. Contractors must comply with cybersecurity standards outlined in NIST SP 800-171 and DFARS 252.204-7012. Quality management compliance with ISO 9001 or SAE AS9100 is required, and inspection and acceptance will occur at the origin. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment, and compliance with the Buy American and Balance of Payments Program. Offerors must also provide hazardous material certifications and safety data sheets if applicable.
Aircraft Engine and Engine Parts Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 334511
New
Federal
66--INDICATOR,ATTITUDE, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QBB18
This solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, is a Request for Quotations for the repair, overhaul, upgrade, and inspection of 33 Attitude Indicators (NSN 6610-01-101-1927 LC, P/N 622-3374-002). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in operational environments. The contract includes an initial induction period of 365 calendar days, which the government may extend by an additional year. Offerors must provide option pricing for a maximum of 135 units over the total contract period. Award will be granted to the offeror with the lowest price technically acceptable quote, with past performance evaluated via the DoD Supplier Performance Risk System. The contractor is responsible for providing all labor, facilities, materials, and tooling, as government-furnished manufacturing aids are not provided. Key technical requirements include compliance with ISO 9001 or SAE AS9100 quality systems and calibration standards such as ANSI/NCSL Z540.3 or ISO-10012-1. Specific prohibitions are in place regarding the use of MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead. The contract establishes strict protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are FOB Destination with a 90-day delivery window, and all packaging must adhere to MIL-STD-2073 and MIL-STD-129 standards. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 336320
New
Federal
CONTROL,ELECTRIC LI
Solicitation # N0038326QAA79
Solicitation N0038326QAA79, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the teardown, evaluation, repair, and modification of the Control, Electric L1 (NSN 7RH 6220-01-435-0198KB, P/N 712860-1). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids such as fixtures or special test equipment. All work must be performed in accordance with the most recent technical publications and approved repair manuals, with specific prohibitions against the use of MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. The contractor must maintain a rigorous quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key requirements include the maintenance of detailed historical record files for each serial number and the submission of all failure analysis and corrective action reports to the government. While the contractor is granted Internal Review Board authority for minor non-conformances, formal Material Review Board authority for as-is dispositions remains with the government. Award will be made to a single offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important. Deliveries are FOB Destination, and all items must be preserved and packaged according to MIL-STD-2073-1.
Motor Vehicle Electrical and Electronic Equipment Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334511
New
Federal
66--PROCESSOR,FLIGHT IN, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QBB19
Solicitation N0038326QBB19, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the teardown, evaluation, repair, and modification of Flight Processors (NSN 6610-01-622-1414). The contract covers a maximum of 30 units over a potential two-year period, with a delivery requirement of 90 days and FOB Destination terms. Award will be based on Lowest Price Technically Acceptable criteria, though past performance is noted as more important than price. Because the item is flight critical, government source approval is mandatory prior to award. The contractor is responsible for providing all labor, materials, and tooling necessary to return units to Ready For Issue condition, as the government will not provide manufacturing aids. Strict quality standards are mandated, including compliance with ISO 9001 or SAE AS9100 and calibration standards such as ANSI/NCSL Z540.3. Key technical requirements include the prohibition of MIL-W-81381 wire in favor of SAE-AS22759 and adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. The contractor must maintain comprehensive quality control documentation and historical record files for each serial number, with formal Material Review Board authority for as-is dispositions retained by the government.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA84
Solicitation N0038326QAA84, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the repair, overhaul, and upgrade of electrical control panels (NSN 6110-01-472-3531). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return assets to a Ready For Issue condition, as the government will not provide manufacturing aids or special test equipment. Key technical requirements include adherence to MIL-STD-130 for markings, MIL-STD-2073 for packaging, and a strict prohibition on the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The required repair turnaround time is 100 days after receipt of the asset. The government will make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risk. Contractors must maintain a quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. The contract includes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both requiring written concurrence from DCMA. Invoicing and receiving reports must be processed through Wide Area Workflow, with final inspection and acceptance occurring at the contractor's location.
Motor and Generator Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA83
Solicitation NO0383-26-Q-AA83, issued by NAVSUP Weapon Systems Support, is a request for quotations for the teardown, evaluation, repair, and modification of Electrical Control Panels (NSN 6110-01-472-3513). The objective is to return these units to a Ready For Issue condition through a process of inspection, component replacement, and testing. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Key technical constraints include a strict prohibition on MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead, and adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. The contract establishes a Repair Turnaround Time of 80 days after receipt of assets, with an induction expiration date set for 365 days after award. Performance is governed by high quality standards, requiring a quality management system compliant with ISO 9001/SAE AS9100 and calibration systems meeting ANSI/NCSL Z540.3 or ISO-10012-1. The government utilizes a specific process for Beyond Economical Repair and Missing on Induction determinations, requiring written concurrence from DCMA. Award will be made to a single, technically acceptable offeror based on the most advantageous combination of price and past performance, with past performance weighted as the more important factor.
Motor and Generator Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
16--NVG,HUD CONVERTER,A, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QQB47
Solicitation NO0383-26-Q-B47, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the teardown, evaluation, repair, and modification of the NVG HUD Converter A (NSN 7RH 1680 014956018 V2). The contractor is responsible for providing all labor, facilities, materials, and tooling necessary to return these units to a Ready for Issue condition. Key technical requirements include strict adherence to MIL-STD-130 for markings, the mandatory use of SAE-AS22759 series wire in place of prohibited MIL-W-81381 wire, and compliance with ISO 9001/SAE AS9100 quality standards. All work must be performed at the identified contractor facility, and any changes to repair manuals or sources require approval from the Procuring Contracting Officer. The contract establishes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are expected within 90 days, with inspection and acceptance occurring at the origin. Packaging must conform to MIL-STD-2073-1 and ANSI/ESD S20.20-2021 for electronic protection. Award will be made to a single, technically acceptable offeror based on an evaluation of technical capability and past performance risk via the Supplier Performance Risk System. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 29 days
View Details
NAICS: 336413
New
Federal
16--PREAMP,MAS, IN REPAIR/MODIFICATION OF
Solicitation # N0038326RBA54
This solicitation, issued by Navsup Weapon Systems Support in Philadelphia, seeks a contractor to perform the overhaul, upgrade, repair, testing, and inspection of eight PREAMP,MAS units (P/N 5798-8000-001) to return them to a Ready for Issue condition. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids or test equipment. Work must be performed in accordance with Undersea Sensor Systems drawing 5798-8000-001 and ISO 9001 quality standards. The contract specifies a Repair Turnaround Time of 150 days after receipt of the asset, with an induction expiration date set at 365 days after the award date. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Key administrative requirements include the use of the Wide Area WorkFlow system for invoicing and the adherence to MIL-STD-2073-1 for packaging and MIL-STD-129 for marking. The contract incorporates several critical FAR and DFARS clauses, including the Buy American and Balance of Payments Program and specific requirements for safeguarding sensitive conventional arms and explosives. Special provisions are included for handling items that are Beyond Economical Repair or Missing on Induction, requiring written concurrence from DCMA and the Procuring Contracting Officer.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS