This Government Contract opportunity from Texas was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Full-Depth Pavement Reconstruction – Milling & Asphalt Paving
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract entails the complete reconstruction of Black Forest Road, focusing on removing six inches of the existing pavement layer through milling, followed by essential base preparation and proof rolling to ensure a stable foundation. The process includes applying a tack coat to promote proper adhesion between layers before placing a new asphalt overlay. The overlay consists of two distinct asphalt layers: four inches of Type B and two inches of Type D Hot Mix Asphalt (HMA), providing a durable and robust road surface suitable for heavy traffic and long-term use. Scheduled under a subcontract with Hays County, Texas, this project falls within the NAICS code 237310, which concerns highway, street, and bridge construction. The solicitation was posted on May 14, 2026, with a response deadline of June 8, 2026, at 6:00 PM. The procurement is managed through Texas SmartBuy, and additional details are available via the provided online link. While exact location details within the county are unspecified, the project's scope and technical requirements ensure comprehensive pavement reconstruction meeting state and local standards.
General Info
Agency
NAICS
Place of Performance
TX, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
