This Solicitation opportunity from Oregon was posted on May 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract titled "Fulton Pump Mains Replacement" involves constructing water improvements along SW Chestnut Street, SW 5th Avenue, and SW Nevada in Portland, Oregon. The project aims to replace or upgrade existing pump mains to enhance water infrastructure reliability and capacity. The solicitation was posted on May 16, 2025, with a response deadline of June 12, 2025, and the contract value is estimated to be between five and ten million dollars. The project is managed by the City of Portland Construction under the Oregon agency, with Ryan Nelson serving as the primary contact for inquiries. Bidders interested in participating can find additional details and submit responses through the city's procurement portal.
HighAI Summary for Bid 00002572: Fulton Pump Mains Replacement Project: Invitation to Bid (ITB) for the Fulton Pump Mains Replacement Project (Project #W02107) for the Portland Water Bureau. The document includes general bidding requirements, instructions to bidders, and a checklist of mandatory submissions. Bids are due by June 12, 2025, at 2:00 PM. A mandatory pre-bid meeting is scheduled for May 29, 2025.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond Form - Fulton Pump Mains Replacement Project (Bid No. 00002572): A fillable bid bond form for the City of Portland regarding the Fulton Pump Mains Replacement Project (Bid No. 00002572). The document outlines the legal obligations of the Principal and Surety to ensure the contract is entered into and bonds are furnished if the bid is awarded.
XLSX
XLSX, High priority: read this firstrfb
HighAI Summary for Bid Number 00002572 - Fulton Pump Mains Replacement: Bid form for the City of Portland, Oregon Water Bureau, project number 00002572, regarding the Fulton Pump Mains Replacement. The document contains a detailed bid schedule with 69 line items for labor and materials, including mobilization, excavation, pipe installation, and restoration, requiring unit pricing from the bidder.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fulton Pump Mains Replacement Appendix I - Construction Signage: Appendix I regarding construction signage for the Fulton Pump Mains Replacement project, issued by the Portland Water System.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fulton Pump Mains Replacement Appendix J - As-Builts: Technical appendix containing as-built drawings and specifications for existing 10 and 12 inch mains for the Fulton Pump Mains Replacement project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fulton Pump Mains Replacement Appendix J - As-Builts: This document is Appendix J, containing as-built records and historical computations for the Portland, Oregon Water Department. It includes technical data regarding the Burlingrine Force Division, specifically detailing excavation, pipe dimensions (10-inch and 12-inch), and material specifications for existing mains.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fulton Pump Mains Replacement - ESA Phase I (W02107): Environmental Level 1 records search memorandum dated 6/28/19 for the Fulton Pump Mains Replacement project (W02107). The document identifies Recognized Environmental Conditions (REC) and Environmental Features of Concern (EFOC) along the project alignment to assess risks of contaminated media during excavation. It includes search results from federal (CERCLIS, NPL, Envirofacts) and state (DEQ, OSFM) databases, specifically noting several closed leaking underground storage tank (LUST) sites involving heating oil.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fulton Pump Mains Replacement - Geotechnical Investigation Report: Geotechnical Investigation Report (Revision 0, dated September 27, 2019) for the Fulton Pump Mains Replacement Project in Southwest Portland, Oregon. Prepared by McMillen Jacobs Associates for the Portland Water Bureau, the document provides subsurface site investigations, seismic and geologic hazard evaluations, and specific design and construction recommendations for a new 20-inch ductile iron pump main, including open-cut and trenchless crossing methods.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for W02107.DC Fulton Pump Mains Replacement - Coring Report: A technical coring report for the Fulton Pump Mains Replacement project (W02107.DC) by the Portland Water Bureau. Dated October 11-14, 2019, the document details pavement thickness, base materials, and subgrade descriptions for multiple core samples at various locations, including SW Terwilliger Blvd and SW Nevada St.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for W02107 Fulton Pump Mains Replacement - Environmental Sampling and Analysis: Dated 11/25/2019, this memorandum details the results of environmental soil sampling and analysis for the Fulton Pump Mains Replacement project (W02107). It characterizes soil contaminants (metals, hydrocarbons, PAHs) to determine disposal requirements and worker PPE. Findings indicate that excavation spoils from a specific 100-linear-foot area between SW Nevada St./SW 2nd Ave. and SW Barbur Blvd. must be disposed of at a Subtitle-D landfill. All other results were below screening values for worker exposure.
PDF
PDF, Low priorityspecifications
LowAI Summary for Fulton Pump Mains Replacement Appendix F - ER Inspection Form: An Erosion and Sediment Control Inspection Report form for the Portland Water Bureau's Fulton Pump Mains Replacement project. It provides a standardized checklist and table for documenting BMP effectiveness, weather conditions, and corrective actions for erosion control.
PDF
PDF, Low priorityother
LowAI Summary for Fulton Pump Mains Replacement Appendix G - Construction Notification Letter: A template for a public involvement construction notification letter for the Fulton Pump Mains Replacement project. The document provides multilingual notices to residents regarding work schedules, parking limitations, and potential traffic delays, and includes placeholders for contractor contact information.
PDF
PDF, Low priorityspecifications
LowAI Summary for Fulton Pump Mains Replacement Appendix H - Lawn Sign: Appendix H provides the design and multilingual text for public involvement lawn signs to be used during the Fulton Pump Mains Replacement construction project.
PDF
PDF, Low priorityspecifications
LowAI Summary for Fulton Pump Mains Replacement Appendix J - As-Builts: Appendix J containing as-built documentation and record forms for the Water Department in Portland, Oregon, specifically related to the Fulton Pump Mains Replacement project (Job No. 1912).
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Fulton Pump Mains Replacement - Bidder Confidentiality Agreement: A non-disclosure agreement between the City of Portland Water Bureau and potential bidders for the Fulton Mains Replacement Project. It outlines the obligations of the bidder to protect confidential information regarding asset size, material, and location to ensure public health and safety, and provides instructions for submission via email to obtain access to project documents.