Fulweiler to Garfield Pipeline Replacement Project

Closed
2026-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 7 hours ago

DEADLINE

in about 18 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 7 hours ago

DEADLINE

in about 18 hours

AI Contract Overview

Show more

The contract involves the construction and completion of a new water main in Auburn, California, according to plans prepared by Hazen and Sawyer. The project includes installing 143 linear feet of ductile iron pipe on Fulweiler Avenue, 126 linear feet of ductile iron pipe encased in a 24-inch steel casing crossing Highway 49, and 1,163 linear feet of PVC pipe along a private alley and Garfield Street. The scope covers the provision of all labor, materials, taxes, equipment, and services needed to complete the work, which also entails night work within the Caltrans right-of-way, installation of 12 private service connections, a new hydrant, valving, abandonment or removal of old piping, and final pavement restoration. This solicitation, titled "Fulweiler to Garfield Pipeline Replacement Project," is issued by the Placer County Water Agency in California and was posted on May 19, 2026. Interested parties must submit their responses by June 22, 2026. The agency’s primary contact for the project is Stephanie Wens, available via phone or email for inquiries. The contract is open to public solicitation without any specified set-aside status, and more information and bid details can be accessed through the agency’s public purchase portal.

General Info

Construct and complete water main pipeline in Auburn, CA, including pipes, connections, night work, restoration.

Documents

1

Fulweiler to Garfield Pipeline Replacement Final Design Contract 2026-02

PDF, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Project Description: In accordance with plans and specifications prepared by Hazen and Sawyer, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of a new water main in Auburn, California. The new main will include 143 linear feet of ductile iron pipe in Fulweiler Avenue, 126 linear feet of ductile iron pipe encased in a 24-inch steel casing through Highway 49, and 1,163 linear feet of PVC pipe down a private alley and in Garfield Street. The work includes nightwork for work within the Caltrans right-of-way, 12 private service connections, installation of a new hydrant, valving, removal and/or abandonment of old pipe, and final pavement.

More opportunities from California → Placer County Water Agency

Same awarding agency

NAICS: 237990
New
SLED
On-Call Canal Gunite Installation
Solicitation # 2026-07
Solicitation 2026-07 is an on-call contract issued by the Placer County Water Agency for the installation of canal gunite throughout Placer County, specifically within Zones 1 and 3. The scope of work requires the contractor to provide all labor, materials, equipment, and services to furnish, mix, and place gunite using a dry-mix process in accordance with ASTM C33 standards. The contract has an estimated maximum value of 2,000,000 dollars and a performance period running through December 31, 2027, with a sole option for the agency to extend the term through December 2028. Payment is based on the cubic yardage of gunite measured in place, with undisputed progress payments issued within 30 days of receipt. The contract will be awarded to the lowest responsive and responsible bidder. To qualify, bidders must provide evidence of a valid California Contractor's License and DIR registration, as well as a record of integrity and successful project completion. Mandatory experience requirements include listing three to six qualifying dry-mix process gunite projects completed since 2020, at least two of which must be public works projects contracted directly with a public entity. Bidders must also submit a non-collusion affidavit, a drug-free workplace certification, and compliance documentation for the California Air Resources Board. Successful awardees are required to provide faithful performance and payment bonds, each for 100 percent of the contract price. The project is subject to prevailing wage requirements per California Senate Bill 854 and must comply with the Americans with Disabilities Act. Bids must be submitted in sealed envelopes to the Placer County Water Agency Engineering Division in Auburn, California, by 3:30 P.M. local time on November 5, 2026.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS