This Solicitation opportunity from Florida was posted on July 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Furnish Install 8-Inch Pvc C900 Dr 14 Force Main Along Crandon Blvd. From List Station Ps-0138 To Kn
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the comprehensive installation of approximately 2,019 linear feet of 8-inch PVC C900 DR18 pipe and associated ductile iron fittings to establish a sewage force main in the specified area of Key Biscayne, Florida. The scope includes obtaining all necessary permits prior to commencing work, as well as mobilization and demobilization activities. Key tasks encompass installing five plug valves, mechanical joint restraints, and making critical connections such as a tapping connection with a stainless steel sleeve and valve, along with two additional cut-in connections to existing mains. The contractor is responsible for constructing automatic air release valve assemblies, applying polyethylene encasement for ductile iron components, and ensuring proper sheeting and shoring as directed by the Engineer. The project also involves cleaning, testing, and dewatering the mains, along with the removal and salvage of existing infrastructure components like valve boxes, manhole covers, and pavement materials, which must be transported and disposed of legally. Additional work includes replacing damaged pavement, sidewalks, landscaping, and traffic loop detection systems, as well as restoring all disturbed surfaces to ensure a fully functional and compliant installation. Traffic control measures are required throughout the project to maintain safety and minimize disruption. The project is valued between $500,000 and $1,000,000 and is overseen by Miami Dade County Strategic Procurement, with a primary contact being Contracting Officer Kristina L. Peart. The contract aims to deliver a complete, operational sewage force main system with all ancillary work, ensuring compliance with all relevant permits, safety standards, and project specifications. The solicitation was posted on July 3, 2025, with a response deadline of July 24, 2025.
General Info
Place of Performance
FL, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
