Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Future Installation & Integration Services (Potential Change Order Work)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity for the Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with OSHA and EPA regulations, national building codes, and Indiana state laws, with Indiana regulations taking precedence if they are more stringent. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bidders must submit a single lump sum proposal with a detailed cost breakdown for labor, materials, and equipment, along with a timeline for substantial completion. A mandatory site visit was required on November 10, 2026, with a response deadline of November 20, 2026. Award will be based on best value, evaluated by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Required submissions include a completed SF 1413, Vendor Questionnaire, W9, proof of a valid Indiana Contractor's License, and certification of compliance with Davis Bacon Act wage rates. The contractor must maintain general liability insurance of at least 1 million dollars per occurrence and automobile liability coverage. Payment terms are Net 30. The contractor is required to provide a one-year guarantee of workmanship and all applicable manufacturer warranties upon substantial completion of the project.
Atterbury Job Corps. – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting at its center in Minot, North Dakota. The project focuses on correcting deficiencies identified in the 2026 Facility Survey, specifically within the mechanical and electrical rooms of Building 26 (Female Dormitory) and Building 27 (Single Parent Dormitory). The scope of work requires the contractor to provide all labor, materials, and supervision to install LED emergency/exit light fixtures and directional markings in accordance with NFPA 70 (National Electrical Code) and NFPA 101 (Life Safety Code). This solicitation is set aside for Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Bidders must submit a detailed, itemized quotation using the provided bid sheet, along with a current insurance certificate and any applicable state or trade licenses. Compliance with the Davis-Bacon Act regarding prevailing wages and fringe benefits is mandatory. A bond is required for any proposal exceeding 150,000 dollars. Proposals must be submitted to Leana Leavitt by December 4, 2026, at 4:00pm CST, with a scheduled site walk-through on November 23, 2026. Payment terms are Net 30 following service verification and invoice receipt.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections, installing standardized external oil sampling devices to improve safety, and conducting oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems to ensure positive pressure is maintained to prevent oil oxidation and moisture intrusion. Key deliverables include annotated infrared images, written condition assessment reports for each asset, comprehensive standard operating procedures, and on-site training for up to 20 agency staff members. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. This is a fixed-price contract with a not-to-exceed total price, intended as a single award to the most capable and cost-effective offeror. Qualified bidders must have completed at least two similar projects in the last five years, including at least one for a utility or industrial facility. Proposals are due by December 23, 2026, via the PlanetBids portal and must include a detailed staffing plan, methodology, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. Performance will take place across multiple agency locations, including sites in Ontario, Chino, and Rancho Cucamonga. The agency requires electronic invoicing and payment via ACH, with a standard 30-day approval process.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Eastern Municipal Water District's Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and the Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supplies. Bids must be submitted by 2:00 PM on November 18th, with a final deadline of November 19th, to be considered responsive. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and must adhere to the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 1 million dollars for General Liability per occurrence, 2 million dollars for Aggregate and Completed Operations, 5 million dollars for Excess Liability, 1 million dollars for Auto Liability, and 1 million dollars for Workers Compensation and Employer Liability. Evaluation will prioritize SBE/DBE participation, including any lower-tier participation provided in the quote. Primary points of contact for the solicitation are Lead Estimator Ryan Falk and Amy Roller.
Axia Electric

POSTED

about 4 hours ago

DEADLINE

in 1 day
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, repairing, and certifying emergency lighting systems in accordance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the integration of fixture data and test results into the facility's Computerized Maintenance Management System (CMMS) and the establishment of an automated 30-day functional testing schedule. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Award decisions will be based on overall best value. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wages and FAR clauses regarding small business utilization, contractor whistleblower rights, and security requirements. Contractors must comply with Executive Order 13706 regarding paid sick leave and provide proof of insurance before commencing work. Final acceptance and payment are contingent upon a substantial completion inspection and the resolution of a final punch list.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation (MTC), acting as the operator for the Joliet Job Corps in Illinois, is soliciting bids for a fixed-price, single lump sum subcontract to replace a water-damaged 30KVA, 480V primary, 120/208V secondary transformer. The scope of work includes pre-work coordination, implementing OSHA-compliant lockout/tagout procedures, removing and disposing of the damaged unit according to environmental regulations, and installing a replacement transformer on a structurally adequate elevated support platform anchored to the building. The project is designated for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bids are due by November 25, 2026, and must include a detailed cost breakout on company letterhead, proof of insurance, three references, and the completed MTC Supplier Packet. The contract requires strict adherence to Construction Wage Rate Requirements, necessitating the payment of prevailing wages and fringe benefits as specified in Wage Determination IL20260008. Award is based on overall best value. Once a Notice to Proceed is issued, work must begin within five business days and be completed within 60 consecutive business days, with liquidated damages of $100 per day for delays. For bids equal to or exceeding $25,000, a bid bond of 20% and subsequent performance and payment bonds from an A- rated surety are required. Payment is processed via AIA documents, with a 10% retainage withheld until substantial completion. Final acceptance is contingent upon a joint inspection and the resolution of a punch list, and the contractor must provide a one-year guarantee for workmanship.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 8 days
NAICS: 238210
New
SLED
Installation of EV Chargers for the Electric Bucket Truck
Solicitation # CS 11-26-01
Alameda Municipal Power is soliciting bids from qualified C-10 electrical contractors for the installation of two electric vehicle chargers at the AMP Service Center parking lot to support a 2022 International eMV607 SBA electric bucket truck. The project involves installing one InCharge ICE-30 Level-3 DC fast charger and one InCharge ICE-80 Level-2 AC charger, both of which will be supplied by AMP. The scope of work includes installing a 100 Amp 3-pole 480-volt circuit breaker, approximately 150 feet of EMT conduit, a 60-amperage 600-volt Nema 3r safety switch, and one protective bollard for the Level-3 charger, as well as a 50 Amp 250-volt breaker and approximately 70 feet of EMT conduit for the Level-2 charger. All work must be completed within 90 calendar days from the Notice to Proceed, with a mandatory site visit required by November 16, 2026. The contract will be awarded as a total lump sum to the lowest responsible bidder, with preference given to local Alameda businesses. Bidders must be registered with the Department of Industrial Relations and adhere to California prevailing wage laws. Required submission documents include a Statement of Qualifications, Non-Collusion Declaration, Subcontractor List, and bid security equal to 10 percent of the maximum bid. For projects exceeding 25,000 dollars, performance and payment bonds for 100 percent of the contract price are required. Bids must be submitted electronically via the OpenGov Procurement portal by November 19, 2026. Additionally, corporate officers or owners performing the work may submit a Certificate of Exemption under Labor Code 3352 in lieu of a workers compensation policy if the company has no employees.
Support Services

POSTED

about 11 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This subcontract opportunity involves potential future work for the installation and integration of electric vehicle chargers. The scope of services includes comprehensive site preparation, the establishment of electrical connections, and the technical integration of the charging systems with PowerFlex software. The solicitation was posted on September 25, 2025, with a response deadline of October 9, 2025. This project is associated with the California Water and Power Department Warehouse and falls under NAICS code 238210.

General Info

Agency

California → Water & Power Department, Warehouse

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-Plan-0499.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tritium RTM75 (50kW) DC Fast Chargers

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
  • Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Water & Power Department, Warehouse
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Water & Power Department, Warehouse
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Potential future work for installation and integration of EV chargers, including site prep, electrical connections, and system integration with PowerFlex software.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS