FY 2027 Park Street Drainage Repair Project

Active
PE-66204-NONST-2027-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FY 2027 Park Street Drainage Repair Project, issued by the City of Walnut Grove, involves two primary scopes of work to be completed by November 15, 2026. The first component is the replacement of a damaged CMP culvert under Industrial Parkway with a 30 inch RCP culvert, following GDOT specifications and the GDOT 1401 paving detail. This installation requires a 12 inch foundation backfill, GDOT Safety Flared End Sections, and a relocation of the culvert two feet further from the edge of Park Street. The second component involves regrading and stabilizing multiple eroded ditch sections along Park Street within the 60 foot right-of-way, specifically from Leone Avenue to Walton Court and the loop connecting Park Street, Green Avenue, and Walton Court. These ditches must feature a two foot flat bottom and appropriate side slopes, with the contractor remaining responsible for the project until an 85 percent stand of permanent grass is achieved. The project requires strict adherence to environmental and safety standards, including the daily use of BMPs for stabilization and coordination with 811 for utility conflicts. Work hours are restricted to 7 AM to 7 PM Monday through Friday, with limited Saturday availability and no work permitted on City holidays or Halloween. The City will award the contract based on the best value, considering bid price, experience with similar projects, and knowledge of Walnut Grove. Awardees must provide a performance-payment bond for 100 percent of the base bid and maintain comprehensive insurance coverage, including general liability, worker's compensation, and auto insurance. Proposals must be emailed to the project engineer, Aaron Wadley of Terra Via Engineering, and include a fee proposal, qualifications, three references, and a list of subcontractors.

General Info

City of Walnut Grove drainage repair: culvert replacement and ditch stabilization by November 2026.

Agency

Georgia → City of Walnut GroveView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

FY 2027 Park Street Drainage Repair Project - Invitation to Quote

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Walnut Grove
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Walnut Grove
View Agency Profile
Office AddressN/A
Contacts
Joseph Morris

Full Description

Show more
1.Replacement of CMP culvert under Industrial Parkway a.Contractor will follow GDOT specifications to replace a damaged culvert under Industrial Pkwy. b.Contractor must use RCP and the culvert size will be increased to 30¿ c.Culvert will be placed on a minimum of 12¿ of foundation backfill. d.Culvert will receive GDOT Safety Flared End Sections e.Head and tail ditch to be excavated to match new culvert f.Culvert to be relocated 2¿ further away from the edge of Park Street. g.Culvert to be backfilled with 57 stone and or compacted GAB within 6¿ of finished grade. Final 6¿ to be paved, following GDOT 1401 detail. h.Industrial Pkwy may be closed to traffic during culvert replacement for up to 3days. i.City will assist with Walton EMC coordination. j.Contractor must call 811 and coordinate any other utility conflict resolutions. 2.Regrade and stabilize multiple ditch sections along Park Street (60¿ ROW) a.Contractor to excavate and/or fill eroded ditch sections along both sides of Park Street. All work to be inside of public right-of-way or with signed right-of-entry, acquired by the City. b.All areas to be stabilized at the end of each day with BMPs, which may include temporary cover and matting, ditch checks, or other erosion control BMPs. c.All ditches impacted must receive 2¿ flat bottom and appropriate side slopes, graded and compacted to minimize long-term erosion. d.All driveway culverts will be fully exposed and sedimentation removed. e.All Ditches to receive at least matting, grassing, and fertilization. If off-season or temporary grasses used, contractor will be required to regerminate warm-weather grass. f.Contractor will be responsible for the project until 85% stand of permanent grass. g.Sod matching adjacent yard will be utilized over any disturbed area greater than4¿ from the edge of the bottom of the ditch. h.Sod may be used in the ditch but must be staked. i.Approximate areas of particular concern are noted below but are not exhaustive.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Georgia → City of Walnut Grove

Same awarding agency

NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
Highway, Street, and Bridge Construction

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS