Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY 2027 Park Street Drainage Repair Project

Closed
PE-66204-NONST-2027-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours

AI Contract Overview

Show more

The FY 2027 Park Street Drainage Repair Project, issued by the City of Walnut Grove, involves two primary scopes of work to be completed by November 15, 2026. The first component is the replacement of a damaged CMP culvert under Industrial Parkway with a 30 inch RCP culvert, following GDOT specifications and the GDOT 1401 paving detail. This installation requires a 12 inch foundation backfill, GDOT Safety Flared End Sections, and a relocation of the culvert two feet further from the edge of Park Street. The second component involves regrading and stabilizing multiple eroded ditch sections along Park Street within the 60 foot right-of-way, specifically from Leone Avenue to Walton Court and the loop connecting Park Street, Green Avenue, and Walton Court. These ditches must feature a two foot flat bottom and appropriate side slopes, with the contractor remaining responsible for the project until an 85 percent stand of permanent grass is achieved. The project requires strict adherence to environmental and safety standards, including the daily use of BMPs for stabilization and coordination with 811 for utility conflicts. Work hours are restricted to 7 AM to 7 PM Monday through Friday, with limited Saturday availability and no work permitted on City holidays or Halloween. The City will award the contract based on the best value, considering bid price, experience with similar projects, and knowledge of Walnut Grove. Awardees must provide a performance-payment bond for 100 percent of the base bid and maintain comprehensive insurance coverage, including general liability, worker's compensation, and auto insurance. Proposals must be emailed to the project engineer, Aaron Wadley of Terra Via Engineering, and include a fee proposal, qualifications, three references, and a list of subcontractors.

General Info

City of Walnut Grove drainage repair: culvert replacement and ditch stabilization by November 2026.

Documents

1

FY 2027 Park Street Drainage Repair Project - Invitation to Quote

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Walnut Grove
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Joseph Morris

Full Description

Show more
1.Replacement of CMP culvert under Industrial Parkway a.Contractor will follow GDOT specifications to replace a damaged culvert under Industrial Pkwy. b.Contractor must use RCP and the culvert size will be increased to 30¿ c.Culvert will be placed on a minimum of 12¿ of foundation backfill. d.Culvert will receive GDOT Safety Flared End Sections e.Head and tail ditch to be excavated to match new culvert f.Culvert to be relocated 2¿ further away from the edge of Park Street. g.Culvert to be backfilled with 57 stone and or compacted GAB within 6¿ of finished grade. Final 6¿ to be paved, following GDOT 1401 detail. h.Industrial Pkwy may be closed to traffic during culvert replacement for up to 3days. i.City will assist with Walton EMC coordination. j.Contractor must call 811 and coordinate any other utility conflict resolutions. 2.Regrade and stabilize multiple ditch sections along Park Street (60¿ ROW) a.Contractor to excavate and/or fill eroded ditch sections along both sides of Park Street. All work to be inside of public right-of-way or with signed right-of-entry, acquired by the City. b.All areas to be stabilized at the end of each day with BMPs, which may include temporary cover and matting, ditch checks, or other erosion control BMPs. c.All ditches impacted must receive 2¿ flat bottom and appropriate side slopes, graded and compacted to minimize long-term erosion. d.All driveway culverts will be fully exposed and sedimentation removed. e.All Ditches to receive at least matting, grassing, and fertilization. If off-season or temporary grasses used, contractor will be required to regerminate warm-weather grass. f.Contractor will be responsible for the project until 85% stand of permanent grass. g.Sod matching adjacent yard will be utilized over any disturbed area greater than4¿ from the edge of the bottom of the ditch. h.Sod may be used in the ditch but must be staked. i.Approximate areas of particular concern are noted below but are not exhaustive.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS