This Solicitation opportunity from Georgia was posted on September 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FY 2027 Park Street Drainage Repair Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The FY 2027 Park Street Drainage Repair Project, issued by the City of Walnut Grove, involves two primary scopes of work to be completed by November 15, 2026. The first component is the replacement of a damaged CMP culvert under Industrial Parkway with a 30 inch RCP culvert, following GDOT specifications and the GDOT 1401 paving detail. This installation requires a 12 inch foundation backfill, GDOT Safety Flared End Sections, and a relocation of the culvert two feet further from the edge of Park Street. The second component involves regrading and stabilizing multiple eroded ditch sections along Park Street within the 60 foot right-of-way, specifically from Leone Avenue to Walton Court and the loop connecting Park Street, Green Avenue, and Walton Court. These ditches must feature a two foot flat bottom and appropriate side slopes, with the contractor remaining responsible for the project until an 85 percent stand of permanent grass is achieved. The project requires strict adherence to environmental and safety standards, including the daily use of BMPs for stabilization and coordination with 811 for utility conflicts. Work hours are restricted to 7 AM to 7 PM Monday through Friday, with limited Saturday availability and no work permitted on City holidays or Halloween. The City will award the contract based on the best value, considering bid price, experience with similar projects, and knowledge of Walnut Grove. Awardees must provide a performance-payment bond for 100 percent of the base bid and maintain comprehensive insurance coverage, including general liability, worker's compensation, and auto insurance. Proposals must be emailed to the project engineer, Aaron Wadley of Terra Via Engineering, and include a fee proposal, qualifications, three references, and a list of subcontractors.
General Info
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
