Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

FY2 7-09 Asbestos Containing Material ( ACM ) Flooring Demo and Abatement Project 3213 Moccasin Run, Inchelium, WA 99138

Open
FY27-09State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

3213 Moccasin Run, Inchelium, WA 99138, Inchelium, WA, 99138

Set-Aside

NONE

Documents

1
PDF

Read the document

Due in 28 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Due in 28 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • Buyer contactPhone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConfederated Tribes of the Colville Reservation → Colville Indian Housing Authority
Contacts1 person available
OfficeWA

Full Description

Show more
: FY27 -09 Unit 3213 Moccasin Run Provide Material, Labor and Equipment for the Following: Demo and Abatement of Asbes tos Containing Materials for One (1) S ingle Family Home Uni t 3213 Moccasin Run, Inchelium, WA Follow all State and Federal mandatory asbestos removal and clearance protocols. The Abatement Contractor shall have an adequate number of qualified personnel available for the project. The work shall be performed by qualified, trained and licensed asbestos abatement workers and/or abatement contractor/supervisors. One (1) licensed abatement contractor/supervisor shall be dedicated for the duration of the contract. The Contractor shall carry liability insurance for asbestos abatement work. Contractor shall not have been cited or a defending party of any legal action for violation of asbestos regulations during any of the prior three (3) years. A. Demolition , abatement and disposal of all floorin g and underlayment (except as noted below) , including non- asbestos and asbes tos -containing materials, in one (1) single -family home located in Nespelem , WA Approximately 1153 square feet of flooring and underlayment will be removed. The existing bathroom flooring and underlayment will not be removed and will need to be protected from damage during the demolition and abatement. The contractor will be responsible for any damages that occur to bathroom flooring. Flooring: a) Cove Base Removal: If present remove the cove base from the bottom of all walls throughout the home. Be careful not to damage the paint on the walls that is above the existing cove base height. b) Baseboard Heaters: If it is necessary to move the baseboard heaters, take precautions to avoid damaging any wiring. c) Flooring and Underlayment Removal: Remove all layers of flooring and underlayment down to the subfloor throughout the entire floor system of each home. Please note that all flooring and underlayment located beneath framed walls must remain in place. d) All asbestos -containing materials (ACM) over subfloor are currently encapsulated under a layer of plywood underlayment and flooring. This layer may be glued, stapled and/or screwed to the original ACM containing sheet vinyl flooring which was adhered to a layer of particle board underlayment over the subfloor. Use caution when scraping the subfloor to avoid creating large gouges. e) After the flooring layers have been removed, the contra ctor will take care to remove all remaining fastene rs from the surface of the subfloor, including staples, nails, and screws. f) Any items such as kitchen base cabinets, bathroom vanities, kitchen appliances, water heater, toilet and interior doors/jambs will be removed from the home by CIHA before abatement work begins. B. Disposal : a) All asbestos -containing materials (ACM) will be bagged before being removed from the home and transported to an approved disposal facility, such as the Okanogan County Landfill or the Graham Road Recycling & Disposal Facility. b) Please provide CIHA with a copy of the waste manifest from the home within five working days after the project is completed. c) Any flooring and underlayment layers that do not contain ACM can be disposed of in landfills. Dumping receipts will be required for all materials removed from the home. C. Clearance: a) To obtain clearance after the removal of all Asbestos -Containing Materials (ACMs), please ensure that the home is thoroughly cleaned. The contractor will submit the clearance testing results to CIHA within two (2) working days after the removal process is completed. b) Once clearance has been obtained, the contractor may authorize CIHA to remove all critical barriers. D. Abatement Documentation Requirements : 1. U.S. EPA NOTIFICATION OF DEMOLITION AND RENOVATION 2. Asbestos Abatement work plan 3. Current worker certifications, medical and fit test records and acknowledgements. 4. Air sampling PCM analysis report 5. Waste shipment records (proof of proper disposal)

More opportunities from Confederated Tribes of the Colville Reservation → Colville Indian Housing Authority

Same awarding agency

NAICS: 561730
New
SLED
Snow Removal Services Arrow Lakes Apartments and Buttercup Lane Community Center Inchelium, WA
Solicitation # FY27-05
The Colville Indian Housing Authority is soliciting quotations for snow removal and ice melt application services at Arrow Lakes Apartments and the Buttercup Lane Community Center in Inchelium, Washington. The project period runs from November 19, 2026, to April 1, 2027. The contractor is responsible for clearing designated sidewalks, building entries, handicap ramps, and other perimeter areas seven days a week on an as-needed basis. Services are triggered by snow accumulations of two inches or more, with a maximum of two service visits per 24-hour period. The contractor must provide all labor, materials, and safety equipment in compliance with TOSHA standards and must remove all generated debris from the premises without using agency dumpsters. Award is based on price, utilizing a preference-based selection process where qualified Indian-owned economic enterprises are given preference if their quotation is no more than 10 percent higher than the lowest responsive bid. Bidders must submit their proposals by November 24, 2026, including a non-collusive affidavit, TERO compliance plan, and HUD Form 5369-A. Required certifications include the Davis-Bacon Act and Clean Air and Water certifications. Contractors must provide proof of liability, auto, and Washington State Industrial insurance before execution. Invoicing must be submitted via HUD-approved forms to the designated contact, requiring original signatures and detailed service logs including date, time, and snow depth verification photos.
Landscaping Services

POSTED

about 7 hours ago

DEADLINE

in 6 days
View Details
NAICS: 562910
New
SLED
FY2 7-08 ICDBG Asbestos Containing Material ( ACM ) Flooring Demo and Abatement Project 1047 Mushroom Corner, Nespelem, WA 99155
Solicitation # FY27-08
The Colville Indian Housing Authority is requesting quotations for the demolition, abatement, and disposal of asbestos-containing material (ACM) flooring and underlayment at a single-family home located at 1047 Mushroom Corner, Nespelem, WA. The project involves the removal of approximately 1,019 square feet of flooring and underlayment down to the subfloor, including cove bases. All work must be performed by certified asbestos workers and supervised by a certified asbestos supervisor, adhering to EPA AHERA, NESHAPS, and OSHA regulations. Key deliverables include the submission of clearance testing results within two working days of completion, an asbestos abatement work plan, worker certifications, air sampling PCM analysis reports, and waste shipment records. Quotations are due by December 9, 2026, at 3:00 PM local time. Award decisions will be based on price, with a specific preference for qualified Indian-owned economic enterprises or organizations whose quotations are reasonable and no more than 10 percent higher than the lowest responsive bid. Contractors must be registered in the System for Award Management (SAM) with a Unique Entity Identifier and comply with Davis-Bacon wage requirements, TERO regulations, and Equal Employment Opportunity standards. Required insurance includes Commercial General Liability and Auto Insurance, and contractors must provide Washington State Industrial Insurance or an equivalent. There is no specified set-aside status for this solicitation.
Remediation Services

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS