FY2 7-09 Asbestos Containing Material ( ACM ) Flooring Demo and Abatement Project 3213 Moccasin Run, Inchelium, WA 99138
Open
FY27-09State & LocalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
NAICS
N/A
Place of Performance
Set-Aside
NONE
Documents
1PDF
PDF
AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Everything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- Buyer contactPhone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Organization & Contact Information
Show more
AgencyConfederated Tribes of the Colville Reservation → Colville Indian Housing Authority
Contacts1 person available
OfficeWA
Organization / AgencyConfederated Tribes of the Colville Reservation → Colville Indian Housing Authority
Office AddressWA
Contacts
Full Description
Show more
: FY27 -09 Unit 3213 Moccasin Run Provide Material, Labor and Equipment for the Following: Demo and Abatement of Asbes tos Containing Materials for One (1) S ingle Family Home Uni t 3213 Moccasin Run, Inchelium, WA Follow all State and Federal mandatory asbestos removal and clearance protocols. The Abatement Contractor shall have an adequate number of qualified personnel available for the project. The work shall be performed by qualified, trained and licensed asbestos abatement workers and/or abatement contractor/supervisors. One (1) licensed abatement contractor/supervisor shall be dedicated for the duration of the contract. The Contractor shall carry liability insurance for asbestos abatement work. Contractor shall not have been cited or a defending party of any legal action for violation of asbestos regulations during any of the prior three (3) years. A. Demolition , abatement and disposal of all floorin g and underlayment (except as noted below) , including non- asbestos and asbes tos -containing materials, in one (1) single -family home located in Nespelem , WA Approximately 1153 square feet of flooring and underlayment will be removed. The existing bathroom flooring and underlayment will not be removed and will need to be protected from damage during the demolition and abatement. The contractor will be responsible for any damages that occur to bathroom flooring. Flooring: a) Cove Base Removal: If present remove the cove base from the bottom of all walls throughout the home. Be careful not to damage the paint on the walls that is above the existing cove base height. b) Baseboard Heaters: If it is necessary to move the baseboard heaters, take precautions to avoid damaging any wiring. c) Flooring and Underlayment Removal: Remove all layers of flooring and underlayment down to the subfloor throughout the entire floor system of each home. Please note that all flooring and underlayment located beneath framed walls must remain in place. d) All asbestos -containing materials (ACM) over subfloor are currently encapsulated under a layer of plywood underlayment and flooring. This layer may be glued, stapled and/or screwed to the original ACM containing sheet vinyl flooring which was adhered to a layer of particle board underlayment over the subfloor. Use caution when scraping the subfloor to avoid creating large gouges. e) After the flooring layers have been removed, the contra ctor will take care to remove all remaining fastene rs from the surface of the subfloor, including staples, nails, and screws. f) Any items such as kitchen base cabinets, bathroom vanities, kitchen appliances, water heater, toilet and interior doors/jambs will be removed from the home by CIHA before abatement work begins. B. Disposal : a) All asbestos -containing materials (ACM) will be bagged before being removed from the home and transported to an approved disposal facility, such as the Okanogan County Landfill or the Graham Road Recycling & Disposal Facility. b) Please provide CIHA with a copy of the waste manifest from the home within five working days after the project is completed. c) Any flooring and underlayment layers that do not contain ACM can be disposed of in landfills. Dumping receipts will be required for all materials removed from the home. C. Clearance: a) To obtain clearance after the removal of all Asbestos -Containing Materials (ACMs), please ensure that the home is thoroughly cleaned. The contractor will submit the clearance testing results to CIHA within two (2) working days after the removal process is completed. b) Once clearance has been obtained, the contractor may authorize CIHA to remove all critical barriers. D. Abatement Documentation Requirements : 1. U.S. EPA NOTIFICATION OF DEMOLITION AND RENOVATION 2. Asbestos Abatement work plan 3. Current worker certifications, medical and fit test records and acknowledgements. 4. Air sampling PCM analysis report 5. Waste shipment records (proof of proper disposal)
More opportunities from Confederated Tribes of the Colville Reservation → Colville Indian Housing Authority
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
