FY2023-24 Culvert Replacements - Lincoln Rd At Snake River

Active
20261030028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation ST31002440N is a project for the County of Sutter in Yuba City, California, focused on the FY2023-24 culvert replacements at Lincoln Road and Snake River. The scope of work includes dewatering the canal, cleaning and removing sediment from existing culverts, sealing interior concrete joints, and applying a high-strength spray-applied lining system. The project also requires temporary traffic control, road closures, waste disposal, and final inspection. An additive alternative is available for the replacement of existing fence posts and the wood board headwall. The estimated construction cost is between 100,000 and 300,000 dollars, and the contract will be awarded to the lowest responsible bidder based on financial capability, experience, previous performance, and available resources. The work must adhere to the 2022 and 2024 California Department of Transportation Standard Specifications and Standard Plans. Technical requirements for the shotcrete lining include a minimum 1-day compressive strength of 4000 PSI and a 28-day compressive strength of 8000 PSI, with nozzlemen requiring ACI CPP 660.l-17 certification. Bidders must submit a statement of experience, subcontractor designations, and a bid bond of at least 10 percent of the aggregate sum. Upon award, a 100 percent performance and payment bond is required. The contractor must comply with California Labor Code prevailing wage requirements and submit a dewatering and discharge work plan at least 15 days before starting operations. Payment requests are due by the 25th of each month with a minimum 30-day processing period.

General Info

Sutter County project for culvert replacements and lining at Lincoln Road and Snake River.

Place of Performance

Yuba City, CA, 95993, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Sutter
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → County of Sutter
Office AddressN/A

Full Description

Show more
Bid #ST31002440N: The project involves the FY2023-24 Culvert Replacements at Lincoln Rd at Snake River. The scope of work includes dewatering the canal, cleaning and removing sediment from existing culverts, sealing interior concrete joints, and applying a high-strength spray-applied lining system. Additional work comprises temporary traffic control, road closure, proper waste disposal, and final inspection. An additive alternative includes replacing existing fence posts and the wood board headwall in kind or with an approved equivalent structure.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping, the installation of new gravity sewers and manholes, and various site improvements including stormwater facilities and grading. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Bidders must provide a bid bond and, upon award, furnish performance and payment bonds along with proof of insurance. Contract administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment submitted to the Engineer. Performance begins upon the issuance of a Notice to Proceed, and the contractor is responsible for all necessary testing and commissioning to ensure a complete and operating pumping station.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
WG Construction is seeking MBE/WBE subcontractors for the Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, paving, fuel tank relocation, and the demolition of existing facilities. Subcontracting opportunities are specifically available for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Interested parties should contact Trish Mousavizadegan at [email hidden] or [phone hidden] for access to plans and specifications. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with a required completion timeframe of 610 calendar days following the Notice to Proceed. Late completion is subject to liquidated damages of 1,000 dollars per day. The contract mandates compliance with the Davis-Bacon Act, including specific wage determinations for Frederick County and paid sick leave requirements. Award will be granted to the lowest responsive and responsible bidder. Bidders must provide a bid guarantee, and the successful contractor must furnish performance and payment bonds equal to 100 percent of the contract amount. All bids must be submitted electronically via the City's e-Procurement Portal by 2:00 pm on November 12, 2026.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details

More opportunities from California → County of Sutter

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS