Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on June 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fy2025 - 04 Harris Drive / Street Improments

Closed
PE-66722-NONST-2025-000000011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Harris Drive Street Improvements project involves upgrading a segment of Harris Drive from the intersection with Main Street southward for approximately 680 feet. Key enhancements include the installation of a 5-foot sidewalk along the west side connecting to Main Street, widening the existing pavement to 22 feet up to the Veterans Park entrance, and milling and paving the remaining road surface. The project also entails relocating a 6-inch water line, installing a new fire hydrant at the rear of 480 Main Street, and replacing stormwater infrastructure at 123 Harris Drive. Additionally, the project will feature the planting of around 12 Cherry Blossom Trees along the sidewalk into the park site, contributing to aesthetic and environmental improvements. The contract, titled "Fy2025 - 04 Harris Drive / Street Improvements," was posted on June 20, 2025, with a response deadline of July 11, 2025. It is managed by the City of Hiram, Georgia, under the NAICS code 237110, with a project budget estimated between $500,000 and $1,000,000. The primary point of contact is Clifford McGrady, reachable via email at [email hidden] or by phone at [phone hidden]. The project aims to enhance transportation infrastructure, water and stormwater systems, and urban landscaping within the specified area.

General Info

Documents

1
DOCX, High priority: read this firstitb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66722 HIRAM, PE-66722-NONST-2025-000000011 to PE-66722-NONST-2025-000000011.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Hiram
Contacts1 person available
OfficeN/A

Full Description

Show more
The Harris Drive Street Improvements will consist of the following:
The extent of the project along Harris Drive begins at the intersection of Main Street and runs south 680 feet to the end of Harris Drive. ¿ Proposed work will include 5 ft of sidewalk connecting with Main Street along the west side of Harris Drive. ¿ The pavement width of Harris Drive will be increased to 22 ft up to the intersection of the Veterans Park entrance. ¿ Relocation of the existing 6-inch water line, and includes a new fire hydrant assembly on Harris Drive. This is located at the rear of 480 Main Street. ¿ Stormwater infostructure will be replaced at 123 Harris Drive. ¿ Approximately 12 Cherry Blossom Trees will be planted on the west of Harris Drive, along the sidewalk, into the park site. ¿ Milling and paving of remaining road surface.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS