This Solicitation opportunity from Ohio was posted on February 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FY2026 CAT2 Equipment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Notre Dame Academy is seeking proposals to replace aging network switches at three locations: the Main Network Distribution Closet, the Junior Academy IDF Closet, and the 3rd Floor IDF Closet in Toledo, Ohio. The project requires the installation of specific NETGEAR AV Series managed switches and power supplies, or equivalent hardware, along with necessary fiber transceivers, patch cables, and Leviton patch panels. Installation is scheduled to take place between June 1, 2026, and August 15, 2026, with site visits available in early March 2026. Qualified vendors must be bonded, insured, and valid resellers of the quoted equipment, which must be new and include manufacturer warranties. Strict administrative requirements apply, including the necessity of a SPIN, the use of Service Provider Invoicing, and the ability to provide discounted billing. Proposals must separate hardware, installation, and configuration costs and be submitted by 9:00 am Eastern on March 23, 2026. Preference will be given to local or in-state vendors with previous experience.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Supply of Infineon Power Transistors (NSN 5961-01-690-9206)Open now, due in 13 days
- Electrical Component SupplyOpen now, due in 21 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Opportunities for a site visit are available on Wednesday, March 4, 2026, or Wednesday, March 11, 2026. Please contact Jeff Williams (•••••@•••••.•••Sign up to see this detail) to schedule an appointment. Desired Equipment: Install and replace older switches with the following new equipment: Server Room Main Network Distribution Closet 1 each, NETGEAR AV Series M4350-44M4X4V with 24x 1G/2.5G/5G/10G PoE++ Ports,8x SFP+ Ports, 8x SFP28 25G Ports or equivalent 1 each, NETGEAR AV Series MSM4352 Switch 44x2.5G, 4x10G/Multi-gig PoE++ and 4xSFP28 25G (MSM4352) Managed Switch or equivalent 2 each, NETGEAR APS920W-100NES/AJS power supply with power cords Needed to achieve a 2.5G PoE++ power budget for PoE++ features across all ports
Junior Academy IDF Closet 1 each, NETGEAR AV Series MSM4352 Switch 44x2.5G, 4x10G/Multi-gig PoE++ and 4xSFP28 25G (MSM4352) Managed Switch or equivalent 2 each, NETGEAR APS920W-100NES/AJS power supply with power cords Needed to achieve needed 2.5G PoE++ power budget for PoE++ features across all ports 3rd Floor IDF Closet 1 each, NETGEAR AV Series MSM4352 Switch 44x2.5G, 4x10G/Multi-gig PoE++ and 4xSFP28 25G (MSM4352) Managed Switch or equivalent 2 each, NETGEAR APS920W-100NES/AJS power supply with power cords Needed to achieve needed 2.5G PoE++ power budget for PoE++ features across all port
All necessary fiber transceivers, miscellaneous hardware and patch cables as needed to be compatible with existing infrastructure and fiber patching Leviton 49255-H24 QuickPort Patch Panel, 1RU or equivalent as needed at each location Labor for Installation, Setup and Configuration must be a separate line item
Disqualifying Factors: All hardware quoted must be compatible with existing infrastructure. Hardware quoted must be new with manufacturers warranty. Quotes for used equipment will not be considered. Vendor must have a SPIN at the time of awarding contract. Vender must bill via Service Provider Invoicing (SPI). The discounted invoice will be sent to NDA for payment and the remaining balance must be billed to USA directly Cabling vendors must be bonded/insured. Vendor must give assurances that all quoted prices will be honored at time of purchase. All vendors must conduct a walk-through of each location if bidding on the cabling project and all quotes must include all cabling material, necessary components, and installation costs to complete the project. Installation costs must be listed separately from hardware costs. Vendor must demonstrate they are a valid reseller of products quoted. Proposals from vendors on Red Light Status with the FCC or delinquent on a debt to a state or federal governmental agency or entity will be disqualified. In-state (or local) vendors preferred. Previous experience with vendor preferred. Vendor must put in writing their willingness to provide discounted bills. Must demonstrate ability to meet installation timeline. Deadline for vendor proposals is 9:00 am Eastern, 29 days from the date this Form 470 is posted. We reserve the right to reject late-submitted proposals.
All questions and quotes are to be emailed to •••••@•••••.•••Sign up to see this detail
Requested services (4 line items): - Category 2 — Internal Connections — Switches And Necessary Software And Licenses - Category 2 — Internal Connections — Antennas, Connectors, And Related Components
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260022732/47036/21216887-USAC_FCC_FORM_470_APPLICATION_260022732_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260022732/47036/21215196-RFP%20Cat2%20Equipment.docx
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
