Furnish Labor and Materials to: A. Demolition: This portion is to remove all remaining materials that are scheduled to be replaced with new as outlined in the Scope of Work. Any materials still onsite when project starts will be the awarded contractor’s responsibility for disposal. B. Laundry Room Subfloor and Flooring: 1. Floor Demo and Repairs : Remove existing carpet to expose vinyl floor to, approximately 72 sq. ft. Install 19/32 in. CDX Plywood over vinyl flooring, and ensure smooth and level surface. Install the Plywood with proper length screws that penetrate subfloor surface and floor joists. Space and countersink screws below the surface of underlayment, at 4” o.c. at all joi nts and 8” o.c. in the field. The chest freezer, washer and dryer will need to be removed and reset to perform these repairs. The extent of damage to floor and framing subject to change after removing flooring and appliances, it is estimated at approximate ly 72 sq. ft. Homeowner will designate location for storing appliances . Contractor shall move and protect items so they do not incur damage during construction. 2. Furnish and install new “Lifeproof” model # 1966106LP (or approved equal) click lock, waterproof, vinyl plank flooring , approximately 72 sq. ft. Provide the homeowner with a color sample prior to ordering. 3. Clean and prep the underlayment prior to installing vinyl plank flooring. Follow all flooring manufacturers installation instructions and floor prep recommendations. Install Ardek 15 leveler as needed to ensure a smooth surface. 4. Install correct transition strips as recommended by the flooring manufacturer between the laundry room and the kitchen. 5. Install “Roppe” brown, 4”, rubber cove base continuously at all wall areas where new vinyl flooring has been installed. C. Rear Entry Door: 1. Preparation : Verify the new door is the correct height, width, jamb width and swing prior to removal and replacement of the existing door. 2. Removal of Existing Door : Carefully remove interior and exterior trim/molding. Remove screws or nails securing the door frame to the rough opening. Remove the old door frame from the rough opening. Inspect the rough opening for any damage, rot, or structural issues, repair as necessary this is to include the rim joist under the door to be inspected and repaired as needed. 3. Installation of Pre -Hung Door: Dry fit the door to ensure it fits correctly in the rough opening. Apply a weatherproofing membrane or flashing tape around the rough opening as needed. Set the new pre -hung door in place (Builders Choice) 36 in. x 80 in. 6- Panel s mooth, right hand in- swing primed fiberglass p re-hung door with 4- 9/16" jamb and brick mould m odel # HDFG6PS3068R or approved equal . Ensure the door is level, plumb, and square. Use shims to adjust the door frame as needed, ensuring consistent gaps around the door. Secure the door frame to rough opening using appropriate screws. Test the door to ensure it opens and closes smoothly without binding. Install “Great Stuff” model # 230612, window and door insulating spray foam (or approved equal) between door jamb and framing to f ill any gaps. Install interior and exterior trim/molding to match existing as closely as possible. Install new doorknob and deadbolt “Kwikset” model # 92420 -036 or approved equal. 4. Paint and prep: Fill nail/screw holes with correct filler as needed and sand smooth prior to priming/painting. Install one coat of “Behr” model # 43601 primer to interior and exterior of door and interior and exterior trim. Install two coats “Behr Premium” model # 752001, interior/exterior, door and trim paint (or approved equal ) to interior and exterior of door and interior and exterior trim. Match existing paint sheen and color as closely as possible. D. Rear Landing and Stairs: See attached Plans 1. Demo: Remove existing wooden landing, stairs, handrail, and guardrail. 2. Construct Landing: Install 4’ x 4’ landing (see attached plans) Center on the doorway. Install 4”x 4” pressure treated support posts 30” deep centered in 12” diameter holes. Fill holes with concrete to 2” above ground level and slope to promote drainage away from th e post . Deck joists and rim boards to be # 2 and better, fir, pressure treated 2”x 6” nom., with the exception of pressure treated 2”x 12” nom. rim joist at the stair ends of the deck . Deck joists to run perpendicular to home. Deck joist spacing to be 16” o.c. Notch the top of the 4x4 to accept the 2”x12” rim joist. Attach 2”x 12” to post using 6 evenly spaced screws. (2 rows) use “Deckmate” # 9 x 3in. Star Flat -Head Wood Deck Screw (or approved equal). Install “Simpson” LUS26Z galvanized Face- Mount joist hanger for 2x6 Nominal Lumber (or approved equal) on each end of the common joist. Install Gibraltar Building 1- 1/2 in. x 10 ft. Galvanized Steel Z Bar Flashing (or approved equal). Install under the existing siding, and over the deck ledger, but below the new decking. Install 2x6 pressure treated decking over framing, no more than one splice per run, stagger splice joints minimum of 32”. Use “Deckmate” #9 x 3 in. Star Flat- Head Wood Deck Screw (or approved equal). Maximum spacing between deck boards is 1/4” . 3. Construct Stairs: Align steps to Outer edge of deck so handrail will be continuous. Construct new 4 -foot -wide steps to concrete landing below. Use all pressure treated material. Use 4 -2x12 PT Stringers. Hang the stringers from 2x12 rim with LUC ZMAX Galvanized Face -Mount Co ncealed -Flange Joist Hanger (or approved equal). (Standard hanger ok for center stringer). Install 2 -2x6 for treads. Using Deckmate #9x 3 in. Star Flat -Head Wood Deck Screw (or approved equal). Butt the pressure Treated 2x6 together tight on treads. Treat all cut ends of pressure treated material. Use Copper - Green Brown Wood Preservative, (or approved equal). Remove stickers from treated ends. Provide stairs with a maximum rise of 6 inches. The largest riser can be no more than 3/8” difference from the smallest. (If a 6” rise will add a tread, and push the landing out, the code allowed maximum rise is 7 ¾” try to use 6” risers for elders) 4. Construct new concrete landing, and set treated post in concrete: Construct 4 ft. by 4 ft. by 4 in. thick concrete landings with thickened edges (see attached plans). Compact soil prior to placing concrete. The landings will be built where the stair stringers land with 3 inches behind the heel of the stringer and extend 3 feet past the stingers. a. Install three (3) # 4 rebar each way. b. Tool the edges, and provide a light broom finish. c. Set one (1) 4”x 4” treated posts into concrete that is poured 30 inches deep and 12- inch diameter hole. Install post where the last tread of the stairs will land, on the inside edge of the outer stringer. d. Strip all form boards, and slope grade away from landing. 5. Construct new guard on open side of the Landing - Install 2x6 cedar lateral on top of post, aligned flush to the outer edge of post. Install all cedar using Deckmate #9 x 3- 1/4” Star Flat - Head Wood Deck Screws (or approved equal). Install 2x4 cedar rail on spine to inside edge of the post pushed tight to the bottom edge of the 2x6 cap. Install 2x4 cedar rail midway up the inside edge of the posts midway between the wa lking surface and the bottom of the of the upper cedar rail. Attach cedar rails to post using 2 screws at each post. Stain all cedar. Use BEHR DECK plus Cedar Natural tone transparent Waterproofing Exterior Wood Finish (or approved equal). See Handrail and Guard detail attached. 6. Construct new guard down open side of the stairs - Provide guard down each open side of the stairs. Bevel top of bottom post to match pitch of 2x6 cedar rail. Install 2x6 cedar top rail on the flat, and 2x4 cedar side rail per the detail. Use Deckmate #9 x 2 - 1/2” Star Flat -Head Wood Deck Screws (or approved equal). 7. Install new handrail on one side of each stairway- Stain and install handrail on one side of each stairway. Use Woodgrain Millwork WM 231 1- 1/2 in. x 1- 11/16 in. x 96 in. Pine Handrail (or approved equal). Stain. Use BEHR DECK Plus Cedar Natura l Tone Transparent Waterproofing Exterior Wood Finish (or approved equal). Return ends to 2x4 cedar side rails. Locate handrail between 34 and 38 inches above the nose of the threads. Use 3 mounting brackets. One near each end, one near center. Use Everbui lt Satin Nickel Light- Duty Handrail Bracket, (or approved equal). E. Clean up and Dispose of materials 1. Clean the construction site daily, and at the end of the job clean up all construction debris 2. Dispose of materials per approved CCT Solid Waste Disposal Plan. 3. Clean up all debris related to the contract work. Dispose of all materials offsite. 4. Clean interior of home affected by construction to move -in ready condition. 5. Additional clean -up will be necessary each time Contractor enters the home to perform punc h list or incomplete work. 3057 Bridge Creek Rd. Inchelium: