This Solicitation opportunity from Massachusetts was posted on October 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY26 Barnstable Harbor Entrance & Blish Point Dredging

Closed
FY26-IFB-033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 15 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract involves the mechanical dredging of approximately 2,343 cubic yards of sediment from Barnstable Harbor's Mid-Entrance Channel and Blish Point Boat Ramp in Massachusetts, with an estimated disposal of around 3,515 tons of dewatered sediment. The work requires the contractor to furnish all labor, materials, and floating water-based equipment necessary for dredging, dewatering, testing, and transportation of sediments to a designated shoreside disposal facility. The sediments will undergo final dewatering, mixing, and testing for conductivity at the disposal site, with mitigation measures implemented as needed before loading into trucks for upland disposal. The contractor is responsible for coordinating with regulatory agencies such as MADEP and forming contractual arrangements with the disposal facility, ensuring compliance with environmental permits and project specifications. The project is set within a framework of detailed technical, administrative, and regulatory requirements, including adherence to special conditions, technical specifications, and prevailing wage laws. The work must be completed within specified timeframes, with remobilization provisions if necessary, and involves coordination with multiple stakeholders, including the Town of Barnstable and regulatory agencies. Bidding procedures are outlined with a response deadline of November 12, 2025, and the project is valued between $500,000 and $1,500,000. Supporting documents provide comprehensive instructions for bid submission, technical plans, environmental and safety conditions, and wage compliance, ensuring that the project meets environmental, safety, and operational standards throughout its execution.

General Info

Documents

6

2025 Barnstable Harbor Mid-Entrance Channel and Blish Point Boat Ramp Maintenance Dredging - Section 17 Technical Specifications

PDF, High priority: read this first305 pages · other
High

IFB FY26 Barnstable Harbor Entrance & Blish Point Dredging

PDF, High priority: read this first97 pages · ifb
High

IFB Plans for Mid-Entrance Channel and Blish Point Boat Ramp Access Channel Maintenance Dredging

PDF, High priority: read this first1 page · ifb
High

Massachusetts Prevailing Wage Schedule for Barnstable Harbor Entrance & Blish Point Dredging FY26

PDF, High priority: read this first3 pages · other
High

2025 Barnstable Harbor Mid-Entrance Channel and Blish Point Boat Ramp Maintenance Dredging Section 16 Special Conditions

PDF, Low priority16 pages · contract-document
Low

FY26 Barnstable Harbor Entrance & Blish Point Dredging Portal Submission Instructions

PDF, Low priority2 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Town of Barnstable
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be performed under this contract includes, but is not limited to, furnishing all labor, materials, and equipment necessary to complete mechanical dredging of an estimated 2,343 cubic yards (CY) of sediment from the existing Barnstable Harbor Mid-Entrance Channel and Blish Point Boat Ramp. Sediments are to be mechanically dredged and loaded onto material barges for dewatering and transportation to the contractor's selected shoreside facility. Once dewatered, material will be offloaded at the contractor’s selected waterfront facility. At the facility, following final dewatering and mixing, the material must be retested for conductivity and be mitigated if necessary and as required before being loaded into trucks and hauled to the contractors selected upland use site. All dredging and dewatering will be completed utilizing floating water-based equipment. The Contractor is responsible for coordinating the acceptance of material with the Contractor’s selected disposal facility, forming any necessary contracts with the selected disposal facility, and coordination with regulatory agencies such as MADEP and others as applicable to permit the disposal. Disposal will be measured in Tons and it is estimated that approximately 3,515 TONS of dewatered sediments will be transported and disposed.

More opportunities from Massachusetts → Town of Barnstable

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS