FY26-DDOT-IPMA-Metropolitan Branch Trail - Blair Rd to Piney Branch Rd NW

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the construction engineering design for a multi-use trail extending from Blair Road and Aspen Street NW at the southern end to the intersection of Piney Branch Road and Eastern Avenue NW at the northern end, completing a critical connection between two existing segments of the Metropolitan Branch Trail along its western alignment as outlined in the Concept Plan. The scope encompasses comprehensive project management, coordination with multiple agencies, extensive public involvement efforts, and a full suite of technical services including surveying, mapping, right of way acquisition, traffic and utility analyses, geotechnical investigations, and detailed trail and structural design. Additional deliverables include storm drainage and stormwater management systems, sediment control measures, temporary traffic control plans, signing and pavement markings, lighting design, traffic engineering solutions, landscaping, and the preparation of full construction cost estimates, specifications, and quality assurance and quality control protocols to ensure compliance and durability.

General Info

Design and build multi-use trail connecting Blair Road to Eastern Avenue NW with full engineering and environmental services.

Agency

District of Columbia → Transportation (DDOT)

NAICS

N/A

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → Transportation (DDOT)
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Columbia → Transportation (DDOT)
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Work under this too consists of the construction engineering design of a multi-use trail from Blair Rd and Aspen St, NW, at the southern end of the study area, to the intersection of Piney Branch Road and Eastern Avenue, NW, at the northern end of the study area. The project connects two sections of the Metropolitan Branch Trail that follow the western alignment in the Metropolitan Branch Trail Concept Plan. The scope of work includes project management, agency coordination, public involvement, survey and mapping, right of way services, traffic studies, utility mapping, geotechnical services, trail design, structural engineering, storm drainage, stormwater management, sediment control, traffic control (MOT), signing and pavement markings, lighting, traffic engineering, landscaping, cost estimates for construction, specifications and QA/QC.