Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY26 HYCC ERV1 & ERV2 REPLACEMENT REISSUE- General Contractor

Closed
FY25-IFB-087 General ContractorState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the comprehensive removal and replacement of two roof-mounted HVAC Energy Recovery Ventilator (ERV) units at a facility in Massachusetts. One new unit will be installed on the existing roof curb near the gymnasium, while the other will be placed on the ground adjacent to the ice rink. The scope includes not only the installation of these units but also the removal of existing interior ceiling finishes to facilitate new ductwork, piping, and control wiring. The project encompasses all necessary construction activities such as framing, sheathing, air barriers, carpentry, waterproofing, dampproofing, caulking, and interior finishes, along with mechanical, plumbing, electrical, and site work to ensure the buildings and amenities are fully operational upon completion. The work requires coordination of various trades and adherence to all relevant permits, licenses, and certifications. It also involves demolition and reinstallation of doors, installation of pre-engineered metal framing, light gauge metal framing, and site improvements. The project size is estimated between $500,000 and $1,500,000, with a response deadline of August 27, 2025. The contract is issued by the Town of Barnstable, Massachusetts, under solicitation number FY25-IFB-087, targeting qualified general contractors to deliver a fully functional HVAC system upgrade aligned with the specifications provided.

General Info

Place of Performance

MA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Town of Barnstable
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The project consists of the removal and replacement of two HVAC ERV units. Both existing units are roof mounted. One new unit will be installed on the existing roof curb near the gymnasium. The second unit will be installed on grade adjacent to the ice rink. Work will include removal and replacement of interior ceiling finishes to allow for installation of new HVAC duct work and piping. The work will include all operations necessary to deliver the building(s) and ancillary on and off site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: Construction related to the removal and replacement of two HVAC ERV units. Existing units are on the roof. One new unit will be located on an existing roof area and the second unit located on grade next to the existing building. Work will include removal and replacement of interior ceiling finishes to allow for installation of new HVAC duct work, piping, and control wiring, Pre-Engineered metal building framing, Demolition of existing door and installation of new in a different location, Light gauge metal framing, Sheathing and air barrier, Carpentry, waterproofing, dampproofing, caulking, Interior finishes, Mechanical, plumbing and electrical, and Sitework.

More opportunities from Massachusetts → Town of Barnstable

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS