Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amendment - 003 - FY26 OTS Rappel Tower Demolition Service

Closed
FA3300FY26OTS091462Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
C5613351-D - Concrete Debris Removal and Slope Stabilization Services
Solicitation # C5613351-D
The California Department of Corrections and Rehabilitation (CDCR) is soliciting bids for contract C5613351-D to provide concrete debris removal and slope stabilization services at the Richard J. Donovan Correctional Facility in San Diego, California. The project involves clearing and grubbing a top layer of crushed concrete debris, re-grading approximately 10,000 cubic yards of soil to stabilize slopes against erosion and slide risks, and implementing erosion control measures such as hydroseeding and the installation of fiber rolls. The contractor is responsible for all labor, materials, equipment, and transportation, with compensation based on the Public Works Rate Sheet. Performance is subject to strict quality standards, including specific grade tolerances and material specifications, with oversight from a CDCR Representative and a Geotechnical Engineer. The contract is awarded based on the lowest price, with specific incentives available for Disabled Veteran Business Enterprises (DVBE) and reciprocal preferences for California-based companies. Bidders must provide a bid security of at least 10 percent of the base bid and are required to furnish performance and payment bonds upon award. Compliance with California prevailing wage laws, the Americans with Disabilities Act, and the project's Stormwater Pollution Prevention Plan (SWPPP) is mandatory. All submissions must be sent electronically to the designated CDCR email address by the specified deadline, including a completed bid submittal checklist and the required rate sheets.
California Department of Corrections & Rehabilitation

POSTED

about 11 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Department of Defense, through the 42nd Contracting Squadron at Maxwell AFB, is soliciting firm-fixed price quotations for the professional demolition and removal of the 60-foot wooden Blue Thunder Rappel Tower. This total small business set-aside project requires the contractor to provide all personnel, equipment, and materials to dismantle the tower's structural components, including the central stair access, decking, railing, and guy wires. The scope of work extends to the excavation of sub-surface supports and footings to a minimum of four inches below final grade, the legal off-base disposal of all debris at an approved landfill, and the restoration of the site, which includes backfilling excavated areas and replenishing the central sand pit. The period of performance is 30 days, and the project is located in Montgomery, Alabama. Award will be granted to the lowest priced contractor that meets the minimum technical and security requirements, including the ability to perform unclassified demolition services. Contractors must comply with strict safety and environmental standards, including the use of high-visibility barricades, daily hazard sweeps, and adherence to local regulations for treated wood disposal. Personnel must possess a REAL ID or valid US Passport for installation access. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.

General Info

Small business contract for Blue Thunder Rappel Tower demolition and site restoration in Alabama.

NAICS

238910 - Site Preparation Contractors

Place of Performance

Montgomery, AL, 36112, USA

Set-Aside

SBA

Documents

8

F2X3C56147AC01 Provisions and Clauses

PDF, High priority: read this first8 pages · contract-document
High

FA330026Q0831 Provisions and Clauses - Amended

PDF, High priority: read this firstamendment
High

RFQ for Rappel Tower Demolition Services - Maxwell AFB 2026

DOCX, High priority: read this first3 pages · rfq
High

RFQ OTS Rappel Tower Demolition Services - Maxwell AFB

DOCX, High priority: read this first3 pages · rfq
High

RFQ Rappel Tower Demolition Services - 31 Aug 2026

DOCX, High priority: read this firstrfq
High

RFQ Rappel Tower Demolition Services - Amended 002

DOCX, High priority: read this firstrfq
High

SOW for Demolition and Removal of 60-Foot Rappel Tower at Maxwell AFB

DOCX, High priority: read this first14 pages · sow
High

FA3300FY26OTS091462 Questions & Answers - OTS Rappel Tower Demolition

DOCX, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Aug 24, 2026 to Sep 2, 2026.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Sep 2, 2026 to Sep 10, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3300 42 Cons Cc
Contacts2 people available
OfficeMAXWELL AFB, AL, 36112-6334, USA
Office AddressMAXWELL AFB, AL, 36112-6334, USA

Full Description

Show more

The OTS Blue Thunder training ground requires a contract to assess and safely remove the Blue Thunder Rappel Tower, perform subsurface support removal, properly dispose of debris, and restore the site. The contractor shall provide all necessary personnel, equipment, fuel, tools, materials, transportation, supervision, and any other necessary items for the professional demolition of the rappel tower. Please review the attached "Draft" SOW for further instruction on what is required to complete this requirement. Review the attached Request For Quote for instructions on how to submit your quotes as well as any supporting documents. 


Amendment 002 - The period of performance for this requirement is 30-days. The previous 60-day requirement was added in error. 


Amendment 003 - Questions have been added to this amendment to include an updated response date of 10 September 2026 at 05:00 PM EDT.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS