This Solicitation opportunity from Department Of Defense was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FY26 Willapa Bay Maintenance Dredging Bid Opening Details
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Willapa Harbor Maintenance Dredging project, led by the US Army Corps of Engineers Seattle District, involves dredging federally authorized navigation channels in Bay Center, Nahcotta, and Tokeland, Washington to maintain safe and navigable depths. Approximately 180,000 cubic yards of material will be removed using mechanical clamshell dredging to achieve depths ranging from -10 to -15 feet MLLW, with an additional overdepth allowance at each site. An additional dredging of up to 10,000 cubic yards may be necessary in the Bay Center/Palix River Access Lane to facilitate transit of dredging vessels, though this volume could vary due to dynamic river conditions. Dredged material will be disposed of at designated open-water sites via bottom dump scow. The operation is scheduled to commence in summer 2026, with specific in-water work windows defined seasonally for each location to minimize environmental impacts and meet regulatory requirements. Navigational challenges in Willapa Bay, including exposure to Pacific Ocean weather, shifting shoals, and removal of navigation aids by the Coast Guard, pose significant safety and operational difficulties for contractors. The project budget is estimated between $5 million and $10 million, with dredging expected to last from three to seven months. Bidders must comply with Federal Acquisition Regulation standards, with solicitation documents available through the Army Corps office in Seattle. Key contacts for the project include Geraldine Kemp and Kimberly M. Robinson, and the solicitation response deadline is set for mid-December 2025.
General Info
Place of Performance
WA, 98640Set-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Please see attached Amendment 0003 for complete details. Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington. USACE, Seattle District has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CY is expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:? Bay Center/Palix River: 16 Jul through 30 Sep? Nahcotta: 16 Jul through 01 Feb? Tokeland: 16 Jul through 15 FebWillapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.In accordance with Federal Acquisition Regulation (FAR) Part 36 , the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months. PLEASE SEE THE ATTACHED SOLICITATION, SPECIFICATIONS AND DRAWINGS FOR INSTRUCTIONS ON SUBMITTING A BID IN RESPONSE TO THE SOLICITATION.
More opportunities from Department Of Defense → W071 Endist Seattle
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS