This Solicitation opportunity from Missouri was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FY27 NE Kirksville Maintenance Building Metal Siding Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Missouri Department of Transportation (MoDOT) is soliciting bids for the FY27 NE Kirksville Maintenance Building Metal Siding Project under solicitation MODOT 0000000395SL. The project involves replacing existing vinyl siding with new 26-gauge prefinished metal siding at the facility located at 22777 Potter Trail, Kirksville, Missouri. The scope of work includes the installation of metal wall and roof panels, flashing, sheet metal, and joint sealers, as well as necessary demolition, framing, sheathing, and glass and glazing for doors and windows. All work must comply with SMACNA architectural sheet metal manuals and ANSI Z97.1 safety glazing standards. Bids are due by September 17, 2026, at 2:00 PM Central and can be submitted electronically via MissouriBUYS or through physical mail, UPS, or FEDEX. A site visit is mandatory for bid acceptance, and those submitting hard copy bids must notify the buyer, Logan Wilbers, five business days before the closing date. Bidders must provide a bid security of 5% of the bid amount and a certificate of insurance. The winning contractor will be required to furnish a performance and payment bond for 100% of the contract price and adhere to the Buy American Act and Missouri prevailing wage requirements for Adair County. Project administration requires strict adherence to submittal and closeout procedures, including the delivery of a schedule of values within 20 days of the agreement and an initial construction schedule within 15 days of the Notice to Proceed. Payments are processed on a 30-day cycle based on a schedule of values and certified payroll records. The contractor is responsible for all quality control, testing, and the preservation of site utilities. Final acceptance by MoDOT is contingent upon the completion of all punch list items and the submission of a one-year manufacturer's warranty.
General Info
Place of Performance
MO, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Missouri → MODOT TRANSPORTATION
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
