Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY27 SNWW, Texas Sabine-Neches Waterway Maintenance Dredging

Closed
W912HY27X0048Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Galveston District, is seeking industry input for the FY27 Sabine-Neches Waterway Maintenance Dredging project, with a response deadline of July 16, 2026. This sources-sought synopsis is not a solicitation or procurement commitment but aims to identify interested and qualified firms, particularly within the small business community including 8(a), HUBZone, SDVOSB, WOSB, and other socioeconomic categories, to inform future acquisition planning. The project involves maintenance dredging of the Sabine River, with potential options in Taylor’s Bayou and Sabine Pass, requiring pipeline dredging of deep-draft navigation channels and upland confined disposal of dredged material. Work must be completed within 120 calendar days after receipt of the Notice to Proceed, with performance required to comply with USACE EM 385-1-1 and all applicable federal, state, and local regulations. The estimated contract value ranges between $10 million and $25 million under NAICS code 237990, which carries a small business size standard of $37 million in average annual receipts. Firms responding must provide their Unique Entity Identifier and CAGE code from SAM.gov, along with complete organizational details and their intent to participate under any small business set-asides. Responses must include evidence of technical competence through at least three comparable dredging projects performed within the last five years, including customer names and dollar values, and must demonstrate bonding capacity for both bid bonds at 20% of the bid amount and performance and payment bonds at 100% of the contract value. Subcontracting is limited under FAR 52.219-14 as modified by Deviation 2021-O0008, restricting subcontracting to non-similarly situated entities to no more than 85% of the contract value, excluding material costs. Liquidated damages of $4,300 per calendar day will apply for delays beyond the 120-day performance period, and bonds must be submitted within five days of award. Anticipated solicitation issuance is in April 2027, with proposals due in May 2027 and award projected for June 2027, and formal notices will be posted on PIEE. All responses must be submitted via email to the designated points of contact and require pre-registration in SAM.gov to remain eligible for future

General Info

U.S. Army Corps seeks industry input for $10M–$25M Sabine-Neches dredging project, targeting small businesses, with contract award expected June 2027.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Sabine Pass, TX, USA

Set-Aside

NONE

Documents

1

Sources Sought Synopsis FY27 Sabine-Neches Waterway Maintenance Dredging W912HY27X0048

PDF, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
Contacts2 people available
OfficeGALVESTON, TX, 77550-1229, USA
Office AddressGALVESTON, TX, 77550-1229, USA

Full Description

Show more

SOURCES SOUGHT SYNOPSIS



TITLE: FY27 Sabine-Neches Waterway, Texas Sabine-Neches Waterway Maintenance Dredging



Notice Type: SOURCES SOUGHT SYNOPSIS



Source Sought Number: W912HY27X0048



Response Date (10 days): July 16, 2026



The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject.  THIS IS A NOTICE FOR SOURCES SOUGHT ONLY.  THIS ANNOUNCEMENT SEEKS INFORMATION FROM INDUSTRY, WHICH WILL BE USED FOR PRELIMINARY PLANNING PURPOSES.  THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID.  THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT.  IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE.  NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT.  REPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. RESPONDENTS WILL NOT BE NOTIFIED OF THE RESULTS OF THE EVALUATION.



The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) and Woman-Owned Small Business (WOSB). The Government must ensure there is adequate competition of responsible firms.




Project Information: FY27 Sabine-Neches Waterway (SNWW), Texas Sabine-Neches Waterway Maintenance Dredging. Maintenance dredging of the SNWW Sabine River with options in Taylor’s Bayou and Sabine Pass.  Contractor may be familiar with the traffic conditions of the Sabine-Neches Waterway. Contractor may provide experience as a prime contractor for pipeline dredging deep draft navigation channels. This contract is not projected to be subject to environmental windows. Placement of material will include upland confined placement.




The completion time of the work is 120 calendar days.


In accordance with DFARS 236.204, the estimated construction price range for this project is: Between $10,000,000 and $25,000,000.



All construction performance must comply with the USACE Safety and Health Requirements Manual (EM 385-1-1, and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations.




The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37 million.



The Product Service Code is Z1KB.



Small Businesses are reminded under FAR 52.219-14, (Deviation 2021-O0008), Limitations on Subcontracting.  Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85% subcontract amount that cannot be exceeded.



Prior Government contract work is not required for submitting a response to this announcement.



Contractor may demonstrate any construction experience as a prime contractor working on Dredged Material Placement Areas.



Bonding Requirements: Performance and Payment Bonds are required within 5 calendar days after award, and the contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed.



If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the estimated amount of $4,300.00 for each calendar day of delay until the work is completed or accepted.



FIRMS RESPONSE SHALL INCLUDE THE FOLLOWING INFORMATION:



1. Unique Entity Identifier (UEI) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ). 



2. Name of firm w/ address, phone, fax, e-mail address, and point of contact.



3. Indicate whether your firm will submit a bid for this project if set-aside for Small Business (SB), 8(a) Small Business Development Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) Woman-Owned Small Business (WOSB).



4. Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable.



Qualifications: Responses to this source sought announcement shall indicate specialized experience and technical competence in:



 a. Demonstrate experience in completing work outlined under the paragraph above for “Project Information.”



  1. Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above or comparable work performed within the past 5 years):
  2. Brief description of each project, customer name, and dollar value of the project)– provide at least 3 examples.


  1. Firm’s Bonding Capacity (Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount) bonding level per contract and aggregate construction bonding level, both expressed in dollars.


Firms responding to this announcement, who fail to provide ALL required information requested and outlined above, may be excluded from further consideration in the review and analysis for acquisition strategy determination.



Anticipated solicitation issuance date is on or about April 2027, and the estimated proposal/bid due date will be on or about May 2027. Estimated award on or about date is June 2027. The official synopsis citing the solicitation number will be issued on Procurement Integrated Enterprise Environment (PIEE)  https://piee.eb.mil/ inviting firms to register electronically to receive a copy of the solicitation when it is issued.



Interested Firm’s shall respond to this announcement no later than, July 16, 2026, at 10:00 AM (CDT). All interested firms must be registered in SAM.gov to be eligible for award of Government contracts. Email your response to Ms. Sarah Eisele at contact@example.gov and Curtis Cole at contact@example.gov.

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
FY27 Texas City Ship Channel Main Channel and Turning Basin
Solicitation # W912HY27X1CT1
The U.S. Army Corps of Engineers, Galveston District, is conducting a sources sought synopsis for the FY27 Texas City Ship Channel Main Channel and Turning Basin maintenance dredging project. This preliminary planning effort seeks to identify capable and qualified industry partners, including various small business categories such as 8(a), HUB-Zone, SDVOSB, and WOSB. The scope of work involves performing maintenance dredging using a pipeline, hopper, or mechanical dredge, with an estimated construction price range between 10 million and 25 million dollars. The project is expected to have a completion timeframe of 240 calendar days, with an anticipated award date in August 2027. Interested firms must be registered in SAM.gov and provide their UEI and CAGE codes. Responses are due by November 7, 2026, and must include evidence of technical competence, such as three examples of comparable projects completed within the last five years and proof of bonding capacity, including a 20 percent bid bond and 100 percent performance and payment bonds. All work must comply with the USACE Safety and Health Requirements Manual EM 385-1-1 and applicable federal, state, and local regulations. The procurement falls under NAICS code 237990 and is subject to FAR 52.219-14 limitations on subcontracting.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Federal
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou
Solicitation # W912HY27RA001
The Houston Ship Channel Expansion Channel Improvement Project 11, Package 9, Segment 4 is an unrestricted, full and open competition construction project managed by the USACE Galveston District. The scope of work involves widening the main Houston Ship Channel to approximately 530 feet up to the Greens Bayou confluence and deepening the navigation channel from -41 feet to -46.5 feet between Boggy Bayou and Sims Bayou. Additional requirements include the removal of a bulkhead and abandoned pipelines, as well as the construction and utilization of upland placement areas at Beltway 8 and the East and West Clinton sites to receive dredged material. This is a Firm-Fixed-Price contract with an estimated value between 100 million and 250 million dollars. The award will be based on the Lowest Price Technically Acceptable procedure. The contract structure consists of a base contract with an anticipated delivery of 477 days after the Notice to Proceed, and five additional options that extend the total performance period to 603 days. The solicitation is tentatively scheduled for issuance in October 2026, with bids required to be submitted electronically via the Procurement Integrated Enterprise Environment solicitation module. While the project is unrestricted, the government has established specific subcontracting goals for small businesses under NAICS code 237990.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Solicitation # W912HY26BA019
Solicitation W912HY26BA019 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Galveston District, for maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway, including the channel to Port Bolivar, in Texas. The project focuses on addressing shoaling within tributary channels across Chambers, Galveston, and Brazoria Counties. The scope is divided into a primary schedule involving approximately 959,000 cubic yards of dredging to be completed within 270 calendar days of the notice to proceed, along with five optional work items. These options include dredging at the Galveston Alternate Route, Offatts Bayou Channel, and Bolivar Ferry Channel, as well as beneficial use placement at the Joycelyn Nungaray area. The procurement is conducted via sealed bidding, with the award granted to the responsible bidder offering the most advantageous price. Bidders must provide a bid guarantee of 20 percent of the offer or 3 million dollars, whichever is less, and furnish 100 percent performance and payment bonds upon award. Key administrative requirements include electronic invoicing through Wide Area WorkFlow and compliance with the Buy American Act. The solicitation has been modified by two amendments, the most recent of which extended the bid opening date to November 3, 2026. Performance for the primary CLINs is expected within 165 calendar days from the notice to proceed, while option items have shorter specific lead times ranging from 5 to 25 days.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Solicitation # W912HY26BA018
The FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging project is an unrestricted sealed bid solicitation issued by the US Army Engineer District Galveston. The project involves maintenance dredging of the Houston Ship Channel adjacent to the Bayport Flare and the Bayport Flare adjacent to the Bayport Ship Channel across Galveston, Harris, and Chambers Counties, Texas. Dredged materials are to be transported to and disposed of in Ocean Dredged Material Disposal Site zones D and F. The estimated price range for the project is between $25,000,000 and $100,000,000, with a performance period requiring work to commence within 10 calendar days of the notice to proceed and reach completion within 85 calendar days. Key technical requirements include the use of hopper dredging and adherence to the USACE National Dredging Quality Management Program. Contractors must implement an Endangered Species Protection Plan, specifically regarding sea turtle protection and relocation, which are listed as option line items. Contract administration will be managed through the Resident Management System and the Construction Management Platform for handling Controlled Unclassified Information. Bidders are evaluated based on total price and qualifications, with a 10 percent price evaluation preference granted to HUBZone small business concerns. Payments are processed electronically via the Wide Area WorkFlow system under fixed-price construction terms.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS