Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on March 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY27 Water Department Utility Maintenance

Closed
Bid #2026-39State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive improvements to the Morgans Branch Pumping Station. Key station upgrades entail the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and supporting site improvements such as stormwater facilities, fencing, and landscaping. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must adhere to strict submission requirements, including the use of prescribed EJCDC forms and the provision of bid security. The project mandates specific socioeconomic goals, including a 10 percent combined MBE/WBE participation goal for the State of North Carolina and separate EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Performance and payment bonds are required, and insurance providers must maintain an A.M. Best rating of A-VII or better. Contract administration is governed by EJCDC standard general and supplementary conditions. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The project includes liquidated damages of 1,000 dollars per day for delays in reaching both substantial and final completion. Quality assurance is managed through site inspections by the Engineer and independent testing laboratories, with specific adherence to NEMA and ASTM standards for motors and masonry.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 18 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation or replacement of valves, piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. The project also encompasses the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Requested services and supplies specifically include lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and bypass pumping. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Submissions must utilize Garney Standard Purchase Order and Subcontract documents, and any exceptions must be provided as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 26 days

General Info

Documents

6

City of Bloomington Construction Debris Manifest

PDF, Low prioritymanifest
Low

COB Traffic Control Authorization Request

PDF, Low prioritytraffic-control-authorization-request
Low

FY27 Water Department Utility Maintenance.pdf

PDF

FY27_Water_Department_Utility_Maintenance_Scope_of_Work.pdf

PDF

IDOT_Traffic_Control_Authorization_Request.pdf

PDF

Water_Department_Utility_Maintenance_SPECIAL_PROVISIONS_FY2027.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Water
Contacts2 people available
OfficeBloomington, IL, 61701, USA
Organization / AgencyIllinois → Water
Office AddressBloomington, IL, 61701, USA
Contacts
Brett LueschenOperations Manager
Misty ShaferSenior Procurement Specialist

Interested Companies (12)

G. A. Rich & SonsDeer Creek, IL
Water Well Solutions IllinoisNaperville, IL
Hoerr ConstructionGoodfield, IL

See All 12 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City of Bloomington, incorporated in 1856, is a home rule unit of government under the 1970 Illinois Constitution. The City of Bloomington is located in the heart of Central Illinois, approximately 125 miles southwest of Chicago, 155 miles northeast of St. Louis and 64 miles northeast of Springfield, the State Capital. The City of Bloomington is the County Seat of McLean County, the largest county in Illinois (approximately 762,240 acres). The results of the 2010 Census shows the City now has a population of 76,610 citizens. The economic strength of the City of Bloomington metropolitan area is well diversified with no single dominating industry.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS