Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on August 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GA4225180 - Superstructure Replacement and Substructure Rehabilitation for Bridge 1101400 on MD135

Closed
BPM045807State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The project involves the replacement of the superstructure and rehabilitation of the substructure for Bridge No. 1101400 on MD 135 over the Little Youghiogheny River. The existing steel girder bridge, which consists of three spans measuring 32, 40, and 32 feet for a total length of 104 feet, will undergo significant structural work. The scope includes removing the current concrete superstructure, repairing the underlying substructure, and performing approximately 0.17 miles of approach roadway improvements. Additional work encompasses stormwater management, installation of new traffic barriers, signage, and permanent pavement striping to enhance safety and durability. Traffic management during construction will involve maintaining one lane of traffic in each direction, controlled by a temporary traffic signal to minimize disruption. The project is valued between five and ten million dollars and is overseen by the Maryland State Highway Administration. The solicitation was posted on August 13, 2024, with a response deadline of September 19, 2024. The work aims to improve the structural integrity and safety of the bridge while ensuring minimal impact on traffic flow and roadway users.

General Info

Documents

1

GA4225180 Superstructure Replacement and Substructure Rehabilitation Bridge Project IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland State Highway Administration
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Superstructure Replacement and Substructure Rehabilitation for Bridge No. 1101400 on MD 135 over Little Youghiogheny River. The 3 span steel girder bridge has span lengths of 32’, 40’, and 32’ for a length of 104’, with a proposed clear roadway of 36’. Project includes removal of existing concrete bridge superstructure, rehabilitation of the bridge substructure, 0.17 miles of approach roadway work, storm water management, placement of new traffic barriers, signing, and installation of permanent pavement striping. One lane of traffic in each direction will be maintained with a temporary traffic signal.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS