Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Galaxy VS UPS Equipment and Manufacturer Assembly and Start-Up – No Substitutions

Active
SJ484181Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation SJ484181 is a request for quotations from Brookhaven Science Associates, LLC for the procurement of specific Galaxy VS uninterruptible power supply (UPS) equipment and related services for Brookhaven National Laboratory in Upton, New York. The requirement consists of a 15 kW, 208 V UPS with a total of seven 9 Ah smart modular battery strings, a UL-listed maintenance bypass cabinet, a cable and conduit box, and a modular battery cabinet. The configuration must provide specific runtimes of 155 minutes at an 8.25 kW load and 76.5 minutes at a 15 kW load. To preserve warranty coverage, the manufacturer must perform the assembly and start-up services, and the package must include a one-year on-site warranty extension. Electrical installation is excluded from this scope and will be managed separately by the laboratory. Due to prior engineering coordination, no substitutions or equivalent products are acceptable; only the identical specified equipment will be considered. Quotations must be submitted to Stephen Johnston by October 26, 2026, and must include itemized pricing for all nine items, manufacturer part numbers, lead times, and a proposed assembly schedule. The award is subject to the BSA General Terms and Conditions for Commercial Products and Services, Revision 25.0, and incorporates various FAR clauses regarding gratuities, domestic preferences, and reporting requirements. Payment terms are net 30 days from the submission of a proper invoice.

General Info

Request for quotations for specific Galaxy VS UPS equipment and services for BNL.

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

Upton, NY, 11973, USA

Set-Aside

NONE

Documents

2

BSA General Terms and Conditions for Commercial Products and Services (Rev 25.0)

PDF, High priority: read this firstcontract-document
High

Solicitation SJ484181: Building 50 UPS Equipment and Services

PDF, High priority: read this first2 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Brookhaven National Labor -Doe Contractor
Contacts1 person available
OfficeUpton, NY, 11973, USA
Office AddressUpton, NY, 11973, USA
Contacts

Full Description

Show more

Solicitation SJ484181 – Galaxy VS UPS Equipment and Related Services


Brookhaven Science Associates, LLC (BSA), operator of Brookhaven National Laboratory (BNL), requests quotations for Galaxy VS uninterruptible power supply (UPS) equipment, related components, manufacturer-performed assembly and start-up, warranty extension, and shipping to Upton, NY 11973.


The requirement includes:
• One Galaxy VS 15 kW, 208 V UPS with two internal 9 Ah smart modular battery strings and 5x8 start-up.
• One maintenance bypass cabinet.
• One cable and conduit box.
• Five additional 9 Ah smart modular high-capacity battery strings, for seven strings total.
• One modular battery cabinet accommodating up to six battery strings.
• One-year on-site UPS warranty extension.
• UPS and battery frame assembly services.
• Shipping and handling.


The complete configuration shall provide 155 minutes of runtime at an 8.25 kW load and 76.5 minutes at a 15 kW load.


No substitutions or equivalent products are acceptable. The specified configuration resulted from engineering coordination between BNL and the manufacturer. Other suppliers may submit quotations for the identical specified equipment and required services.


Assembly and start-up shall be performed by the manufacturer to preserve warranty coverage. Electrical installation will be handled separately by BNL and is excluded from this solicitation.


See the attached solicitation document for complete descriptions, quantities, and submission requirements. Identify delivery availability, lead times, and the proposed assembly and start-up schedule in the quotation.


Submit itemized quotations referencing SJ484181 to Stephen Johnston at sjohnston@bnl.gov by October 26, 2026, at 12:00 noon Eastern Time. Include manufacturer part numbers, pricing for all items and services, shipping and handling, total price, quotation validity, and any exceptions.


The attached BSA General Terms and Conditions for Commercial Products and Services at Brookhaven National Laboratory, Revision 25.0, dated September 10, 2026, will apply to any resulting award.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Energy → Brookhaven National Labor -Doe Contractor

Same awarding agency

NAICS: 334516
New
Federal
LT-SPM
Solicitation # BSA475591
Brookhaven Science Associates, LLC, operating Brookhaven National Laboratory for the Department of Energy, is soliciting quotations under RFQ 475591 for the design, fabrication, and installation of a Low-Temperature Scanning Probe Microscope (LT-SPM). This Firm Fixed Price contract, categorized under NAICS 334516 for non-commercial items, requires the integration of an LT-SPM into an existing multiprobe ultra-high-vacuum surface analysis system to enable scanning tunneling microscopy from 5 K to 500 K and atomic force microscopy at approximately 5 K. Key deliverables include a new SPM scanner, a sample stage with seven electrical contacts, a removable magnetic field assembly, and necessary internal electronics. The estimated contract value is 212,600 USD. The procurement process has undergone several amendments, with the final quotation deadline set for October 23, 2026, at 4pm Eastern Time. Award will be granted to the responsive and responsible offeror providing the lowest total price while meeting all technical requirements. Mandatory qualifiers for offerors include ISO 9001 certification or an equivalent quality system, a US-based service engineer network, and references for at least three successfully delivered LT-STM/QPlus AFM systems of comparable complexity. Performance timelines include design completion within 3 weeks after receipt of order, fabrication and delivery by 29 weeks, and on-site installation between weeks 37 and 42. Shipping must be FOB BSA National Laboratory, Freight Prepaid, adhering to ASTM Standard D 3951-10 packaging guidelines.
Analytical Laboratory Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 335999
New
Federal
CPMU - HRD Insertion Device
Solicitation # 481939
Brookhaven Science Associates (BSA) is seeking a contractor for the design, engineering, manufacturing, testing, and delivery of a Cryogenic Permanent Magnet Undulator (CPMU) for the High Resolution Powder Diffraction (HRD) beamline at Brookhaven National Laboratory in Upton, New York. This requirement will be conducted through full and open competition under NAICS code 335999 and PSC 6650. BSA intends to issue a solicitation by November 2026, with a planned award date around February 2027. The anticipated contract will be a firm-fixed price agreement, with final delivery required 24 months after the award. The selected contractor must adhere to strict technical and safety standards, including the use of cryogenic-compatible materials and CGA-compliant fittings. Key deliverables include the CPMU hardware, spares, and all associated control system source codes, such as EPICS and CSS/Phoebus. The project involves a rigorous quality and inspection process, featuring magnet acceptance tests at the contractor's facility and final acceptance testing at BNL. Specialized packaging and marking requirements are mandated to protect the equipment during transit, including the use of G-force shock indicators and the prohibition of peanut-type packing materials. Performance milestones include the submission of a program plan within two weeks of award and a manufacturing, inspection, and test plan within 60 calendar days.
All Other Miscellaneous Electrical Equipment and Component Manufacturing

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS