Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 18, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Garrison Dam Spillway Modifications

Closed
W9128F23SC012-2Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 15 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 15 hours ago

DEADLINE

in about 15 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 15 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 20 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Riverdale, ND, 58565, USA

Set-Aside

NONE

Documents

2

Garrison Dam Spillway Modification Industry Day Sign-In Sheets

PDF, Low priorityindustry-day
Low

Garrison Dam Spillway Modification Project Industry Day Handout

PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Micah Sugiura
Nadine Catania

Full Description

Show more
**Sign-In sheets for on-site Industry Day have been added as an attachment. The handout for the on-site Industry Day has also been added.** ON-SITE INDUSTRY DAY NO. 1 FOR GARRISON DAM SPILLWAY MODIFICATIONS This announcement provides details for the upcoming On-Site Industry Day. This notice does not constitute a solicitation. This announcement and the Industry Day event are for planning purposes only. Response to this notice is strictly voluntary. The Government will not reimburse any party attending or participating for costs incurred for this event or marketing efforts. The U.S. Army Corps of Engineers, Omaha District, On-Site Industry Day event will take place from 8:00 AM to approximately 12:30 PM CT on October 11, 2023. The On-Site Industry Day will start with an overview at City Hall and then a site tour of the site. The Address for the Industry Day is: Garrison Dam, ND *Initial briefing will be conducted at Pick City Hall started at 8:00 a.m. Central Time. Pick City Hall 18 1st Ln SE Pick City ND, 58545 Industry Day will be held: October 11, 2023 8:00 a.m. - 12:30 p.m. Central Time Industry Day Attendance: The event is free of charge and all interested parties are invited to attend. To be allowed entrance to the event, you must provide the following information to Micah Sugiura and Nadine Catania at micah.n.sugiura@usace.army.mil and Nadine.L.Catania@usace.army.mil NLT the dates provided below: Foreign (non-US) Citizens, provide the following information by 3:00 pm Central Time on September 20, 2023: (1) Full name, (2) Position and Affiliated Organization, (3) Scanned copy of passport. All other Attendees, provide the following information by 3:00 pm Central Time on September 30, 2023: (1) Full Name and (2) Position and Affiliated Organization. **Photography will be restricted to specific areas pertaining to the project scope of work. Attendees taking unauthorized photographs will be escorted from the premises. There will be no individual or unescorted tours** One-on-One Meetings via WebEx: Prime contractors and major subcontractors can request a one-on-one meeting with the government team to provide feedback and/or recommendations on this project only and is strictly voluntary. The information provided by the contractors at each meeting will be maintained within government controls and will not be released outside of the government team for this project. These meetings are intended to provide contractors the opportunity to provide information directly to the government team. The government team will provide any government information that results from the on-site and one-on-one meetings that has not been previously provided by the government to ensure equal access of government information for this project. Contractors must provide the following information to Micah Sugiura and Nadine Catania at micah.n.sugiura@usace.army.mil and Nadine.L.Catania@usace.army.mil by 3:00 pm Central Time on October 11, 2023. No other dates will be scheduled. Times for one-on-one meetings will be assigned on a first-come basis. Full names of all participants, positions and affiliated organization. Three (3) requested times for meeting. Times for One-on-One Meetings October 17, 2023 October 18, 2023 October 19, 2023 9am - 9:45am 9am - 9:45am 9am - 9:45am 10am - 10:45am 10 am - 10:45am 10 am - 10:45am 11am - 11:45am 11am - 11:45am 11am - 11:45am 1pm - 1:45pm 1pm - 1:45pm 1pm - 1:45pm 2pm - 2:45pm 2pm - 2:45pm 2pm - 2:45pm *All meetings are Central Time The government team will provide a meeting invite with the selected time and details for the WebEx one-on-one meeting. Requested changes to the meeting date and time by the contractor after establishment of the meeting could result in no meeting with the contractor due to scheduling conflicts. Prime construction contractors and major subcontractors are encouraged to provide information about this project to the government team. The one-on-one meeting with contractors is NOT to be used for contractors to submit their capability briefings to the team. The meetings shall be used for prime contractors and major subcontractors to provide insight into this project and any potential concerns with this project. Interested contractors may submit clarification requests to the Contracting Officer by October 13, 2023. USACE will endeavor to consolidate and post answers to clarification requests to SAM before COB on October 16, 2023 [NOTE: Clarification requests and the USACE answers will not be confidential]. Industry Questions and Comments: ALL inquiries and questions related to this Industry Day are to be submitted to Micah Sugiura and Nadine Catania at micah.n.sugiura@usace.army.mil and Nadine.L.Catania@usace.army.mil. Comments will be accepted via email November 3, 2023. Background The U.S. Army Corps of Engineers (USACE) is requesting input from contractors on constructability and contracting elements of the Recommended Plan for spillway modifications from the Garrison Dam, Dam Safety Modification Study (DSMS). The DSMS was completed, and the project has officially transitioned from the feasibility study phase to the Preconstruction Engineering and Design (PED) phase. Basic project information and critical construction constraints are provided below. Garrison Dam is one of six USACE owned and operated mainstem dams on the Missouri River mainstem system (System). It is a high hazard potential dam located in McLean and Mercer Counties, North Dakota (ND). The authorized purposes provided by Garrison Dam and the Missouri River System include flood risk management (FRM), hydroelectric power, water supply, water quality control, irrigation, recreation, navigation, and fish and wildlife. Construction was completed from the fall of 1947 through the spring of 1954. The reservoir behind Garrison Dam (Lake Sakakawea) is the largest USACE reservoir and the third largest reservoir in the U.S. When full (at the base of the Annual Flood Control and Multiple Use Zone), the reservoir is 178 miles long and up to 6 miles wide. At elevation 1855.2 feet North American Vertical Datum of 1988 (NAVD88), the top of the Exclusive Flood Control Zone, the reservoir storage capacity is 23.5 million acre-feet (MAF). This volume is almost a third of the total storage capacity of the System. A failure of either the Garrison Dam embankment or spillway during a maximum high pool would result in widespread, long-lasting, and catastrophic consequences impacting 11 states and approximately 2,000 river miles (not including backwater areas up tributaries) extending from North Dakota to Mississippi. Garrison Dam is classified as having a Dam Safety Action Classification (DSAC) 2 (High Urgency) primarily due to the severity of incremental consequences that would occur during an uncontrolled reservoir release. Garrison Dam currently has a total of six risk-driving Potential Failure Modes (PFMs) that are associated with the spillway. As a result of these PFMs and the associated significant consequences that would result from a spillway failure, risks at the project do not meet the USACE Societal Tolerable Risk Guideline (TRG). Project Information The project consists of a zoned earthfill dam, outlet works, spillway, and reservoir. The main embankment generally runs east-west and is approximately 12,000 feet long with a maximum height of 210 feet. The dam has a crest width of 60 feet with a design crest elevation of 1,876.2 feet NAVD88. The outlet works includes an approach channel, intake structure, powerhouse with five power tunnels, three regulating (flood-control) tunnels, a regulating tunnel stilling basin, and a tailrace discharge channel. The crest and spillway bridge occupy ND State Highway 200 which is a major highway through central North Dakota. The approximately 3,000-foot-long spillway is excavated in the left abutment with a design crest elevation of 1,826.2 feet NAVD88. The chute-type spillway structure consists of a crest structure (including Tainter gates and a bridge), paved chute channel, and a stilling basin. The chute transitions from a width of 1,336 feet at the crest to 800 feet wide in the upper half of the spillway and maintains the 800 feet width through the lower half of the chute and stilling basin. The updated Probable Maximum Flood (PMF) in 2020 resulted in decreased freeboard at the dam from 13.8 to 1.4 feet and increased spillway peak discharges from the original design discharge of 827,000 cubic feet per second (cfs) to 1,150,000 cfs. The spillway underdrain system consists of a herringbone pattern of nine lateral vitrified clay pipe drains connected to three longitudinal drains situated under the frost blanket (drainage material) beneath the reinforced concrete spillway chute slab. There are 27 manholes in the chute at the intersections of the lateral and longitudinal drains. The Recommended Plan approved in the DSMS for PED consists of: A full replacement of the spillway drainage system through selective demolition of the existing chute slab at designated new lateral drain locations. A reinforced concrete overlay throughout the entire chute and stilling basin. Armoring the area behind the chute walls. Raising the spillway abutment monoliths. Constructing a deflector beam to deflect the overflow nappe from gates and modifying the gate trunnion hubs. Rehabilitation of the spillway gate deicing system and additional intervention measures to facilitate gate deicing. An additional line of drains on the west abutment above the powerhouse. The total project cost of the Recommended Plan is between $500 million and $1 billion A substantial majority of this project is composed of the following (quantities are preliminary, approximate, and subject to change): 400,000 cubic yards (CY) conventional reinforced concrete for new slab overlay, stilling basin modifications, and armoring behind the chute walls. 100,000 CY of mass concrete (either roller compacted concrete or controlled low-strength material/Flowable fill). 70,000 tons of reinforcing steel. Modern spillway slab joint details including 125,000 linear feet (LF) of waterstops. 600,000 CY of excavation. 16,000 LF of 18-inch high-density polyethylene (HDPE) lateral drain with two-stage filter. 4,700 LF of conventional concrete inspection/maintenance galleries (2,350 LF on each side of the spillway chute). 1,600 grouted passive rock anchors (average length 90 feet each). 150 post-tensioned anchors (baffle blocks and end sill) (average length 120 feet each). 28 tainter gate modifications on crest structure. Critical Construction Considerations: Construction Work Window: The base estimate/schedule assumes construction will occur between approximately May to the end of October each year. Due to the limits on the construction season and length of construction there is risk that weather and/or flood delays could impact construction duration. Flood Risk Management During Construction: Flood water can pass through Garrison Dam via the powerhouse, the regulating tunnels (up to approximately 100,000 cfs) or through the spillway. The bulk of the construction activities will be occurring within the spillway. Contractor exposure will be limited based on the amount of flood risk that exists. The flood season overlaps the assumed construction season in the months of May, June, and July. The spillway was only used in 2011, 2018, and 2019 in the life of the dam to discharge water as a result of high runoff events into the reservoir. Construction Sequencing: In addition to the flood risk management during construction considerations within the spillway work area, the Contractor will have to coordinate major construction work activities in similar general working areas such as the gate control structure modification, the drainage system construction, and the concrete overlay placements. Materials availability and testing to meet project requirements: Coarse aggregate quality is a concern and a materials availability and mix design investigation in the early PED stages will be important to determine if satisfactory locally sourced material is available. Coarse aggregate may need to be imported to the site from longer than anticipated distances. Concrete Delivery: Concrete delivery challenges are possible due to contractor limitations discussed above and physical site constraints such as equipment accessibility within the spillway chute and 115 KV and 230 KV transmission line interferences. The transmission lines need to be further investigated to determine the minimum acceptable clearances to determine how equipment such as cranes or pump trucks will be impacted. These impacts may dictate concrete delivery methods and concrete placement production rates. Spillway Chute Wall Excavation: Stability of the excavated cutslope behind the chute wall for construction of the gallery and drainage system features will be evaluated in the early PED phases to determine what type of slope stability support measures such as structural shotcrete and soil nail walls are required to maintain a stable and safe work area. Also, the extents of excavation may be limited by any flood risk impacts from the open excavation which would impact construction sequencing, production rates, and correspondingly the construction schedule. Dewatering: Construction work in the lower spillway chute and the stilling basin will require dewatering of about 60 feet of surrounding groundwater levels. The Government intends to perform a dewatering investigation in PED to inform the dewatering design. Dewatering systems design and construction sequencing will be critical design elements that will impact overall construction schedule and cost considerations. A cofferdam shall be constructed downstream of the stilling basin to prevent the powerhouse discharges from inundating the stilling basin during dewatering operations. Tainter Gate Construction Risks: There are risks with how many gates can be taken out of service at one time for retrofits and accessibility for the proposed work. This may impact the project's ability to pass flood water and correspondingly impact construction production. Also, Contractor must ensure that the Tainter gates meet the requirements of ER 1110-2-8157 to allow personnel to work downstream of the gates. There are currently 28 stoplogs onsite that can be utilized during construction for Tainter gate repairs. Operational Constraints: The dam will be operated in accordance with the approved water control plan during construction. Operations at the dam have not been modified as part of the study. The existing spillway that is being modified will be required to be operational for emergency flood releases if it is needed. Access/Haul Roads and Batch Plant Locations: The Government has identified locations of possible access roads, disposal areas, laydown areas, batch plant locations, etc. for Contractor consideration. Location of critical construction site features may vary between contractors depending on planned construction sequencing and construction plans by each contractor. The Government intends to get input from prospective bidders on possible construction site feature locations. Project Labor Agreement The U.S. Army Corps of Engineers, Omaha District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for this large-scale construction project (exceeding $35 million). Provide your response by 4:00pm CT on November 3, 2023, to Nadine.L.Catania@usace.army.mil. In the Subject Line of your response include PLA Survey - Garrison Dam Spillway Modifications. Please provide your contact information in the body of the email. A PLA is defined as a pre-hire collective bargaining agreement between a Prime contractor and one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S. C. 158(f). Federal Acquisition Regulation (FAR 22.503) Policy provides that: Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. An agency may, if appropriate, require that every contractor and subcontractor, or certain subcontractors, engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards and other matters; and Be consistent with law. Reference: FAR 52.222-33 Notice of Requirement for Project Labor Agreement; FAR 52.222-34 Project Labor Agreement. Please provide responses to the following questions: Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the reference project? If so, please elaborate and provide supporting documentation where possible. Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. Identify specific reasons why you believe a PLA would advance or hinder the Federal Governments interest in achieving economy and efficiency in federal procurement. Would inclusion of PLA in the solicitation cause your company to not to submit an offer for this project? Identify any additional information you believe should be considered in the decision to use a PLA on the referenced project. The information gathered in this survey should include the following information on projects completed in the last 5 years: 1. Project Name and Location 2. Detailed Project Description 3. Initial Cost Estimate vs. Actual Final Cost 4. Was the project completed on time? 5. Number of craft trades present on the project 6. Was a PLA used? 7. Were there any challenges experienced during the project

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS