Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Gate Installation (Steel Tubular)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply and installation of steel tubular gates at designated access points, with all components including hinges, latches, and alignment systems required to meet detailed technical specifications. The work must be executed precisely to ensure functionality, durability, and compliance with safety and operational standards set by the contracting authority. All materials and hardware are to be furnished and installed as a cohesive system, with emphasis on proper fit, alignment, and long-term reliability under environmental and usage conditions. This is a subcontract opportunity issued by the Colorado Division of Parks & Wildlife under NAICS code 332312, with a response deadline of July 30, 2026, and a posting date of July 14, 2026. The place of performance is within Colorado, though specific locations are not detailed in the provided data. There is no set-aside designation specified, and the contract is open to general subcontractors capable of delivering and installing steel gate systems according to the required standards. Interested parties must submit proposals through the provided online portal by the stated deadline.

General Info

Supply and install steel tubular gates with all hardware to meet technical and safety standards in Colorado by July 30, 2026.

Agency

Colorado → DNR - Division Of Parks & WildlifeView Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyColorado → DNR - Division Of Parks & Wildlife
ContactsNo contacts available
OfficeN/A
Organization / Agency
Colorado → DNR - Division Of Parks & Wildlife
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of steel tubular gates at access points, including hinges, latches, and alignment per specifications.

Similar Contracts

Same NAICS industry code

NAICS: 332312
New
DIBBS
BEAM, STRUCTURALThis procurement specifies a structural beam made of aluminum alloy 7075 in temper T6511, meeting exact dimensional requirements and strictly conforming to specified technical standards including SAE AMS4154S, ASTM B666/B666M-20, ASTM B660-23, and AMS-QQ-A-200C. Only suppliers listed on the Qualified Suppliers List for Distributors (QSLD) are eligible for award, and any deviation from this requirement must be explicitly declared; failure to comply constitutes an unauthorized substitution with potential criminal penalties. A Certificate of Quality Compliance, or mill certification, must accompany every shipment and be forwarded to the designated DLA Troop Support Contracting Officer. Packaging must adhere to MIL-STD-2073-1E with preservation per ASTM B660, marking compliant with MIL-STD-129, and no use of parcel post—shipment must be traceable. The item is subject to firm fixed pricing with zero variance allowed in quantity, and inspection and acceptance occur at the destination. Delivery is required within 60 days after award, with the specified delivery point at Fort Irwin, California. Government identification must be removed from non-accepted supplies, and references to source inspection, quality conformance inspections, and related requirements are waived under this solicitation as it falls under the QSL program. All technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements, with the applicable revision determined by the solicitation or amendment date.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 18 hours ago

DEADLINE

in 6 days
View Details
NAICS: 332312
New
DIBBS
FITTING, STRUCTURAL COMPONENT, AIRCRAFTThis contract, issued under solicitation SPE4A6-26-R-XB50 by the DLA Aviation ASC Commodities Division, is a small business set-aside for the procurement of a structural aircraft fitting designated as a critical safety item with NSN 1560-01-271-9174 and part number S03-02-R-100, manufactured in accordance with drawing 7574876, revision A dated 09/09/1987. The contract is an indefinite-quantity type with a total value cap of $250,000 over a five-year term, requiring delivery of production units to various CONUS stock locations via DLA distribution depots. A mandatory first article test (FAT) is required for the initial unit to be delivered within 90 calendar days to the test facility at Hill Air Force Base, Utah, with the Government conducting inspection at source and acceptance at destination under FOB destination terms. The contractor must submit a completed FAT report marked with the contract and lot number, signed and accompanied by a system of record receiving report and written confirmation that the same manufacturing processes and facilities will be used for production, sent to the appropriate DLA oversight office based on the awarding activity. The contractor is required to maintain an acceptable inspection system compliant with FAR 52.246-2 or 52.246-3, retain all quality records, and notify the contracting officer and DCMA at least 14 days prior to shipment. Government-performed FAT units must be shipped using traceable methods with specific labeling as “First Article Exhibits – Do Not Post to Stock,” accompanied by full documentation including drawings, certifications, and a pre-paid return label. All packaging and marking must strictly comply with MIL-STD-129, ASTM D3951, and the DLA Master List of Technical and Quality Requirements, with hazardous materials properly labeled per 29 CFR 1910.1200. Sampling and quality verification must follow MIL-STD-1916, ASQ H1331 Table 1, or a comparable zero-based plan, with critical attributes requiring zero non-conformances. The contract incorporates numerous FAR and DFARS clauses, including prohibitions on contracting with entities requiring confidentiality agreements, cybersecurity safeguards under 252.204-7012, Buy American requirements, restrictions
ASC COMMODITIES DIVISION

POSTED

about 18 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Colorado → DNR - Division Of Parks & Wildlife

Same awarding agency