Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

General Construction Site Support & Management

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The General Construction Site Support and Management subcontract, issued by the Department of Defense under agency FA4528 5 Cons, provides administrative and site support for prime contractors on MACC facility projects at Minot AFB. The scope of work includes the implementation of project-specific Accident Prevention and Safety Plans, the execution of Quality Control management, and the production of red-line and final as-built drawings using CAD software. To ensure compliance, the contractor must provide a comprehensive QC Plan and a dedicated Site Superintendent. This opportunity is a total Small Business Set Aside under NAICS code 541330. Key deliverables include approved Safety Plans, detailed QC reports, and final as-built drawings. Interested parties must submit their responses by the deadline of September 28, 2026.

General Info

DoD subcontract for site support, safety, and QC management at Minot AFB.

Agency

Department Of Defense → FA4528 5 ConsView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Minot AFB, ND, 58704, USA

Set-Aside

SBA

Documents

This scope was carved out of FA452826R0002.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Minot Air Force Base Multiple Award Construction Contract (MACC) IDIQ

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4528 5 Cons
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA4528 5 Cons
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs general site requirements and administrative support for prime contractors on MACC facility projects. Implements project-specific Accident Prevention/Safety Plans, executes Quality Control (QC) management, and creates red-line and final as-built drawings using CAD software. Requires a comprehensive QC Plan and a Site Superintendent. Delivers approved Safety Plans, QC reports, and final as-built drawings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing various engineering supports including civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include utility locating, potholing, geotechnical and geophysical investigations, BIM/3D modeling, land surveying, LIDAR, drone services, and comprehensive environmental services such as permitting, compliance monitoring, and hazardous materials surveys. Project management needs include CPM scheduling and commissioning and startup planning. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid via the Building Connected system. The bid deadline is September 11, 2026. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse the bond premiums. This solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Kiewit, a signatory to several collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Department Of Defense → FA4528 5 Cons

Same awarding agency

NAICS: 238220
New
Federal
Boiler Maintenance
Solicitation # FA452827QAS002
Solicitation FA4528-27-Q-AS-02 is a firm-fixed-price request for quotation for boiler maintenance services at Minot AFB, North Dakota, set aside 100% for small business concerns under NAICS 238220. The contractor is responsible for providing all management, labor, tools, and equipment to perform preventive and corrective maintenance, as well as inspections for 94 existing boilers and water heaters across 71 facilities. The scope of work includes monthly, quarterly, and annual maintenance tasks, emergency response, and the removal and installation of up to 12 new boilers per year, with a limit of two installations every 30 days. Additionally, the contractor must maintain any new boilers for the duration of their one-year warranty. The contract structure consists of a base year with four option years and a potential six-month extension. Award is based on best value, evaluating technical capability on a pass/fail basis, price, and past performance, which is considered approximately equal in importance to price. Performance is monitored by the Contracting Officer's Representative through a rating system ranging from unsatisfactory to exceptional. Contractors must comply with Service Contract Act wage determinations and specific hazardous material handling regulations per 49 CFR 171-178. All payment requests are processed electronically through the Wide Area WorkFlow system.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in about 13 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS