Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

General Earthwork and Site Clearing

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for General Earthwork and Site Clearing supports water recharge projects for the Madera County GSA in Chowchilla, California. The scope of work involves comprehensive site preparation services, including clearing and grubbing, excavation, trenching, backfilling, and compacting. Additionally, the contractor is responsible for soil stabilization, the placement of riprap, dewatering, and the active management of water and dust control throughout the excavation process. The project aims to deliver a fully prepared site featuring stabilized slopes and completed excavated trenches. Interested parties must note that the response deadline for this opportunity is December 11, 2026. The work falls under NAICS code 238910 and is designed to support prime contractors in executing these critical infrastructure improvements.

General Info

Earthwork and site clearing for Madera County water recharge projects due December 11, 2026.

Place of Performance

Chowchilla, CA, 93610, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-02-GSA.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Madera County GSA Chowchilla Subbasin Recharge Project 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 25 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Madera County GSA Chowchilla Subbasin Recharge Project 2
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Madera County GSA
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site clearing, excavation, and soil stabilization for prime contractors on Madera County GSA water recharge projects. Executes clearing and grubbing, trenching, backfilling, compacting, dewatering, and placement of riprap. Manages water and dust control during excavation. Delivers a prepared site with excavated trenches and stabilized slopes.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 15 hours ago

DEADLINE

in 16 days
View Details

More opportunities from California → Madera County GSA

Same awarding agency

NAICS: 237110
New
SLED
Madera County GSA Chowchilla Subbasin Recharge Project 2
Solicitation # 26-02-GSA
The Madera County GSA Chowchilla Subbasin Recharge Project 2 is a construction solicitation for the installation of a water pipeline and associated infrastructure in Chowchilla, California. The scope of work includes furnishing all labor, materials, and equipment for piping, reinforced concrete pump sumps, control boxes, agricultural and basin turnouts, diversions, valves, and fittings. The project also requires trench excavation, backfill, paving repairs, earthwork, revegetation, and the installation of fencing and gates. Additionally, the contractor must drill and develop a dual completion monitoring well with a minimum 8.75-inch diameter test hole, eventually converted to a permanent well using 2-inch Schedule 40 PVC casing and screen. The contract will be awarded to the lowest responsible bidder, requiring a bid security of at least 10 percent of the maximum bid amount. Successful bidders must provide performance and payment bonds equal to 100 percent of the bid. Performance is governed by a monthly schedule where no single activity exceeds 20 days, and the contractor must adhere to ACI, ASTM, and California Building Code standards. Key deliverables include modified operation and maintenance manuals, one hour of personnel training on field instrumentation, and a recommended spare parts list. Compliance with California prevailing wage laws, ADA regulations, and strict stormwater sampling and preservation protocols is mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS