Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

General Plan Amendment to Policy 2.A.1

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Woodland

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Various: Road 18C and Road 101; Road 101 and Churchill Downs; and HWY 16 and Road 98, Woodland, CA, 95695

Set-Aside

NONE

Documents

(9)

City of Woodland General Plan Amendment NOP for Draft SEIR

PDFnotice-of-preparation

City of Woodland Draft Supplemental Environmental Impact Report Notice of Availability

PDFspecial-notice

City of Woodland General Plan Amendment Public Draft Supplemental Environmental Impact Report December 2025

PDFenvironmental-impact-report

NAHC Comment Letter on Yolo County General Plan Amendment 2013032015

PDFcomment-letter

General Plan Amendment Supplemental Environmental Impact Report Summary

PDFenvironmental-summary

2013032015_RWQCB Comment on NOP for Draft EIR Yolo County

PDFcomment

Notice of Completion for City of Woodland General Plan Amendment

PDFnotice-of-completion

Notice of Completion for General Plan Amendment to Policy 2.A.1 - SCH #2013032015

PDFnotice-of-completion

City of Woodland 2035 General Plan SEIR Appendices

PDFenvironmental-impact-report-appendix

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Woodland
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Woodland
Office AddressN/A
Contacts
City of Woodland Community Development DepartmentDeputy Community Development Director
Nicole WilliamsSenior Environmental Planning Program Manager

Interested Companies (1)

Show more
Aecom
Southfield, Michigan

Full Description

Show more
The City is considering an amendment to Policy 2.A.1 in the General Plan (“the proposed project”). The amendment would allow the City to provide utilities (i.e., potable water, wastewater or recycled water) up to one mile beyond the Urban Limit Line (ULL) to existing commercial facilities in operation on or prior to November 3, 2026. The City’s current boundaries are circumscribed by a permanent ULL established by a vote of the people in 2006. The approved initiative placed restrictions on the provision of utility services outside the ULL. The ULL boundary and provisions of utility services outside the ULL may only be modified by another vote by the people. Amendment to Policy 2.A.1 would be subject to voter approval of an amendment to the ULL. The City is considering including a measure on the November 2026 ballot that would amend the ULL to allow the expansion of existing City utilities to commercial facilities located on parcels with a boundary that falls wholly or partially within one mile of the ULL and in operation on or prior to November 3, 2026. The SEIR will be prepared to provide additional information needed to address the proposed project, in addition to that which was provided in the City’s 2035 General Plan and CAP EIR (State Clearinghouse #2013032015 and adopted and certified on May 16th, 2017). It is anticipated at this time that two existing commercial facilities located within unincorporated Yolo County would make use of the utility extension, if the ballot measure passes. These two existing commercial facilities are Bayer U.S. Crop Science, LLC (located at 37437 CA-16, Woodland, CA 95695, APN#025-470-038-000) and Clark Pacific (located at 40600 County Road 18C, Woodland, CA 95776, APN#027-250-028-000). The ballot measure would not require either Bayer or Clark Pacific to extend utility facilities and services.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS