Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

General Plan Amendments for the Open Space Element and the Implementation Work Program

Forecast
NOE_Open Space_20251211_FINALState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Elk Grove

Place of Performance

Elk Grove, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Elk Grove
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Elk Grove
Office AddressN/A

Full Description

Show more
The Project consists of General Plan amendments to the Open Space Element and the Implementation Work Program. The text amendments to the Open Space Element address statutory requirements included in Senate Bill 1425, addressing equitable access for all residents to open space, climate resilience and co-benefits of open space, and rewilding opportunities. Edits to the Implementation Work Program include removal of completed actions, updates to language and progress on actions, and clarifications of responsibilities.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP For Preparation Of An Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 7 hours ago

DEADLINE

in 19 days
View Details
NAICS: 541620
New
Federal
BioWatch Program
Solicitation # 70FA4027I00000005
The Department of Homeland Security (DHS) and FEMA are seeking information to identify sources capable of providing staffing and operational support for the BioWatch Program, a civilian biodetection system that monitors for aerosolized biological agents in over 30 metropolitan areas across the United States. The primary objective is to secure a contractor to manage daily field operations, including the cleaning, installation, collection, and transport of Filter Holder Assemblies (FHAs) and the maintenance of Portable Sampling Units (PSUs). The required support includes providing a Program Manager, jurisdictional leads, and field staff capable of operating 24/7/365, with the flexibility to support surge operations and special events on as little as 24 hours' notice. The anticipated contract will consist of a one-year base period with four one-year option periods, with a projected start date of February 1, 2027. Key requirements include the provision of local office space, strict adherence to the Field Operations Standard Operating Procedure (SOP) and Quality Assurance Program Plan (QAPP), and the implementation of robust recruitment and retention strategies to maintain high staffing levels. All personnel must pass background checks, sign non-disclosure agreements, and be capable of lifting fifty pounds. The government is utilizing this RFI to evaluate contractor capabilities in managing geographically dispersed operations, "Train the Trainer" programs, and government-furnished property inventory management.
Support Services SECTION(SS40)

POSTED

about 8 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541620
New
SLED
Certified Arborist Services for Twin Lakes Pump Station Pipeline Project
Solicitation # 2026-RFP-053
The Las Virgenes Municipal Water District is soliciting proposals for certified arborist services to support the Twin Lakes Pump Station Pipeline Project in the Chatsworth area of Los Angeles. The project involves the construction of a new 16-inch water transmission pipeline, with portions of the work located within or adjacent to areas containing protected trees, including those in Chatsworth Park. Because the original Protected Tree Report was completed in 2019, the District requires a qualified arborist to update the report to reflect current site conditions and project design, provide updated protection recommendations for construction documents, and offer consultation and monitoring during the anticipated 280-day construction period. The selected consultant will be responsible for ensuring compliance with the City of Los Angeles Protected Tree Ordinance No. 177404 and Recreation and Parks Tree Protection Specifications. Key deliverables include the implementation and documentation of mitigation planting, specifically the planting of eight 24-inch box Coast Live Oaks to replace trees 352 and 355, and the subsequent monitoring of these mitigation trees for a three-year survivability period. Administratively, the consultant must submit monthly itemized statements for payment within 45 days and adhere to California Labor Code requirements regarding workers compensation and prevailing wages. All work must be performed under standard engineering and industrial safety rules, with the District General Manager or a designee serving as the primary agency representative.
Engineering & Facilities

POSTED

about 21 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541620
New
International
IM27TDA001 YR1 - EMS Conformance Monitoring of BC Timber Sales Licensee Harvesting Operations in the Dawson Creek and Fort St. John TSAs
Solicitation # IM27TDA001 YR1
Contract IM27TDA001 YR1 involves the provision of Environmental Management System (EMS) Conformance Monitoring services for BC Timber Sales (BCTS) Licensee Harvesting Operations within the Dawson Creek and Fort St. John field teams in British Columbia. The scope of work requires the contractor to conduct EMS and Sustainable Forest Management (SFM) inspections to evaluate timber harvest and road activity conformance regarding environmental protection measures, legal and contractual requirements, and site-specific operational prescriptions. Key deliverables include the use of official EMS inspection forms, follow-up field assessments to verify corrective actions, and the communication of risks to public health, safety, or the environment to BCTS officials. The contract is awarded to the lowest priced compliant tender, with eligibility requiring certification in the BC Forest Safety Council SAFE Company program. Performance is governed by the BCTS EMS Manual and the Forest and Range Practices Act, with a term extending from the date of signing until March 17, with a possible twelve-month extension. The contractor must ensure all personnel meet the BCTS LPC Training Matrix requirements and maintain strict confidentiality of operational information. Payment is processed via direct deposit or check within thirty days of invoice receipt, and the Province maintains the right to inspect work at any time without notice to ensure compliance.
BC Timber Sales Branch

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS