Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Generator for Lakes of Taylor Golf Carts

Active
BAFO-9-4-26-20State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Taylor, Michigan, is seeking proposals for a turnkey diesel backup generator system to support the charging requirements of 80 Club Car Tempo Lithium-Ion golf carts. The required system must provide a 3-phase diesel capacity between 50 and 75 kW to handle connected loads ranging from 52 kW to 72 kW. The comprehensive solution must include the generator unit, an automatic transfer switch, a fuel tank providing 24 to 48 hours of runtime, a concrete mounting pad, and all necessary electrical distribution and weatherproof enclosures. Selected vendors will be responsible for the full project lifecycle, including site assessment, electrical engineering, permitting, installation, load testing, and operator training. Proposals must include detailed technical specifications, load calculations, and itemized pricing for all equipment and labor. This solicitation, identified as BAFO-9-4-26-20, requires submissions by October 5, 2026, and is managed by the City of Taylor Purchasing Department.

General Info

City of Taylor seeks turnkey 50-75kW diesel generator system for golf cart charging.

Agency

Michigan → ProcurementView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

MI, USA

Set-Aside

NONE

Documents

(1)

Generator for Lakes of Taylor Golf Carts.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → Procurement
Contacts1 person available
OfficeTaylor, MI, 48180, USA
Organization / Agency
Michigan → Procurement
View Agency Profile
Office AddressTaylor, MI, 48180, USA
Contacts
Ben ClaytonPurchasing Manager

Interested Companies (6)

Show more
Moore,Cheryl/Cheryl Moore Enterprises
Pontiac, MI
DASEN Consulting
Avon, Indiana
POSHnFIT
Detroit, MI

See All 6 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
REQUEST FOR PROPOSAL (RFP) Backup Generator System for 80 Club Car Tempo Lithium‑Ion Golf Carts City of Taylor, Michigan — Purchasing Department September 2026 1. Purpose The City of Taylor is soliciting proposals from qualified vendors to provide, install, and commission a diesel backup generator system capable of supporting the full charging load of 80 Club Car Tempo Lithium‑Ion golf carts . This RFP seeks competitive pricing, technical specifications, installation plans, and warranty information for a turnkey backup power solution. 2. Background The City operates a fleet of Club Car Tempo Lithium‑Ion golf carts , each equipped with either 650W or 900W onboard chargers. To ensure operational continuity during outages, the City requires a generator system capable of powering all 80 chargers simultaneously or through load‑managed distribution. 3. Technical Requirements A. Power Capacity Vendors must size generators based on the following load profile: 650W chargers → 52 kW connected load 900W chargers → 72 kW connected load Diversity factor: 70–85% Required generator capacity: 50–75 kW , 3‑phase diesel B. Acceptable Generator Types Proposals may include any generator meeting the above capacity. Examples of acceptable units include: C. System Components Proposals must include: Generator unit Automatic transfer switch (ATS) Fuel tank (minimum 24–48 hours runtime) Concrete pad or mounting solution Electrical distribution integration Load management system (if applicable) Weatherproof enclosure All wiring, conduit, breakers, and panels Startup testing and commissioning D. Installation Requirements Vendor must provide: Site assessment Electrical engineering drawings Permits and inspections Delivery and offloading Full installation Load testing Operator training 4. Proposal Submission Requirements A. Technical Proposal Include: Generator Specification Sheet Load Calculation Summary Installation Plan Fuel & Runtime Details ATS Specifications Maintenance Schedule B. Pricing Proposal Provide itemized pricing for: Generator unit ATS Fuel tank Concrete pad / mounting Electrical installation Labor Freight Optional accessories Annual maintenance contracts All pricing must be firm and final .

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
On-Call Telecommunication Installation Services
Solicitation # 3121530
The University of Kansas has issued a solicitation for On-Call Telecommunication Installation Services, identified by solicitation number 3121530. This procurement process is conducted electronically through the Euna Procurement system powered by Ion Wave. Interested bidders must adhere to a strict submission timeline, with the response deadline set for October 2, 2026. The solicitation requires a comprehensive response through the electronic platform, specifically utilizing the Attributes tab for most responses, the Activities tab for key milestones, and the Response Attachments tab for all necessary documentation. All red-starred mandatory fields must be completed to ensure a valid bid submission. The contractual framework is governed by specific legal and operational provisions, including the University of Kansas Contractual Provisions, which address liability disclaimers under the Kansas Tort Claims Act, anti-discrimination compliance, and governing law. Bidders are subject to detailed solicitation instructions regarding the negotiated procurement process, pricing policies, and the evaluation discretion of the Procurement Negotiation Committee. Additionally, the contract includes a Supplier Travel and Expense Reimbursement Addendum that outlines strict protocols for the reimbursement of necessary and pre-approved travel costs. While not a requirement for consideration, the university also offers an opportunity for suppliers to propose a Strategic Partnership to align with the university's values and community resources. All inquiries regarding the commodity or requirements should be directed to the assigned Procurement Officer, while technical system issues should be routed to the designated Ion Wave support contacts.
University Of Kansas

POSTED

about 13 hours ago

DEADLINE

in 27 days
View Details
NAICS: 238210
New
SLED
Prequalification for Job Order Contract (JOC) for Electrical Services
Solicitation # 280-3130501-TS
This solicitation is a prequalification for a Job Order Contract (JOC) specifically for electrical services to be performed at various locations throughout John Wayne Airport in Santa Ana, California. The contract is issued by the John Wayne Airport agency under the state of California and has a total not-to-exceed amount of $1,000,000. Interested parties must submit their responses by the deadline of September 16, 2026. The procurement process is managed by the Orange County government, with primary contact information provided for a Professional Engineer and a Contracts Manager to assist with inquiries regarding the solicitation. Compliance with public works labor standards is a critical component of this contract, as governed by the Orange County District Attorney's Office Public Works Unit. Contractors are required to adhere to California Labor Code Section 1776, which mandates the maintenance of accurate certified payroll records to ensure fair wages. The legal framework includes strict requirements for payroll record accuracy and the submission of declarations under penalty of perjury. Failure to comply with these labor code regulations or the falsification of records may result in penalties and cooperation with state enforcement agencies to ensure full adherence to public works labor compliance standards.
John Wayne Airport

POSTED

about 16 hours ago

DEADLINE

in 11 days
View Details