Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on December 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Generator Purchase DR 4579

Closed
PE-77197-NONST-2025-000000005State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the procurement and installation of Kohler propane and diesel-powered generators designed to provide reliable backup power for Pickens County. The scope includes supplying generator systems equipped with essential components such as engine block heaters, flexible fuel lines, sound-attenuated and weather-resistant steel enclosures, stainless steel flexible exhaust connectors, and critical-grade exhaust silencers. Each generator will be paired with an automatic transfer switch (ATS) and integrated with a Kohler DEC 3000 Microprocessor control system, along with a remote annunciator (RSAIII). The project also encompasses factory-authorized startup, operator training, and system load testing using the building's load at startup, with all necessary conduit and wiring included for seamless connection. The generators are to be installed in designated areas specified by Pickens County, with the contractor responsible for constructing a concrete pad (rated at 3,000 psig) as the foundation, incorporating conduit within the concrete. The contract guarantees a comprehensive five-year extended warranty on the entire generator system, along with full factory-authorized maintenance during the first year. The work must be completed within 120 consecutive calendar days from the contract award date, covering all aspects of production, installation, and connection of the generator systems. The project is valued between $500,000 and $1,500,000 and is managed by the Georgia Department of Administrative Services on behalf of Pickens County Government, with a primary contact person named Phillip Dean.

General Info

Agency

Georgia → Pickens County Government

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

Pickens County PE-77197-NONST-2025-000000005 Generator Purchase

DOCX, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 77197 PICKENS PE-77197-NONST-2025-000000005 to PE-77197-NONST-2025-000000005.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Pickens County Government
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Pickens County Government
Office AddressN/A

Full Description

Show more
¿ Furnish and install Kohler propane and Diesel driven generators. ¿ Generator system include engine block heater, flexible fuel lines, sound attenuated enclosure, weather resistance steel enclosure, stainless steel flexible exhaust connector, ¿ Furnish and install ATS (automatic transfer switch) for each generator. ¿ Critical grade exhaust silencer, battery charger, or kohler DEC 3000 Microprocessor control. And RSAIII-Remote annunciator, Factory authorized startup, operator training, and system load testing using building load at beginning and all conduit and wiring for connection. ¿ Generator to be located in area specified by Pickens County and contractor to construct concrete pad (3,000 psig) as foundation for generator with in conduit in concrete. ¿ Five-year equivalent extended warranty on generator system to be provided. ¿ Full first year factory authorized maintenance to be included. The work will consist of producing and installing the generator with all applicable connections and wiring. The work is to be completed within 120 consecutive calendar days from date of the awarding contract.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS