Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)

Closed
W91QF526RA002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for agency staff on inspection tools, and develop comprehensive standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel availability, fee structure, and a proven track record of performing similar projects for utilities or industrial facilities. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as non-collusion and workers compensation. The resulting contract will feature fixed pricing for an initial term with potential one-year extensions. Awardees must comply with California Labor Code prevailing wage requirements and maintain strict confidentiality regarding all agency reports and data.
Inland Empire Utilities Agency

POSTED

about 7 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including the cafeteria, recreation building, and dormitories. Key tasks include performing functional tests by simulating utility outages, replacing failed ballasts with LED-compatible versions, and applying durable labels to fixtures for future tracking. The contractor must ensure full compliance with NFPA 101 (2024 Edition) and NFPA 70 standards, integrate recurring maintenance into the center's Computerized Maintenance Management System, and provide certificates of disposal for hazardous materials. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must include a detailed cost breakout and a mandatory physical site visit. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This solicitation is set aside for small businesses and various SBA-certified categories. Award decisions will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act, Federal Contractor Minimum Wage, and FAR regulations regarding work hours, safety standards, and the Buy American Act.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract titled "Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)" is a solicitation issued by the Department of Defense, specifically the W6QM Micc Ft Lee office, under solicitation number W91QF526RA002. It is designated as a Total Small Business Set-Aside (FAR 19.5) with NAICS code 238210, indicating services related to electrical contractors and other wiring installation. The place of performance is Radford, Virginia, and the contract involves semi-annual preventive maintenance and emergency repair services for generators. A site visit is scheduled for January 7, 2026, at 9:00 AM, with RSVP requested via email to the primary point of contact, Myrisha L. Mullen. The overall response deadline for submissions is January 19, 2026, at 8:00 PM, and the deadline for questions is January 9, 2026, at 3:00 PM. The solicitation package includes important documents such as the Performance Work Statement (PWS), Combined Synopsis, and detailed Contract Line Item Number (CLIN) structures. The CLIN structure details various components and parts related to the maintenance work, providing a breakdown of quantities, unit prices, and references to Navy drawings. The contract aims to secure a qualified small business to perform the generator maintenance and emergency repairs in compliance with the specified requirements.

General Info

Department of Defense seeks small business for semi-annual generator maintenance and emergency repairs in Virginia.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Radford, VA, USA

Set-Aside

SBA

Documents

4

CLIN Structure and Pricing Details

PDF, High priority: read this firstclin-structure
High

Combined Synopsis/Solicitation W91QF5-26-R-A002 Generator PM & ERS

PDF, High priority: read this firstcombined-synopsis-solicitation
High

Combined Synopsis/Solicitation W91QF5-26-R-A002 Generator PM & ERS

PDF, High priority: read this firstcombined-synopsis-solicitation
High

Performance Work Statement for Generator Maintenance at ALTESS Radford

PDF, High priority: read this first33 pages · pws
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc Ft Lee
Contacts2 people available
OfficeFORT LEE, VA, 23801, USA
Office AddressFORT LEE, VA, 23801, USA
Contacts
Myrisha L. Mullen
Octavia Heflin-Smith

Full Description

Show more

ADDENDUM #3 1/9/26


RFI #2


1. Is the 2 hour on site requirement for Emergence call a must have?


       a. Yes.   These are back-up generators that need to be operational within 2hrs or less as IT equipment switches to battery back-up which only lasts for a very short time with the heavy data center load.  


2. Can you clarify the Testing requirements for the Load Banking of each generator ? Load Percentages and time for each level


       a. This is outlined within PWS para 4.1.5.1
                  i. 30 minutes at 20% of rated load of genset.
                 ii. 30 minutes at 50% of rated load of genset.




3. Are there different requirements for each generator?


       a. No, generators are all Caterpillar and follow the same type of load bank testing.


4. How often does the Load Testing happen, and what time of year?


       a. This is outlined with PWS para 4.1.5.1 


               i. Annual load bank test



5. Doing the Advantage ESC, witch CAT Dealership does the report get sent to?


        a. Once the vendor performs services, they return to their office to finalize the service and send a copy to our facilities management team and the COR.  This action usually takes them less than 2-3 days (depending on workload)


END



ADDENDUM #2 1/8/26


An updated Combined Synopsis has been posted.


END



ADDENDUM #1 1/6/26


RFI #1


1. Could you please confirm whether this is a new requirement? If not, we kindly request the incumbent contractor’s name and the previous contract number.


            a. This action is a follow-on requirement


Contract number:  W91QF0-21-P-0040
Contract Awardee:  Virginia Energy & Lighting, LLC.
Description of requirement:  Caterpillar Diesel Standby Generator Preventive Maintenance (PM) and Emergency Repair Services (ERS)
Method of procurement:  Set-Aside Small Business
Contract type:  Firm-Fixed Price
Number of option periods:  4


2. Additionally, are there any notable changes to the scope of work compared to the prior award?


      a. The scope of the contract has changed significantly since the previous award. Key additions include annual Advantage Extended Service Coverage (ESC) certification inspection, load bank testing, battery replacement, consumable parts replacement, and fluid sampling and testing services. These enhancements were introduced to address the requirements brought about by upgraded equipment, improved maintenance procedures, the need for additional coverage for new assets, and expanded preventive maintenance services. Incorporating fluid sampling also helps prevent equiopment  damage, making the new contract more comprehensive and cost-effective by consolidating service that were previously sourced separately at higher expense.


END



This is to confirm that the site visit for the requirement is scheduled for January 7, 2026, at 0900 AM. Please confirm by email to Myrisha Mullen @ myrisha.l.mullen2.civ@army.mil, if you will be in attendance. 


Please find attached the following documents for your reference:


  • Performance Work Statement (PWS)
  • Combined Synopsis
  • CLIN Structure

Additionally, please note that the deadline for submitting questions is January 9, 2026, at 1500 PM. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS