This Solicitation opportunity from Department Of Defense was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract titled "Generator Semi-Annual Preventive Maintenance (PM), Emergency Repair Services (ERS)" is a solicitation issued by the Department of Defense, specifically the W6QM Micc Ft Lee office, under solicitation number W91QF526RA002. It is designated as a Total Small Business Set-Aside (FAR 19.5) with NAICS code 238210, indicating services related to electrical contractors and other wiring installation. The place of performance is Radford, Virginia, and the contract involves semi-annual preventive maintenance and emergency repair services for generators. A site visit is scheduled for January 7, 2026, at 9:00 AM, with RSVP requested via email to the primary point of contact, Myrisha L. Mullen. The overall response deadline for submissions is January 19, 2026, at 8:00 PM, and the deadline for questions is January 9, 2026, at 3:00 PM. The solicitation package includes important documents such as the Performance Work Statement (PWS), Combined Synopsis, and detailed Contract Line Item Number (CLIN) structures. The CLIN structure details various components and parts related to the maintenance work, providing a breakdown of quantities, unit prices, and references to Navy drawings. The contract aims to secure a qualified small business to perform the generator maintenance and emergency repairs in compliance with the specified requirements.
General Info
Place of Performance
Radford, VA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
ADDENDUM #3 1/9/26
RFI #2
1. Is the 2 hour on site requirement for Emergence call a must have?
a. Yes. These are back-up generators that need to be operational within 2hrs or less as IT equipment switches to battery back-up which only lasts for a very short time with the heavy data center load.
2. Can you clarify the Testing requirements for the Load Banking of each generator ? Load Percentages and time for each level
a. This is outlined within PWS para 4.1.5.1
i. 30 minutes at 20% of rated load of genset.
ii. 30 minutes at 50% of rated load of genset.
3. Are there different requirements for each generator?
a. No, generators are all Caterpillar and follow the same type of load bank testing.
4. How often does the Load Testing happen, and what time of year?
a. This is outlined with PWS para 4.1.5.1
i. Annual load bank test
5. Doing the Advantage ESC, witch CAT Dealership does the report get sent to?
a. Once the vendor performs services, they return to their office to finalize the service and send a copy to our facilities management team and the COR. This action usually takes them less than 2-3 days (depending on workload)
END
ADDENDUM #2 1/8/26
An updated Combined Synopsis has been posted.
END
ADDENDUM #1 1/6/26
RFI #1
1. Could you please confirm whether this is a new requirement? If not, we kindly request the incumbent contractor’s name and the previous contract number.
a. This action is a follow-on requirement
Contract number: W91QF0-21-P-0040
Contract Awardee: Virginia Energy & Lighting, LLC.
Description of requirement: Caterpillar Diesel Standby Generator Preventive Maintenance (PM) and Emergency Repair Services (ERS)
Method of procurement: Set-Aside Small Business
Contract type: Firm-Fixed Price
Number of option periods: 4
2. Additionally, are there any notable changes to the scope of work compared to the prior award?
a. The scope of the contract has changed significantly since the previous award. Key additions include annual Advantage Extended Service Coverage (ESC) certification inspection, load bank testing, battery replacement, consumable parts replacement, and fluid sampling and testing services. These enhancements were introduced to address the requirements brought about by upgraded equipment, improved maintenance procedures, the need for additional coverage for new assets, and expanded preventive maintenance services. Incorporating fluid sampling also helps prevent equiopment damage, making the new contract more comprehensive and cost-effective by consolidating service that were previously sourced separately at higher expense.
END
This is to confirm that the site visit for the requirement is scheduled for January 7, 2026, at 0900 AM. Please confirm by email to Myrisha Mullen @ myrisha.l.mullen2.civ@army.mil, if you will be in attendance.
Please find attached the following documents for your reference:
- Performance Work Statement (PWS)
- Combined Synopsis
- CLIN Structure
Additionally, please note that the deadline for submitting questions is January 9, 2026, at 1500 PM.
More opportunities from Department Of Defense → W6QM Micc Ft Lee
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
