This Solicitation opportunity from Iowa was posted on September 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Generators 1 and 5 Control Panel Isolation and CEMS Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the replacement and upgrade of critical environmental and electrical systems at water pollution control facilities, with a focus on the off gas stack Continuous Emissions Monitoring System (CEMS) Carbon Monoxide Analyzer. The project encompasses installing control panel isolation circuit breakers for Generator 1 and Generator 5, as well as replacing the feeder connection between the unit substation USS-5 and the Dewatering Building’s main switchboard SBD-5. The estimated construction cost, as determined by the City Engineer, is approximately $1,130,000. The work aims to enhance environmental compliance and operational reliability at the facility, situated in Cedar Rapids, Iowa, under the jurisdiction of the City of Cedar Rapids. The solicitation, identified as "Generators 1 and 5 Control Panel Isolation and CEMS Replacement," was posted on September 24, 2025, with a response deadline of October 22, 2025. The project falls under NAICS code 335313 and is managed by the Iowa-based organization. Bidders are required to submit various documentation, including a Bidder Status Form to verify their eligibility to bid in Iowa, and a bid bond to ensure proposal security. The procurement process emphasizes compliance with local regulations, proper licensing, and submission procedures, with additional related documents covering other projects such as recycling services, roadway construction, and equipment procurement, reflecting a broad scope of municipal infrastructure and service contracts. The comprehensive approach aims to ensure competitive bidding, transparency, and adherence to project specifications across multiple public works initiatives.
General Info
Place of Performance
IA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
