Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on June 1, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Geotechnical Engineering Services at LBNL For Future Project Planning

Closed
5193Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The University of California, on behalf of the Lawrence Berkeley National Laboratory, is seeking qualifications from professional geotechnical engineering firms for future project planning. The scope of work involves geotechnical investigations and reporting for facilities that may include tunnels, cut and cover construction, and low vibration environments built below the water table in permeable soils. Services required include conducting investigations, establishing design criteria, observing excavations, and providing final as-built reports. To qualify, the primary firm and its sub-consultants must maintain a local office within 75 air miles of Berkeley, California, and employ a team including a geologist and a geotechnical engineer licensed in California. Selection will be based on the firm's recent experience with tunnel and vibration-sensitive laboratory construction, personnel expertise, past performance, and previous work with the Department of Energy or the University of California. Interested firms must submit five copies of Standard Form 330 and a Representations and Certifications form by June 15, 2010.

General Info

UC Berkeley seeks local geotechnical firms for specialized facility investigations by June 15, 2010.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

One Cyclotron Road, BERKELEY, CA, 94720, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Sarah S EaryManager, Construction Real Property Subcontracts

Full Description

Show more
Geotechnical Engineering Services Solicitation 5193 The University of California, Ernest Orlando Lawrence Berkeley National Laboratory (LBNL), which is operated under a Prime Contract DE-AC02-05CH11231 with the U.S. Department of Energy (DOE), intends to subcontract for Professional Geothechnical Engineering services (Geotech) for an investigation for a possible future project. This is not a request for quotation. It is an announcement for subcontracting opportunities with the University of California. Interested firms are encouraged to submit qualifications as indicated herein. A. PROJECT SCOPE SUMMARY The Geotech firm will provide geotechnical services for the future project planning. Studies would likely be conducted at several sites. The project concept would contain the following: 1. A tunnel or "cut and cover" construction. 2. Construction below water table in highly permeable soils. 3. Technical, office and experimental facilities. 4. Low vibration as-built environments. B. SCOPE OF SERVICES The work includes, but is not limited to, professional engineering services: 1. Geotechnical investigations 2. Preparation of a geotechnical report with design criteria for the planned facilities 3. Observation of the excavations to validate geotechnical assumptions 4. Preparation of a final geotechnical report with as built conditions of the installations The University does not guarantee that any subcontract will be awarded as a result of this announcement and reserves the right to award a subcontract for only a portion of the work described. C. MINIMUM REQUIREMENTS In order to qualify, candidates must meet the following minimum requirements: 1. Location: The primary firm and sub-consultants must maintain a local office within seventy-five (75) air miles of Berkeley, California and must assign a principal to lead the effort on behalf of the firm from the local office. All other sub-consultants must be located within the United States. 2. Design Team: The following specialized expertise shall be represented by the proposing teams: a. Geologist b. Geotechnical engineer 3. Qualifications: All work must be sealed by a California-licensed Engineer of the appropriate discipline. 4. Documentation Compatibility: The primary firm and sub-consultants must be able to generate, receive, or convert documents into Microsoft WORD, Microsoft EXCEL, Microsoft Project, and AutoCAD 2010, SAP2000 Version 14, ETABS Version 9, MATHCAD 14. D. SELECTION CRITERIA For firms meeting the above minimum requirements, the following criteria shall be University's basis of selection. The criteria are listed in descending order of importance. 1. Firm Experience: The primary firm and sub-consultants must have recently completed projects that involve tunnel construction and new laboratory construction with vibration sensitive programs. The primary firm shall describe each representative project, and list them in the Standard Form SF 330, Section F, including any other supplemental information necessary to address this criterion. The primary firm must have worked on at least two projects with similar scope in the past five years. 2. Personnel Experience: The principal and individuals assigned to this project must demonstrate successful experience in providing design and construction administration services for tunnel and laboratory projects within the last five years. 3. Past Performance: The primary firm and sub-consultants must demonstrate successful experience in providing design and construction administration services for projects completed within the approved scope, schedule and budget during the last five years. A list of references, including name, current telephone number, and associated project, shall be provided for the University to verify past performance. 4. National Laboratory /University of California / DOE Experience: The primary firm shall demonstrate previous successful experience working for the U.S. Department of Energy, for a National Laboratory, for the University of California, or similar institutions. 5. Assignment of Personnel: The University will consider a primary firm's commitment and its consultant's commitment to dedicate qualified personnel to positions of responsibility for the duration of the project. The University will favorably consider firms that assign the same personnel from similar projects. 6. Small Business Participation: The University will favorably consider a firm's ability to further the University's small business procurement goals. E. SITE VISIT Interested parties may arrange to visit the site. Please contact Erin Beardsley at +1 (555) 000-0000 or via email - contact@example.gov to confirm attendance and arrange for gate access. F. SMALL BUSINESS SIZE STANDARD The North American Industry Classification System (NAICS) Code for this acquisition is 541330, Engineering Services. The corresponding small business size standard for this acquisition is annual receipts of $4.5 Million or less. Annual receipts are to be based on the average annual gross revenue for the past three fiscal years. Interested parties shall indicate their size status on the Lawrence Berkeley National Laboratory Representations and Certifications form. Refer to Subpart 19.1 - Size Standards of the Federal Acquisition Regulation (FAR) for information on calculating the annual average gross revenue. G. SUBMISSIONS Interested firms meeting the requirements described above must submit five (5) completed copies each of U.S. Government Standard Form 330 Parts I and II, a Representations and Certifications form, and any supplemental information necessary to further address the Selection Criteria. The Representations and Certifications form and a copy of this announcement may be found at http://facilitiesprojects.lbl.gov/. Submissions must be received no later than 5:00 PM (PST), June 15, 2010. Submissions that are received after the time and date specified or with insufficient copies of the SF 330 forms may not be considered. Fax copies of the submittal will not be considered. Submissions should be addressed to: VIA US Mail, Courier or Hand Delivery Lawrence Berkeley National Laboratory Procurement - Sarah Eary One Cyclotron Rd. - Mail Stop 76R0211J Berkeley, CA 94720-8288 If you deliver your submission in person, please call Erin Beardsley at +1 (555) 000-0000 one day before submittals are due to arrange a gate pass. H. QUESTIONS Direct any questions concerning this announcement in writing to Sarah Eary via e-mail to : contact@example.gov.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS